Designed with the improvement of cooling water performance and continuous availability in mind! A case study achieving facility upgrades with zero downtime.
We would like to introduce a case where a system designed with a focus on improving the performance of cooling water and continuous availability was implemented at a data center in the United States. A major data center handling millions of retail transactions had to upgrade its cooling system during the shopping season, necessitating a temporary temperature control system. Our engineers teamed up with cooling tower specialists to design a 1,600-ton temporary cooling system to meet the customer's needs and increased load. During a two-week period, our temporary cooling system maintained the appropriate temperature for the data center. [Case Summary] ■ Challenge: Continue operating the data center in optimal condition during peak shopping season ■ Solution: Chillers and cooling towers designed for maximum availability ■ Result: Facility upgrade, zero downtime, numerous satisfied customers *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company supports customers around the clock to supply the necessary power, as well as heating and cooling. All of this is driven by our trademark passion, unparalleled international experience, and the knowledge gained from it. From urban development to commercial projects and life-saving efforts, we deliver our expertise and equipment anywhere from major cities to remote rural areas.