[Construction Case] Large Pachinko Parlor: Earthquake Recovery Work / Slab Floor Settlement Correction Work
Settlement due to compaction: Significant sinking of the floor inside the store due to the impact of the Great East Japan Earthquake! We will introduce our response case.
We would like to introduce a case of "earthquake recovery work" and "floor subsidence correction work" carried out at a large pachinko parlor located in Fukushima Prefecture. In this case, the floor inside the store significantly subsided due to consolidation settlement and the impact of the Great East Japan Earthquake. The tilt of the floor caused discomfort while walking inside the store. An up-con method that can be corrected during nighttime when the store is closed was adopted, and our company carried out the subsidence correction work. 【Case Overview】 ■ Construction Area: Approximately 700m2 ■ Maximum Subsidence: 161mm ■ Area: Fukushima Prefecture ■ Construction Period: Continuous 4 nights *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(7)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.mono.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
Company information
We carry out construction work to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using a completely non-fluorinated urethane resin and our unique "Upcon Method" with small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure, such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. We provide total support from on-site surveys nationwide to repair planning and construction, all handled responsibly by our in-house staff. Our specialized and experienced staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.