[Construction Case] Elementary School: Floor Settlement Correction Work and Underfloor Void Filling Work
The floor has sunk due to consolidation settlement! Voids (cavities) can be seen under the floor, and construction will be carried out by our company.
We would like to introduce a case where we performed "floor sinking correction work" and "underfloor void filling work." The construction site was an elementary school located in Gifu Prefecture. Due to consolidation settlement, the floors of the classrooms and art rooms in the school had sunk, and voids (cavities) were also observed under the floor. The area of the sinking correction was approximately 83m², with a maximum sinking amount of 64mm. Additionally, the maximum void amount was 40mm, and the construction period was 2 days. 【Case Overview】 ■ Area of sinking correction: Approximately 83m² ■ Maximum sinking amount: 64mm ■ Area of void filling: Approximately 165m² ■ Maximum void amount: 40mm ■ Area: Elementary school in Gifu Prefecture ■ Construction period: 2 days *For more detailed information about the case, please refer to the related links. For more details, please check the PDF materials or feel free to contact us.
Inquire About This Product
basic information
*You can view the details of the case from the related link. For more information, please refer to the PDF document or feel free to contact us.*
Price range
Delivery Time
Applications/Examples of results
*You can view the details of the case from the related link. For more information, please refer to the PDF document or feel free to contact us.*
catalog(7)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.mono.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
Company information
We carry out construction work to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using a completely non-fluorinated urethane resin and our unique "Upcon Method" with small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure, such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. We provide total support from on-site surveys nationwide to repair planning and construction, all handled responsibly by our in-house staff. Our specialized and experienced staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.