Is the current painting subcontractor okay? A candid talk about the company we switched to.
(1) The delivery date has become "when it's done, that's the delivery date." (2) It takes more than three days to respond to painting defects. (3) Cost discussions are not being taken seriously. If you can relate to these three points, it’s time to reconsider your outsourcing partner. At Eiwa Kogei, you can bring in your items and receive a rough estimate on the same day. Feel free to take the first step towards switching. 【Do you have any of these concerns?】 - The delivery date has become "when it's done, that's the delivery date." - Pre-treatment and painting are managed by different companies, making it difficult to coordinate. - Response to painting defects is slow. - Cost review discussions are not being taken seriously.
Inquire About This Product
basic information
【Flexible Response System】 - Same-day rough estimates available (with physical samples or drawings) - Emergency repainting: within 3 days, up to 5,000 pieces - Unified contact point from pre-processing to delivery - Stable supply system of 300,000 pieces per month, 100 types, and 30 colors - In-house 2-ton truck delivery in Osaka Plain, Yao, and Higashi-Osaka areas - ISO 9001 certified, established in 1958 (over 60 years of experience)
Price range
Delivery Time
Applications/Examples of results
Consideration of switching paint outsourcing partners Review of delivery times, quality, and costs Purchasing, procurement, and design personnel Companies that separate pre-treatment and painting to different contractors
Company information
We are not just a "subcontracted painting factory." Established in 1958, our company has a foundation of painting technology and also specializes in chemical treatment, stripping, and cleaning, functioning as the "external surface treatment department" in your organizational chart. Based on our philosophy of "preparation is eight-tenths of the work," we emphasize participation from the "upstream process" before the drawings are finalized. We conduct test painting on a wide range of metals and difficult materials, and we produce the entire process from assembly, packaging, to delivery, thereby reducing your management workload. Additionally, by being able to perform zinc phosphate treatment in-house, we achieve stable painting quality. Furthermore, our micro-heating stripping technology, which does not use chemicals, maintains the electrical state of the "jigs (hangers)" that influence painting quality. Our approach of "pre-treatment determines painting quality" ensures the stability of the paint film during mass production. Rather than simply "applying specified standards," we work backwards to achieve optimal painting specifications and prevent scratches during transportation, sparing no effort in thorough discussions from the outset. This diligent preparation is the shortest path to preventing rework and minimizing total costs. From the development stage, please utilize the expertise of our specialists as part of your production line.





