A seismic-resistant unit house that ensures safety and efficiency in fish processing plants.
In fishery processing facilities, hygiene management and a safe working environment are essential. In particular, damage to buildings caused by earthquakes poses a significant risk that can lead to production stoppages and product losses. Our earthquake-resistant unit houses ensure safety within the processing facility even in the event of an earthquake, thanks to their robust steel frame structure. Additionally, standardized units allow for quick installation. Relocation and expansion are also easy, enabling flexible responses to business growth. 【Usage Scenarios】 - Primary processing facilities for seafood - Refrigerated and frozen storage - Employee break areas 【Benefits of Implementation】 - Reduction of earthquake risks - Assurance of a hygienic working environment - Improvement of business continuity
Inquire About This Product
basic information
【Features】 - Strong steel frame structure with excellent seismic resistance - Quality stable standard units - Imported to reduce installation costs - Easy to relocate and expand - Customizable exterior design 【Our Strengths】 Total proposals from various construction projects to IT consulting. A unit house that can be completed simply by connecting the desired components. Implementation and operation of a web sales system for acquiring new customers. Currently expanding operations in day service and various other businesses.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(2)
Download All CatalogsCompany information
Total proposals from various construction projects to IT consulting. A unit house that can be completed just by connecting the desired buildings. Introduction and operation of a web sales system for acquiring new customers. Currently expanding operations in day services and various other businesses.








![[Leveling Correction] Leveling correction of concrete floors "Teratec Method"](https://image.mono.ipros.com/public/product/image/d08/1267539002/IPROS70063422645318547243.jpeg?w=280&h=280)

![[Case Study] Construction Example of High-Temperature Facilities in Factories Using High-Performance Heat Insulation Sheets](https://image.mono.ipros.com/public/product/image/962/2000579577/IPROS04218491152233419232.jpeg?w=280&h=280)
