We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Construction method.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Construction method Product List and Ranking from 476 Manufacturers, Suppliers and Companies | IPROS GMS

Last Updated: Aggregation Period:Aug 05, 2026~Sep 01, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Aug 05, 2026~Sep 01, 2026
This ranking is based on the number of page views on our site.

  1. 緑化計画研究所 Kanagawa//retail
  2. フルサト工業 建材開発部 Osaka//Building materials, supplies and fixtures
  3. メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡 Tokyo//Building materials, supplies and fixtures
  4. 4 双和化学産業株式会社 Hyogo//others
  5. 5 null/null

Construction method Product ranking

Last Updated: Aggregation Period:Aug 05, 2026~Sep 01, 2026
This ranking is based on the number of page views on our site.

  1. Rooftop greening system - rooftop greening without the need for irrigation - evergreen Kiri grass bag method. 緑化計画研究所
  2. Rooftop greening, folded plate roof greening, wall greening, easy greening, evergreen Kiri grass bag method. 緑化計画研究所
  3. Corner steel pipe column on-site no-welding joint method 'Column Coupler' フルサト工業 建材開発部
  4. 4 Anti-corrosion resin lining system Shukura 双和化学産業株式会社
  5. 5 Exposed-type elastic fixed column base method "Free Base Method" フルサト工業 建材開発部

Construction method Product List

661~690 item / All 1400 items

Displayed results

SSL Permanent Anchor Method (Circumferential Friction Tip Compression Type Anchor) CE Type

The SSL-CE type anchor contributes to the rationalization of slope disaster prevention work through technology and cost-effectiveness.

The SSL-CE type anchor method achieves excellent stress distribution characteristics through a compression-type support mechanism that is less prone to tensile cracking in the grout and a load-bearing body that effectively disperses the load.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

TFC pressure-receiving body construction method

A construction method that can be implemented faster than on-site pressure plates and at a lower cost than large secondary product pressure plates!!

【Features】 (1) The construction process is short because it does not require on-site formwork processing. (2) The components are lightweight and there are few types. (3) They are factory-processed products, ensuring stable quality. (4) The construction management period is short, and there is little effort required for quality and shape management. (5) It has a significant unevenness adjustment function. (6) There is little waste material, resulting in a small environmental burden.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

SSL Permanent Anchor Method (Expanded Hole Support Type Anchor) Type P and Type M

The SSL permanent anchor method consists of two types: the P type and the M type, both of which are expansion pressure support methods.

The SSL-P type anchor body is suitable for clay and weathered rock, where the anchor fixation part is enlarged, and an anchor body is formed inside the enlarged hole using grout. This method ensures anchor capacity based on the bearing strength of the fixed ground in the enlarged section. The SSL-M type anchor body is suitable for soft to medium hard rock, where after enlarging the anchor fixation part, the anchor body is inserted and expanded in the enlarged section, ensuring anchor capacity based on the bearing strength of the fixed ground in that section. NETIS registration number: HR-990015-A.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Microbial soil conditioner with plant activators - Pitch Soil

The trump card for turf improvement. The key to soil improvement for sports turf. Water retention, nutrient retention, permeability, resistance to compaction, beneficial microorganisms, minerals, and trace elements.

Pitch soil is a soil amendment made by mixing high-quality granulated rock wool as the main material with peat moss, perlite, zeolite, and vermiculite, along with a blend of microbial soil plant activators and polysaccharide organic matter. It demonstrates excellent effects in improving the physical, chemical, and biological properties of the soil.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

屋上緑化工法 「グロウシステム」

シンプルかつ安心な屋上緑化を実現!

「グロウシステム」は、シンプルかつ安心な屋上緑化を実現する屋上緑化工法 です。 簡易的な防水保護と耐根性能を持ち合わせる「防根フィルム(NCKフィルム)」や、薄層屋根緑化での保水量アップとスムーズな排水を行う「保水排水基盤(ソイレンマット M30)」などの屋上緑化に最適な資材を使用しています。 【特徴】 ○シンプルかつ安心な屋上緑化を実現 詳しくはお問い合わせ、またはカタログをダウンロードしてください。

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Environmentally friendly product "Purapin"

Lightweight and safe, with several times the pull-out strength of conventional products.

"Purapin" is a plastic pin that is ideal for vegetation nets and artificial turf. It is lightweight and safe, with several times the pull-out strength of conventional products. It is an environmentally friendly product made from waste (waste plastic) that helps in resource recycling. 【Features】 - Perfect for securing grass, vegetation nets, and vegetation mats - Lightweight compared to metal options For more details, please contact us or download the catalog.

  • Other consumables
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Alkaline soil regeneration material "Dr. pH" [*NETIS registered*]

Neutralize contaminated alkaline soil and regenerate it into green soil! Would you like to reduce the cost of waste disposal and reuse it?

The alkaline soil regeneration material "Dr.pH" is effective for all types of alkaline soil. Strongly alkaline soil is treated as "industrial waste," leading to high disposal costs and developing into serious environmental issues such as alkaline contamination. In response to this problem, we developed this product with the aim of regenerating alkaline contaminated soil for greening purposes. 【Five Distinct Features of Dr.pH】 - Regenerates soil for greening and reduces the amount of leftover soil - Cuts costs by 50% through neutralization and reuse - Plants can be installed 10 to 24 hours after application - Made from materials that are harmless to humans and the environment - Easy to mix with soil *For more details, please contact us or download the catalog.

  • Other consumables
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Example 2 of Greening: Erosion Control Agent Klicote CP-750

Introducing an example of using "Cricote CP750" for winter dam slope greening construction!

We would like to introduce an example of using the erosion prevention agent "Kricote CP-750," which forms a strong bonding foundation layer, in the greening work of dam slopes. 【Greening Example: Iwate, Korikawa Dam Slope Greening Work】  ■Method: Air pressure spraying method (5cm of topsoil)  ■Foundation materials, etc.: Organic foundation materials, chemical fertilizers, seeds/grass  ■Used agent: Powder-type erosion prevention agent "Kricote CP-750" 1kg/m3 ◎Construction conditions and measures  ■Target slope is steep rocky ground, winter construction from November to December ◎Post-construction situation  ■After wintering, there was no erosion due to rainfall, and germination and growth were good. *For more details, please refer to the materials. Feel free to contact us with any inquiries.

  • Other consumables
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Example 3 of Greening: Erosion Preventive Agent Kuri Coat C-710

Introducing an example of slope greening work using pressure spraying with a combination of erosion control agents and water-retaining agents.

We would like to introduce an example of road slope greening work that used the erosion control agent "Kricote C-750," which is resistant to rainfall, in combination with the water-retaining agent "Grass Power G-500." 【Example of Greening: Aomori, Tomon District Slope Greening Work】  ■Method: Air pressure spraying method (3cm of topsoil)  ■Base materials: Park compost, peat moss, advanced chemical fertilizers, etc.       Seeds/grasses, and other plants like mugwort and lespedeza  ■Chemicals used: Erosion control agent "Kricote C-710" 4kg/m3        Water-retaining agent "Grass Power G-500" 1kg/m3 used in combination ◎Construction Conditions and Measures  ■The target is rocky slopes, and to protect germination and growth,   the establishment of a growth base through the mixing of the water-retaining agent and overwhelming spraying ◎Situation After Construction  ■There was no erosion due to rainfall, and the combination of the water-retaining agent resulted in extremely good germination and growth. *For more details, please refer to the materials. Feel free to contact us with any inquiries.

  • Other consumables
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Example 4 of Greening: Erosion Control Agent Kuri Coat C-710

Introducing examples of greening projects using aerial seeding with erosion control agents and adhesives.

We would like to introduce an example of road slope greening work using the rain-resistant erosion prevention agent "Klicoat C-750" and an adhesive. 【Example of Greening: Aerial Seeding Greening Work in Otaki Village, Nagano】  ■ Method: Aerial Seeding Method  ■ Base Materials: Organic matter, chemical fertilizers, seeds, etc.  ■ Chemicals Used: Erosion prevention agent "Klicoat C-710" 10kg/100m2        Additionally, adhesive 0.15kg/100m2 used ◎ Construction Conditions and Measures  ■ The target area is a vast mountainside that was washed away by a landslide due to a disaster.   Despite the poor conditions of construction in November,   there was no erosion from winter to spring, and germination and growth were good. *For more details, please refer to the materials. Feel free to contact us.

  • Other consumables
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Erosion control agent for slope greening "Kuri Coat C-710A"

An erosion control agent for slope greening that forms a vegetation foundation resistant to rainfall. It has good germination and growth characteristics.

The "Kuri Coat C-710A" is an erosion control agent for slope greening that prevents erosion caused by rainfall. It forms a strong consolidated layer that is rich in water retention and air permeability, and is resistant to rainfall. The germination and growth of plants after application are also favorable. No heavy metals are detected, and no environmental hormones are used at all. 【Features】 ■ Forms a vegetation base (consolidated layer) that is resistant to rainfall ■ The consolidated layer is rich in water retention and air permeability ■ Good germination and growth ■ No heavy metals detected ■ No environmental hormones used ■ Ingredients: Synthetic resin emulsion *For more details, please refer to the materials. Feel free to contact us with any inquiries.

  • Other consumables
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Landscape artificial turf "Clover Turf (Heat-Resistant Type)"

Surface temperature control, uniform color, and a fluffy feel. Healing artificial grass created with people in mind.

"Clover Turf (Heat-Resistant Type)" is a high-spec artificial grass that incorporates additives with temperature suppression effects into each individual blade of grass, providing long-lasting heat shielding effects. The straight-haired sections are unified in a single color, resulting in a finish reminiscent of the meadows of the Netherlands. The bright grass color creates a spacious and pleasant atmosphere. Additionally, this product features a luxurious grass height of 45mm, offering a plush feel. Both durability and grass retention are exceptional. 【Features】 ■ Fire-resistant performance compliant product ■ Surface temperature suppression ■ Color uniformity ■ Plush usage feel ■ A combination of aesthetics and functionality *For more details, please refer to the PDF document or feel free to contact us.

  • Other consumables
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Landscape artificial turf "Clover Turf (matte type)"

The matte grass shines in random directions! Natural and super realistic artificial grass.

"Clover Turf (matte type)" is a landscape artificial grass that closely resembles real grass by using a total of four colors of grass fibers. Thanks to unique technology, the shine (reflection) of the artificial grass is minimized, resulting in a natural and ultra-realistic finish. Additionally, the grass fibers are woven at intervals that have been researched to appear natural, recreating a random grass direction. 【Features】 ■ Uses a total of four colors of grass fibers for a realistic appearance ■ Fire-retardant certification obtained ■ Comes with a reliable fire-retardant materials label ■ Emphasizes a more natural appearance ■ Recreates random grass direction *For more details, please refer to the PDF document or feel free to contact us.

  • Other consumables
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Civil drainage system using drain belts and drain pipes.

Streamlining construction, shortening processes, and improving economic efficiency! An environmentally friendly drainage system.

The "Civil Engineering Drainage System Utilizing Drain Belts and Drain Pipes" is a buried drainage construction method that excels in water collection and drainage performance, using drain belts and drain pipes that do not clog. The drain belt can be adjusted in length, making it possible to install under any conditions. It enables drainage treatment of both infiltrated water and spring water, thereby improving drainage functionality. 【Features】 ■ Does not clog or become obstructed by roots ■ Efficiently drains infiltrated water and rising water (spring water) ■ Reduces labor in construction ■ Shortens the construction process ■ Improves cost-effectiveness ■ Can minimize impact on surrounding soil *For more details, please refer to the PDF materials or feel free to contact us.

  • Other contract services
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

One-shot long-lasting fertilizer 'Rainbow Coat 120-day type'

Long-lasting fertilization effect from the early stage! High nitrogen content makes it suitable for turf grass.

"Rainbow Coat 120-Day Type" is a long-lasting fertilizer that contains a 120-day type coated fertilizer as a base fertilizer. It provides a gradual and prolonged fertilization effect from the start, making it suitable for grass growth. The guaranteed nutrient composition is 16-5-10. Please feel free to contact us if you have any inquiries. 【Features】 ■ Contains a 120-day type coated fertilizer ■ Prolonged fertilization effect from the start ■ High nitrogen content ■ Long-lasting fertilization effect ■ Granular form for labor-saving *For more details, please refer to the PDF document or feel free to contact us.

  • Other consumables
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

One-shot long-lasting fertilizer 'Rainbow Coat 360-day type'

The guaranteed components (%) are 16-5-10! Introducing a labor-saving fertilizer that maintains its effectiveness for an extended period.

The "Rainbow Coat 360-Day Type" is a long-lasting fertilizer designed for initial application. It contains a 360-day coated fertilizer that gradually releases nutrients over an extended period. Additionally, due to its high nitrogen content, it can be used not only for turf grass but also for slope greening primarily consisting of various plants and green trees. 【Features】 ■ Guaranteed components (%): 16-5-10 ■ Contains 360-day coated fertilizer ■ High nitrogen content *For more details, please refer to the PDF document or feel free to contact us.

  • Other consumables
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Hardparlite

Increased pressure resistance, strength, and hardness! Ensuring a stable drainage layer that can withstand soil pressure through hard-baking treatment.

"Hard Paralite" is a high-pressure resistant hard paralite. When creating planting bases in reclaimed land, this product has been processed through hard baking to ensure a stable drainage layer that can withstand soil pressure. It excels in drainage, permeability, air permeability, and pressure resistance, creating a stable drainage layer. Please feel free to contact us if you have any requests. 【Specifications (excerpt)】 ■ Particle size: 7mm to 15mm ■ Product packaging: 1,000L (1m3) in a bulk bag / 100L in a poly bag *For more details, please download the PDF or feel free to contact us.

  • Soil improvement
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Warehouse and Factory in Sapporo City, Hokkaido

We would like to introduce a case where we made corrections in a short time without interrupting the customer's operations!

This is a case study of floor sinking correction work and void filling work conducted at a warehouse and factory located in Sapporo City, Hokkaido. Due to floor sinking, the racks used for storing goods had become tilted. As a temporary measure, spacers were used under the racks to adjust their height and level them. The sinking correction work was carried out in a limited space, and within a few hours, the floor was made flat. Additionally, sinking correction work was performed in the office without interrupting the customer's operations. [Case Study] ■ Total construction area: Approximately 334 m² ■ Maximum sinking amount: 105 mm ■ Construction period: 3 days *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Residential Upcon Method (Concrete Floor Slab Settlement Correction Method)

For sinking correction work on slab foundation houses due to earthquakes or ground subsidence, leave it to Upcon!

Do you have any of these concerns? ✓ The house is leaning ✓ There are gaps in the windows and sliding doors ✓ The entrance and windows do not close properly ✓ There is a sense of discomfort when entering the room ✓ Doors open and close on their own ✓ Experiencing dizziness or headaches ✓ There are cracks or wrinkles in the wallpaper ✓ Balls roll on their own ✓ Water flow has worsened ✓ The water in the aquarium is not level With Upcon, we can quickly correct the tilt of your home! ■ Upcon Method (Concrete Floor Slab Settlement Correction Method) We inject special foam urethane resin under the concrete of the foundation of the house where the tilt has occurred, making adjustments in millimeter increments while constantly monitoring the level. The injected resin expands in a short time, compressing and reinforcing the ground while lifting the foundation to restore it to a straight position. We conduct surveys and construction anywhere in Japan, 365 days a year, including weekends and holidays. Our qualified in-house staff will assist you!

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Upcon Co., Ltd. Company Profile

Upcon is a company that solves problems with 'urethane.' We quickly correct floor sinking, unevenness, tilting, and gaps using rigid polyurethane resin.

Upcon quickly corrects concrete floors that have experienced sinking, unevenness, tilting, gaps, and vibrations due to ground subsidence and earthquakes without halting operations. We repair tilted concrete floors in factories, warehouses, and stores, which are the bases of corporate production and sales activities, as well as in general residences affected by earthquakes and ground subsidence. Additionally, we engage in public works projects using technologies developed through various research and development projects to restore the functionality of aging social infrastructure such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is one-tenth that of conventional methods. 2. No operational stoppage: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-sinking compared to conventional methods. We provide total support from on-site investigation to repair planning and construction, all handled responsibly by our in-house staff. Our specialized and experienced staff propose optimal repair plans tailored to the customer's site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Factory/Warehouse] Upcon Method (Concrete Floor Slab Settlement Correction Method)

If you have tilting, steps, or gaps in factory or warehouse floors due to earthquakes or ground subsidence, then Upcon!

Do you have any of these concerns? ✓ Unable to secure the level of machinery ✓ Warehouse items are not stacked straight ✓ Uneven surfaces make it difficult for forklifts to operate ✓ Cracks are forming in the floor ✓ Gaps are appearing between the floor, walls, and ceiling ✓ Water is pooling due to floor sagging ✓ Insects are appearing inside the building We can solve these problems with Upcon! ■ Upcon Method (Concrete Floor Slab Settlement Correction Method) Concrete floors that have settled, become uneven, tilted, or developed gaps due to ground subsidence and other causes. The Upcon method corrects such floors quickly without stopping operations. Since it can be performed without breaking the existing floor, the construction period is significantly reduced to about 1/10 compared to conventional methods (concrete replacement). There is no need to remove items or machinery, or to install large plants, allowing for construction without halting operations. We conduct surveys and construction anywhere in Japan, 365 days a year, including weekends and holidays. Our in-house staff, equipped with the necessary skills and qualifications, will assist you! *For more details, please visit the external link page or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Store] Upcon Method (Concrete Floor Slab Settlement Correction Method)

Tilt, steps, and gaps in the store floor caused by earthquakes or ground subsidence. We will make corrections quickly without stopping operations!

Do you have any of these concerns? ✓ Cracks in the floor ✓ Gaps in the floor, walls, or ceiling ✓ Issues with the automatic door opening and closing ✓ Shopping cart moves on its own when you let go ✓ The floor is sagging ✓ Feeling dizzy and losing balance when entering the store ✓ Product racks are tilted We can solve these problems with Upcon! ■ Upcon Method (Concrete Floor Slab Settlement Correction Method) Concrete floors that have settled, have steps, tilts, or gaps due to ground subsidence and other causes. The Upcon method corrects such floors quickly without stopping business. Since it is performed without breaking the existing floor, the construction period is significantly reduced to about 1/10 compared to traditional methods (concrete replacement). There is no need to move or remove product racks or refrigerated cases, and installation of large plants is also unnecessary, allowing for construction without halting operations. We conduct surveys and construction anywhere in Japan, 365 days a year, including weekends and holidays. Our own staff, equipped with skills and qualifications, will assist you! *For more details, please refer to the external link page or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Correcting floor subsidence and tilt in stores/commercial facilities without stopping operations!

Floor subsidence caused by earthquakes and ground sinking. The subsidence correction specialist, Upcon, will fix the existing floor without demolition and in a short period! Over 3,000 successful cases nationwide!

□ Store fixtures and product racks are tilted □ Shopping carts move on their own □ Luggage and products are not stacked straight □ Gaps are forming in the floor, walls, and ceiling □ Cracks are appearing in the floor The issues caused by floor subsidence, tilting, and unevenness will be resolved by "Subsidance Correction Specialist Upcon." With the Upcon method, polyurethane resin is injected under the existing concrete floor, and the pressure from the foaming strengthens the ground and lifts the floor. In principle, there is no need to demolish the existing floor, and there is no need to move heavy product racks or store fixtures, significantly shortening the construction period compared to conventional methods. Additionally, we can accommodate construction limited to nighttime outside of business hours, allowing us to correct floor subsidence without stopping operations.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Large Shopping Center: Correction of Sunken Concrete Floor

Correction made during the night while operations were suspended! A case where two construction plant vehicles were used to expedite the construction schedule.

A large shopping center experienced significant floor subsidence due to weak ground. Gaps were observed in various places, such as between the floor and walls and between the walls and ceiling, caused by the subsidence. As a result, our company implemented repairs. The "Upcon Method," which can be executed during nighttime while the business is closed, was adopted for the repairs. To expedite the construction period, two construction plant vehicles were utilized, and the repairs were completed over 25 nights. 【Construction Overview】 ■ Construction Area: Approximately 3,240m2 (Backyard 405m2, Inside Store 2,835m2) ■ Maximum Subsidence: 94mm ■ Repairs completed over 25 nights ■ Two construction plant vehicles used to expedite the construction period For more details, please feel free to contact us via PDF download or inquiry form.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Shopping Center (Iwate Prefecture): Subfloor Settlement Correction Work

Maximum settlement 71mm, maximum gap 190mm! Conducting polyurethane resin injection work while constantly checking the level!

A shopping center where widespread floor subsidence was observed due to ground subsidence. Due to the floor subsidence, gaps appeared between the floor and walls, causing various issues within the stores. As a result, our company implemented repairs. The "Upcon Method," which can be executed at night during the business closure, was adopted for the repairs. Additionally, since voids were also observed under the floor, filling work was carried out. 【Construction Overview】 ■ Construction Area: Approximately 540m² ■ Maximum Subsidence: 71mm ■ Maximum Void: 190mm ■ Construction completed in 2011, with repairs conducted over 7 consecutive nights. *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Quickly correct the factory floor's slope and the gaps under the floor with rigid polyurethane foam resin!

Correcting floor tilts caused by earthquakes and ground subsidence without stopping operations and in a short period! No need to move machines or equipment! Also suppressing any concerning vibrations from the machines!

■ The machine cannot be leveled. ■ The machine is tilted and vibrating. ■ Malfunctions are occurring in the machine, leading to an increase in defective products. ■ Gaps have formed in the floor, walls, and ceiling. ■ Cracks have appeared in the floor. The "Upcon Method" solves problems caused by floor tilting and sagging due to earthquakes or ground subsidence, as well as voids and gaps that have formed beneath the floor, using polyurethane resin for quick repairs. 【What is the Upcon Method?】 Small holes with a diameter of 16mm are drilled into the existing concrete floor where subsidence has occurred. While continuously monitoring the level in millimeter increments, polyurethane resin is injected. The resin injected beneath the floor expands under pressure in a short time, compacting and strengthening the ground, improving bearing capacity, and pushing the concrete back to a level position. The final strength of the resin is achieved in about 60 minutes. Even if voids have formed beneath the floor, the same method is used to fill those voids. Since the existing concrete floor is repaired without demolition, the construction period is significantly reduced compared to conventional methods. The polyurethane can lift the floor with a foaming pressure of up to 10 tons per square meter, eliminating the need to move heavy equipment or materials. The deformation of the floor is corrected without stopping the production line.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Road Concrete Pavement Slab Settlement Correction Method Achieves Early Lifting of Traffic Restrictions

We will correct the irregularities such as steps and flapping that have occurred in the concrete pavement slabs using specially developed high-strength polyurethane resin, without excavation and within a short construction period.

Using a specially developed high-strength polyurethane resin, we will correct the deformation such as steps and fluttering that occur in concrete pavement slabs commonly used on highways, as well as fill the gaps and voids that have developed under bridge deck slabs, all without breaking the existing concrete pavement and within a short construction period. Injecting polyurethane resin will also improve the loosening of the subgrade. Additionally, it enables the lifting of joints with polyurethane resin along with the bearing slab, fundamentally resolving the issue of correcting the step at the joint, which traditionally required excavation and long-term continuous restrictions or road closures.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Fukushima Prefecture, Soma Port Port Maintenance Management Work (Quay Restoration)

Due to ground subsidence at the harbor quay, there are steps and depressions in the concrete pavement slabs, resulting in the loss of water gradient and the formation of puddles. This issue is resolved using the upcon method.

The Upcon method, which allows for modifications without breaking existing concrete pavement slabs and within a short construction period, has been widely adopted in public works such as roads and airports as a maintenance and repair method. This time, we will introduce a construction site for correcting the sinking of concrete pavement slabs and filling voids at a quay in a port. The quay at Soma Port in Fukushima Prefecture, where cargo loading and unloading occurs frequently, has experienced issues due to ground subsidence, resulting in steps and sinking in the concrete pavement slabs, eliminating the water slope and causing puddles. This has hindered cargo operations. The Upcon method was chosen because it has no environmental impact compared to other methods and can correct the existing slabs without removal in a short period. [Site Information] Soma Port Port Maintenance and Management Work (Quay Restoration) Construction Area: Approximately 285 square meters Maximum Subsidence: 97mm Construction Period: 4 days For detailed information on the construction process, please refer to the PDF download below.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Bag Manufacturing Factory: Floor Slab Settlement Correction Work and Underfloor Void Filling Work

The machine's level cannot be secured, and spacers are being used. A malfunction has occurred in the machine, affecting product accuracy. This can be resolved with the up-con method.

This time, we will introduce a case study of a bag manufacturing factory in Miyagi Prefecture. Due to the impact of the Great East Japan Earthquake that occurred in March 2011, the floor sank, causing the machines to tilt and hindering production. The Upcon method was adopted because it allows for quick corrections without moving the machines. "We cannot secure the level of the machines and are using spacers." "Malfunctions have occurred in the machines, affecting product accuracy." We receive many inquiries about floor repairs like these at Upcon every day. The feature of the Upcon method is that it can correct floor subsidence in a short time, but another significant advantage is that it does not require the movement of machines or materials for construction. [Site Information] Miyagi Prefecture, Bag Manufacturing Factory Construction Area: Approximately 730 square meters Maximum Subsidence: 111mm Construction Period: 3 days For more details about the construction process, you can view it by downloading the PDF below.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Correction Work for Settlement of Logistics Warehouse - Step Adjustment

"Due to the formation of a step in the floor, a ramp was installed." "The floor has settled, causing cracks." Resolved with the up-construction method.

This time, we will introduce a construction case of a logistics warehouse in Niigata Prefecture. In this logistics warehouse, unevenness and cracks occurred in the floor slab due to ground subsidence, which hindered the movement of carts and operations. The Upcon method allows for construction to be carried out without stopping operations and within a short construction period. Additionally, during the polyurethane resin injection, a surveyor is present at all times to manage the floor level in millimeter increments, ensuring a high-quality finish. 【Site Information】 Niigata Prefecture / Logistics Warehouse Construction Area: 1,148 square meters Maximum Subsidence: 71mm Construction Period: 8 days

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration