[Construction Example] Elementary School (Classroom): Floor Sunken Correction Work and Deflection Correction Work
Due to ground subsidence, the classroom floor has sagged! The floor subsidence was corrected in a short work period of one day.
We would like to introduce a case of "sunken floor correction work and deflection correction work" carried out in a classroom of an elementary school in Tokyo. Due to ground subsidence, a maximum of 80mm of sinking occurred in the center of the floor, causing deflection. Concerns for safety and health rendered the classroom unusable. We corrected the sunken areas of the classroom floor from the outer edges towards the center, reducing the sinking to -10mm. The deflection of the classroom floor was resolved, and the work was completed. 【Case Overview】 ■ Construction Area: 63m2 ■ Maximum Subsidence: 80mm ■ Construction Period: 1 day ■ Area: Tokyo *For more detailed information about the case, please refer to the related links. For further details, please check the PDF materials or feel free to contact us.
Inquire About This Product
basic information
*The detailed information about the case can be viewed through the related link. For more details, please refer to the PDF document or feel free to contact us.*
Price range
Delivery Time
Applications/Examples of results
The detailed information about the case can be viewed through the related link. For more details, please refer to the PDF document or feel free to contact us.
catalog(7)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.mono.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
Company information
We carry out construction work to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using a completely non-fluorinated urethane resin and our unique "Upcon Method" with small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure, such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. We provide total support from on-site surveys nationwide to repair planning and construction, all handled responsibly by our in-house staff. Our specialized and experienced staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.