【Safe reduction of construction period and costs with wet method】 Over 1.05 million m2 of construction achievements across Japan! Do you have any concerns regarding asbestos removal work?
- I want to reduce the construction period and costs... - I want to request a company with a wealth of experience... - I want to consult from the planning and estimation stage of the design... - I want to safely carry out construction while suppressing dust dispersion... - I want to reduce the construction period and costs for asbestos removal... Our company handles all aspects of asbestos removal work, including "preliminary surveys, design cooperation, and removal work." Please feel free to consult us about any concerns regarding asbestos! 【Removal Quantity Achievements】*As of the end of March 2024 Approximately 1.05 million m² ⇒ Equivalent to about 700 school-sized buildings (based on 1 school being 1,500 m²) ■ Features of the Water Clean Method - Implemented with a special simultaneous suction attachment for [wetting, spraying, peeling, and suction] - An environmentally friendly technology that peels off asbestos-containing finishing paint while preventing dispersion 〇 Certification and Proof - Construction Technology Examination Certification - Recommended Method for Excellent School Facilities - Patent (automatic sorting, constant wetting, dust dispersion suppression) If you are having trouble with asbestos removal, please feel free to consult us. *For more details, please download the materials or feel free to contact us.
Inquire About This Product
basic information
【Other Features】 - Consistent support from asbestos pre-survey to construction - Uses only water, thus does not pollute the environment - Simultaneously powerfully sucks up wastewater and debris, allowing for construction while preventing scattering - Removes a wide range of coatings including soft, elastic, and hard paint films - Wet method suppresses dust - Efficiently removes inorganic base adjustment materials that cannot be removed with stripping agents - Can easily handle thick multi-layered coatings (paint films) - Equipment is portable, allowing for construction in any location accessible by vehicles (up to about 100m) - Wastewater used is filtered and pH-treated on-site, contributing to cost reduction - Collected removal materials automatically enter a bulk bag without exposure to outside air, ensuring safety and simplifying industrial waste disposal - Exhaust from the suction during removal is treated with a demister and reliably filtered through a jet scrubber before being released into the atmosphere, ensuring safety *For more details, please refer to the related link page or feel free to contact us.*
Price range
Delivery Time
Applications/Examples of results
Supports the removal of asbestos-containing finishing materials and inorganic base adjustment materials. *For more details, please refer to the related link page or feel free to contact us.
Detailed information
-
[Removal Operation] Simultaneously suctioning peeling material and turbid water while moistening.
-
[Removal Work] Change the attachment and also work on the corner areas.
-
[Comparison Image] After Construction (Left Side) - Before Construction (Right Side)
-
After pH adjustment treatment, it is filtered to water that can be discharged through a 0.2μ filter.
-
Treated water will be discharged to the designated local location.
Company information
We, Maruhou, aim to be the number one company that is needed. As we strive to be a company that is essential to everyone in the world, all of our employees will work together to become a company that receives more gratitude in fields where Maruhou's technology can be utilized.