Reduce electricity consumption by up to 1/4 with solar power! Achieve heating and cooling for the entire building with 5 home air conditioners.
We would like to introduce our construction achievements of 2×4 houses at the Shigawood headquarters. The structure, characterized by the high airtightness and high insulation of the 2x4 construction method, is thoroughly implemented. We simulate the heating and cooling consumption based on weather data and mechanical heat quantities, setting the size of windows and insulation performance. Additionally, a spacious atrium structure from the ground floor to the second floor allows for the entire building to be heated and cooled with five household air conditioning units. This uniquely efficient structure is also gaining attention from an ecological perspective and serves as a showroom. 【Case Overview】 ■ Construction Period: November 2014 ■ Type: Large corporate building ■ Property Structure: 2×4 construction, two stories ■ Total Floor Area: 561 m² (170 tsubo) *For more details, please refer to the related links or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.
catalog(2)
Download All CatalogsCompany information
Leave it to us with peace of mind!! Consistent construction from structural design of 2x4 houses to the building process. Leave it to us with peace of mind!! Proposing the optimal logistics system tailored to our customers.