Don't stop the production line! Temporary cooling solutions for pharmaceutical factories.
Solving customers' problems with the power of energy solutions.
Implementing equipment updates without stopping cooling at all! A temporary cooling solution that protects production lines and quality even under harsh conditions of -15°C.
In pharmaceutical raw material factories, there is a significant challenge of being unable to stop cooling during equipment updates. Aggreko provides temporary cooling solutions that allow production to continue even during the update of refrigeration equipment. Even under harsh conditions of minus 15°C, updates can proceed without halting operations while maintaining stable temperature management. This eliminates the risk of production stoppage due to the replacement of aging equipment, ensuring both quality maintenance and supply stability. Furthermore, with custom designs tailored to the site environment, it is possible to arrange all necessary refrigeration equipment, pumps, and cables in one go. We support factory operations without production loss by realizing "equipment updates without stopping cooling." **Features** - Provision of temporary cooling that does not stop production lines even during equipment updates - Capability to meet stringent temperature requirements such as minus 15°C - Detailed assessment of site conditions to custom design the optimal cooling system - Immediate response with a rich lineup of equipment including 175kW chillers and pumps - One-stop system construction including external procurement of necessary equipment *Free materials with case studies on solving cooling challenges are currently available! Please check the catalog download for more information.*
Inquire About This Product
basic information
■Target Industries Pharmaceutical raw material factories, chemical factories, manufacturing industries where temperature control is essential ■Provided Solutions Temporary cooling systems (including chillers, pumps, and a complete set of cables) ■Background for Implementation Avoiding production stoppage risks associated with the renewal of aging refrigeration equipment ■Example of Implementation Configuration 175kW chiller ×1 PM400 pump ×2 Complete set of related cables Insufficient equipment supplemented through external procurement ■Implementation Effects Zero production stoppage during the approximately 4-month construction period Maintained a stable environment at -15°C Eliminated cooling stoppage risks, contributing to quality and supply stability *Free materials with case studies on cooling challenges are currently available! Please check the catalog download for more information.
Price range
Delivery Time
Applications/Examples of results
*We are currently offering free materials with examples of solutions for cooling challenges! Please check from the catalog download.*
catalog(1)
Download All CatalogsCompany information
Our company supports customers around the clock to supply the necessary power, as well as heating and cooling. All of this is driven by our trademark passion, unparalleled international experience, and the knowledge gained from it. From urban development to commercial projects and life-saving efforts, we deliver our expertise and equipment anywhere from major cities to remote rural areas.




![[Dry Mist Installation Case] Shin-Marunouchi Building (Shin-Marubiru)](https://image.mono.ipros.com/public/product/image/c77/2000967950/IPROS59736711861152960195.jpeg?w=280&h=280)