If you're troubled by rust and red water in power plants, try "Aqua Crystal Ring."
Handling Company: Archive Co., Ltd.
Dramatically improve murky red water in the rust with transparency! Contributing to the stable operation of power plants.
**For Those Troubled by Red Water in Cooling Systems** Chillers, cooling towers, piping, heat exchangers... We will improve red, murky cooling and circulating water to a clear state! In power plants, red rust in cooling and circulating water can cause corrosion of pipes and reduce the performance of heat exchangers, potentially negatively impacting product quality and production efficiency. Particularly, halting the manufacturing line can lead to significant losses, making rust prevention an important issue. Aqua Crystal Ring addresses these problems by suppressing the occurrence of red rust and improving existing red water to a clear state. **Usage Scenarios** - Measures against red water in cooling and circulating water - Rust prevention for piping and heat exchangers - Stable operation of power plants **Benefits of Implementation** - Improved product finishing accuracy - Reduced defect rates - Decreased frequency of cooling water replacement
Inquire About This Product
Related Videos
basic information
【Features】 - Removes rust and improves the clarity of cooling water - Suppresses the occurrence of red rust and extends the lifespan of pipes and equipment - Can be introduced without installation work and without stopping operations - Comes with a 3-year warranty 【Our Strengths】 We aim to maximize the value of small and medium-sized manufacturing businesses. Utilizing our marketing expertise, we accurately convey the value of products and provide support to ensure they are chosen.
Price information
Please send us the specifications of the equipment (such as chillers, cooling towers, heat exchangers, etc.) that are experiencing issues with red rust and red water, and if possible, current photos of the situation. We will propose the optimal plan and estimate for where and how many units should be installed.
Delivery Time
P3
※After placing the order, we will deliver it within 5 business days. The installation can be done on the same day the product arrives (estimated time: about 10 minutes).
Applications/Examples of results
■Example 1: Major Manufacturer in Tokyo - Chiller Tank "The water that was so red and cloudy has become clear!" Eighteen years have passed since the installation of the heating chiller tank. The water inside the tank was rust-colored and cloudy, and previous measures had only provided temporary effects without fundamental improvement, causing frustration. As a result, the red rust inside the pipes transformed into black rust, and the red water was remarkably improved to clear. (After that, the same product was installed in the cooling chiller tank as well.) ■Example 2: Chemical Manufacturing Company in Tokyo - Cooling Tower "I had given up on the rust, but I never expected it to improve this much!" Fifteen years have passed since the installation of the cooling tower. Previous rust prevention measures were ineffective, and they had somewhat given up hope, but they consulted us hoping for even a slight improvement. Four months after installation, they were extremely pleased, saying, "I never thought it would improve this much!" === We have over 100 successful installations in total === For more details, please visit the following website (Handling Company: Archive Co., Ltd.). https://acr.archives.co.jp/
catalog(8)
Download All Catalogs
Company information
Our company, as a member of Japanese society, aims to contribute to the evolution of society by delivering truly valuable products and services to the world through the skill of sales writing. We believe it is our responsibility to possess the skill to accurately and dramatically communicate "the value that the product or service holds." As a result, we believe this will lay the foundation for a hopeful and prosperous society where everyone can live not according to someone else's values, but according to their own values and in their own way.






![[Chiller Handbook] "Basic Knowledge & Case Studies on Cooling Equipment" *Currently available for free.](https://image.mono.ipros.com/public/product/image/465/2000608190/IPROS85167364167574436792.jpeg?w=280&h=280)
![[Information] Chiller Handbook 2 - How to Read Piping System Diagrams and Cooling Improvement Methods - / Apiste](https://image.mono.ipros.com/public/product/image/2dd/2000608193/IPROS90958254826023560802.png?w=280&h=280)
![[Information] Chiller Handbook - Types and Features of Pumps and Trouble Cases / Apiste](https://image.mono.ipros.com/public/product/image/2c2/2000613806/IPROS64249727217252084535.png?w=280&h=280)
![[Data] Chiller Handbook - 10 Practical Examples of Piping / Apiste](https://image.mono.ipros.com/public/product/image/58f/2000613885/IPROS57497736309505147414.png?w=280&h=280)
