Cost reduction with self-consumption solar power generation for the communication equipment and control device manufacturing industry!
Released from the risk of rising electricity costs. Additionally, save up to 28% on electricity bills! Effective for clean rooms and air conditioning systems. Subsidy utilization and zero initial cost introduction available.
【List of Our Construction Projects and Clients】 Total accumulated construction cost of 908.4 billion yen, with 83 solar power plants built over 12 years. Numerous transaction records with Sharp, Panasonic, Daiwa House, Nomura Securities, Mitsubishi HC Capital, JA Mitsui Leasing, DMM.com, KKR, Macquarie Capital, Canadian Solar, Trina Solar, J Holdings, RE100 Power, Excelsior Japan, WindSmile, B&M Asset Management, AD Works, Sparks Asset Management, Etrion, and many others. Simultaneously reduce costs and CO₂ without stopping high-precision manufacturing equipment! *For more details, please refer to the related links or feel free to contact us. ■ Do you have these concerns? The electricity costs for clean room air conditioning and precision manufacturing lines are enormous. Management is under pressure due to the rapid rise in fuel adjustment costs and renewable energy surcharges. ESG investment and SDGs compliance are being demanded by clients. ■ Comparison Before and After Implementation Before: Clean room and inspection process → High electricity costs After implementation: Same process + rooftop solar for daytime self-consumption → Approximately 28% reduction in electricity costs, increased corporate value through CO₂ reduction.
Inquire About This Product
Related Videos
basic information
Feature 1: "Fixed Cost" for Electricity to Reduce Risk Minimizes the impact of rising fuel adjustment costs and yen depreciation. Ensures long-term business stability. Feature 2: Ideal for Clean Rooms and Precision Manufacturing Facilities High compatibility with air conditioning and power supply systems that operate during the day. Feature 3: Zero Initial Cost Implementation with Subsidies & PPA Utilizes national and local government subsidies, enabling zero equipment costs through the PPA model.
Price information
[Price and Subsidy] Cost: Individual estimates based on roof area and contracted power - Applicable Subsidy: Ministry of Economy, Trade and Industry "Subsidy for Next-Generation Technology Development Demonstration Project" Subsidy Utilization: Up to 2/3 subsidy (region-specific)
Delivery Time
Applications/Examples of results
【Usage and Implementation Results】 ■ Case Study: Saitama Prefecture Communication Equipment Manufacturing Plant Installed Capacity: 180kW Annual Electricity Cost Reduction: Approximately 5,100,000 yen Effect: Covers 50% of daytime clean room air conditioning power ■ Target Facilities Communication equipment and control device manufacturing plants Precision electronic equipment manufacturing lines Inspection and evaluation centers Development labs and testing facilities
Company information
Our company, as a member of Japanese society, aims to contribute to the evolution of society by delivering truly valuable products and services to the world through the skill of sales writing. We believe it is our responsibility to possess the skill to accurately and dramatically communicate "the value that the product or service holds." As a result, we believe this will lay the foundation for a hopeful and prosperous society where everyone can live not according to someone else's values, but according to their own values and in their own way.







