Example of Technical Proposal Utilization: Construction Work for ○○ Drainage Pumping Station
Prevent contact accidents with cranes and sheet piles caused by the scattering of materials due to strong winds and the swaying of barges due to waves.
■On-site Issues: Points of Focus in Evaluation (Example) "This construction involves the installation of sheet piles using a crane-equipped barge. It is necessary to prevent accidents involving the crane and sheet piles due to material scattering from strong winds and the swaying of the barge caused by waves during the construction period."
- Company:シスメット 本社/福岡県北九州市 ・東日本営業所/埼玉県入間市 ・北日本営業所/北海道札幌市
- Price:Other