Up to 28% cost reduction in electricity bills with rooftop solar power for the electronics manufacturing industry.
Electricity costs reduced by up to 28%! Also supports a clean environment!
Total construction cost of 908.4 billion yen, with 83 solar power plants built over 12 years. Numerous transactions with leading companies in the industry such as Sharp, Panasonic, Daiwa House, Nomura Securities, Mitsubishi HC Capital, JA Mitsui Leasing, DMM.com, KKR, Macquarie Capital, Canadian Solar, Trina Solar, J Holdings, RE100 Power, Excelsior Japan, WindSmile, B&M Asset Management, AD Works, Sparks Asset Management, and Etrion. Simultaneously reduce costs and CO₂ without stopping high-precision manufacturing equipment! *For details, please download the catalog or feel free to contact us. [Don't make a mistake! Points for choosing a reliable solar power construction contractor] Catalog available now!
Inquire About This Product
Related Videos
basic information
【Industry-Specific Introduction Benefits】 - Contributes to improving the renewable energy ratio, ESG evaluation, and decarbonization management - Can also be utilized as an emergency power source and for BCP measures - Introduction with zero initial costs possible through subsidies and PPA models - Covers the power for air conditioning, constant temperature rooms, and testing equipment to reduce costs 【Introduction Scenarios】 - Coverage of high power consumption areas such as constant temperature and humidity testing rooms and anechoic chambers - Ideal for the base power of operational equipment and power supply units that run during the day - Reduces base power for material transport lines, inspection equipment, and air conditioning
Price information
[Price, Subsidy, Delivery Time] Individual estimates based on scale Subsidy up to 1/2 (varies by municipality and purpose) Estimated delivery time: approximately 2 to 3 months from initial consultation to installation completion PPA plan with zero initial cost is also available - Target subsidy: Ministry of Economy, Trade and Industry "Subsidy for Next-Generation Technology Development Demonstration Project"
Delivery Time
Applications/Examples of results
Case Study [Shizuoka Prefecture - Electronic Control Circuit Board Manufacturer (Installation Capacity: 105kW)] - Self-consumption rate: Approximately 68% - Electricity cost reduction: Approximately 2,900,000 yen per year - CO₂ reduction: Approximately 50 tons per year → Compatible with clean room environments and equipped with electrostatic measures.
Company information
Our company, as a member of Japanese society, aims to contribute to the evolution of society by delivering truly valuable products and services to the world through the skill of sales writing. We believe it is our responsibility to possess the skill to accurately and dramatically communicate "the value that the product or service holds." As a result, we believe this will lay the foundation for a hopeful and prosperous society where everyone can live not according to someone else's values, but according to their own values and in their own way.








