[BIM Software Implementation Case Study] 2020 Dubai International Expo
Easily coordinate with other stakeholders! Here is an example of how we solved challenges with "Tekla Structures."
We would like to introduce a case study of BIM software implementation at the "2020 Dubai International Expo Mobility Pavilion." In this project, Tiger Steel was responsible for everything from the detailed design and fabrication of the steel structure, including the examination of joints, to construction. The three-dimensional structure and complex joints were very challenging, but this was resolved by using "Tekla Structures." The biggest advantage of using this software is that it makes coordination with other stakeholders easier. [Case Overview] ■ Challenge: The three-dimensional structure and complex joints were very difficult. ■ Result: This was resolved by using Tekla Structures. ■ Benefit: Coordination with other stakeholders became easier. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩
- Company:トリンブル・ソリューションズ
- Price:Other