Dedicated solar power generation for metal processing factories, 28% reduction in electricity costs.
"Electricity costs for electric furnaces and press lines reduced by up to 28%" Dedicated for metal processing factories: Rooftop solar power generation system
【Our Construction Numbers and Client List】 Total construction cost of 908.4 billion yen, with 83 solar power plants built over 12 years. Clients include Sharp, Panasonic, Daiwa House, Nomura Securities, Mitsubishi HC Capital, JA Mitsui Leasing, DMM.com, KKR, Macquarie Capital, Canadian Solar, Trina Solar, J Holdings, RE100 Power, Excelsior Japan, WindSmile, B&M Asset Management, AD Works, Sparks Asset Management, Etrion, and many others. Reducing costs and CO₂ simultaneously without stopping high-precision manufacturing equipment! 【Don't Make Mistakes! Points for Choosing a Reliable Solar Power Construction Contractor】 Catalog available now! 【Current Situation Before Installation】 - Operation of high-power equipment such as electric furnaces and laser processing machines is putting pressure on electricity costs. - Fluctuations in electricity prices destabilize profits. 【Changes After Solar Installation】 - Covering daytime electricity with solar power, reducing peak demand. - Stabilizing manufacturing costs and profits. - Contributing to CO₂ emission reductions. *For more details, please download the catalog or feel free to contact us.*
Inquire About This Product
Related Videos
basic information
【Introduction of Features and Functions】 Feature 1: Design Compatible with High Load Equipment Proposes optimal inverter and panel configurations for high-power facilities. High efficiency and stable supply. Feature 2: Utilization of Subsidies & Zero Initial Investment Possible Compatible with national and prefectural equipment installation subsidies. No initial investment required with the PPA model. Feature 3: Effective as a BCP Measure Configuration that can maintain operation of some equipment even during power outages. Strengthening corporate resilience.
Price information
[Price, Subsidies, Delivery Time] Individual estimates based on scale Subsidies up to 1/2 (varies by municipality and purpose) - Target subsidy: Ministry of Economy, Trade and Industry "Subsidy for Next-Generation Technology Development Demonstration Project" Estimated delivery time: Approximately 2 to 3 months from initial consultation to installation completion PPA plan with zero initial costs is also available.
Delivery Time
Applications/Examples of results
【Case Studies】 Aichi Prefecture Press Processing Factory: Annual electricity savings of approximately 4.5 million yen Saitama Prefecture Precision Parts Processing Factory: Achieved a self-consumption rate of approximately 70% 【Usage Examples】 Supports daytime operating loads such as electric furnaces, laser cutting machines, and NC lathes Operated as the primary power supply source for processing lines
Company information
Our company, as a member of Japanese society, aims to contribute to the evolution of society by delivering truly valuable products and services to the world through the skill of sales writing. We believe it is our responsibility to possess the skill to accurately and dramatically communicate "the value that the product or service holds." As a result, we believe this will lay the foundation for a hopeful and prosperous society where everyone can live not according to someone else's values, but according to their own values and in their own way.