Introducing the standard process of the Alon ACC method! The process includes both full treatment and partial treatment.
We are introducing the standard process of the Alon ACC method that we implement. In the case of concrete or mortar substrates, after assessing the substrate condition and criteria, substrate treatment is performed followed by the application of waterproofing membrane. For full treatment or partial treatment, wire brushing, high-pressure washing, and air blowing are conducted, followed by corrections using Alon Kachio Concrete, and then the Alon Wall standard method is applied. 【Process】 ■ Concrete/Mortar Substrate ■ Full Treatment ■ Partial Treatment *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Joscom will thoroughly inspect and investigate the current condition of the buildings and carry out appropriate maintenance and repair work that contributes to their longevity. In our company, many young skilled workers are actively engaged on-site. The fact that our own craftsmen carry out the work requested by customers can truly be described as "direct delivery from the construction site." Joscom will continue to aim for the longevity of buildings and maintain the "direct delivery from the construction site" approach.







![[Example] Preventing metal migration due to moisture in multilayer printed circuit boards.](https://image.mono.ipros.com/public/product/image/984/2000640006/IPROS21370121225881087240.jpeg?w=280&h=280)
![[Example] Using FluoroSurf as a concentrated waterproof spray.](https://image.mono.ipros.com/public/product/image/84e/2000640116/IPROS83989113576455681480.jpeg?w=280&h=280)

