The heater replacement for the melting furnace is completed in a short time. It features a high-efficiency design that minimizes production downtime and increases on-site operational efficiency.
Eliminating issues frequently encountered with gas furnaces, such as "time-consuming replacements" and "heavy burden on operators." The 'ALHYPER L' features a structure that makes replacement work easy, contributing to increased productivity on site. 【Main Features】 - Easy replacement, significantly reduced downtime - Compatible with existing furnaces for retrofitting - Stable heating even in low bath surface furnaces - Contributes to energy savings and decarbonization For inquiries about short delivery times or implementation consultations, please feel free to download the materials or contact us.
Inquire About This Product
basic information
【Standard Specifications Example】 ■AL HYPER L ・Output: 6kW, 10kW (Power Supply: Single-phase 200V) ・Heating Length: 250mm, 400mm (Protective Tube Length: 600–1,000mm) ・Tube Diameter: φ60 *For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Chubu Electric Power Miraiz Co., Ltd. is a company that was spun off from Chubu Electric Power Co., Inc. as a sales business company within the Chubu Electric Power Group. We face our customers more closely and operate our business swiftly. By delivering new values and services, starting with the "Community Support Infrastructure" that can help solve various social issues, we aim to grow into a presence that enriches our customers' lives and supports their businesses. Please feel free to consult us when you need assistance.



![Single End Radiant Tube Burner [TRF Burner]](https://image.mono.ipros.com/public/product/image/c08/2000793597/IPROS40624651388633756578.png?w=280&h=280)


