[Construction Example] Police Academy (Student Dormitory): Void Filling Work
Due to the impact of the Great East Japan Earthquake, a void has formed beneath the hall! Filling work using urethane.
We would like to introduce a case of "void filling work" that we conducted. The construction site is the first-floor hall of a student dormitory at a police academy in Miyagi Prefecture. Due to the impact of the Great East Japan Earthquake, a void occurred beneath the hall, prompting the filling work. The construction area was approximately 45m², with a maximum void depth of 180mm. We injected polyurethane resin, and after the work was completed, we conducted a confirmation of the resin filling using a CCD camera. 【Case Overview】 ■ Construction Area: Approximately 45m² ■ Maximum Void Depth: 180mm ■ Area: Police Academy Student Dormitory in Miyagi Prefecture ■ Construction Period: 1 day (August 2013) ■ Client: Ministry of Land, Infrastructure, Transport and Tourism, Tohoku Regional Development Bureau, Maintenance Division *For more details about the case, you can view the related links. For more information, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
*The details of the case can be viewed via the related link. For more information, please refer to the PDF document or feel free to contact us.*
Price range
Delivery Time
Applications/Examples of results
The detailed information about the case can be viewed through the related link. For more information, please refer to the PDF document or feel free to contact us.
catalog(7)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.mono.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
Company information
We carry out construction work to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using a completely non-fluorinated urethane resin and our unique "Upcon Method" with small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure, such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. We provide total support from on-site surveys nationwide to repair planning and construction, all handled responsibly by our in-house staff. Our specialized and experienced staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.