[Construction Case] Elementary School: Filling Work for Gaps Under the Concrete Floor + Correction Work for Concrete Floor Settlement
Our company can offer construction proposals tailored to your needs, such as work scheduled to align with school events!
We would like to introduce a case of "subfloor void filling work + subfloor settlement correction work" carried out at an elementary school in Miyagi Prefecture. Due to the impact of the Great East Japan Earthquake, settlement occurred in various areas within the school, including classrooms, the health room, the principal's office, and the gymnasium. The construction area was approximately 530m2, with a maximum settlement of 71mm and a maximum void volume of 250mm. 【Case Overview】 ■ Construction Area: Approximately 530m2 ■ Maximum Settlement: 71mm ■ Maximum Void Volume: 250mm ■ Area: Aijima Elementary School in Natori City, Miyagi Prefecture ■ Construction Period: August 2013 *For more detailed information about the case, please refer to the related links. For further details, please check the PDF materials or feel free to contact us.
Inquire About This Product
basic information
*The details of the case can be viewed through the related link. For more information, please refer to the PDF document or feel free to contact us.*
Price range
Delivery Time
Applications/Examples of results
*The details of the case can be viewed via the related link. For more information, please refer to the PDF document or feel free to contact us.*
catalog(7)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.mono.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
Company information
We carry out construction work to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using a completely non-fluorinated urethane resin and our unique "Upcon Method" with small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure, such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. We provide total support from on-site surveys nationwide to repair planning and construction, all handled responsibly by our in-house staff. Our specialized and experienced staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.