We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Construction method.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Construction method Product List and Ranking from 39 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Jul 23, 2025~Aug 19, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Jul 23, 2025~Aug 19, 2025
This ranking is based on the number of page views on our site.

  1. フルサト工業 Osaka//Building materials, supplies and fixtures 建材開発部
  2. スワロー工業 Niigata//Building materials, supplies and fixtures
  3. null/null
  4. 4 null/null
  5. 5 null/null

Construction method Product ranking

Last Updated: Aggregation Period:Jul 23, 2025~Aug 19, 2025
This ranking is based on the number of page views on our site.

  1. Solar Mounting System D-SWAT SAMURAI Replacement Method スワロー工業
  2. Dye Q reinforcement method *Repairs for missing areas and anti-corrosion processing are also available!
  3. Corner steel pipe column on-site no-welding joint method 'Column Coupler' フルサト工業 建材開発部
  4. 4 Rapid-curing polyurethane spray waterproofing method "Rim Spray"
  5. 5 Heat Exchange Tube Sealing Method "Mechanical Plug - Pop-A-Plug"

Construction method Product List

331~345 item / All 917 items

Displayed results

SC pile stud method

Design and construction that maximizes the performance of piles is possible! Reduces the excavation volume of the pile hollow section by 78-95%.

The "SC Pile Stud Method" involves welding deformed steel bars to the head of precast concrete piles, connecting the precast concrete piles to the foundation slab. The selection of precast concrete piles is based on soil conditions, site conditions, and structural conditions, and is applicable to all three types: PHC piles, PRC piles, and SC piles. Additionally, it is suitable for low-rise buildings. 【Features】 ■ Design and construction that maximizes pile performance ■ Shortened pile head treatment process ■ Cost reduction ■ Quality assurance ■ Reliable stress transfer *For more details, please refer to the PDF materials or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Floor renovation method "SS-5 Hour Method"

A groundbreaking kitchen floor renovation system that does not require a business shutdown.

The "SS-5 Hour Construction Method" is a revolutionary technique that allows for kitchen floor renovations without interrupting business operations. By using a special substrate treatment material, it is possible to carry out construction immediately on floors that are dirty with oil or wet surfaces. After the construction is completed, there is almost no odor, and it excels in chemical resistance and abrasion resistance, allowing for the realization of a safe and clean floor in about 5 hours, from the end of business on the same day to the preparation time the next morning. 【Features】 ■ Completed in 5 hours, allowing immediate use of the floor ■ Applicable to oily and wet surfaces ■ Slip-resistant processing is possible ■ Excellent chemical resistance, antibacterial properties, and abrasion resistance ■ Has 3 to 4 times the physical strength of concrete floors, among other benefits *For more details, please download the PDF or feel free to contact us.

  • Company:KBM
  • Price:Other
  • Other quality control and hygiene measures

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Steel Pipe Pile Top Plate Joint Method "ECS-TP Method"

Just bolt the foundation and pillars together! A simple and cost-effective foundation system.

The "ECS-TP method" is a steel pipe pile top plate joint construction method that is simple and very easy to implement, making it suitable for challenging sites. By re-evaluating the conventional foundation construction process itself, we have successfully shortened the construction period significantly while satisfying the structural criteria considered in the design standards, achieving both cost reduction and performance maintenance simultaneously. It has been adopted in pioneering projects that are typically considered difficult, such as "building a compost shed on a slope" and "adding a new roof from the outside of a station building." 【Features】 ■ Zero leftover soil and industrial waste ■ Fewer construction days ■ Usable in narrow spaces ■ Low vibration and low noise, minimizing environmental impact ■ Fewer vehicles required due to less material to be transported *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work ☆ Deep mixing method 'T-column method' * Certification obtained

This is a columnar improvement project of deep mixing treatment made possible by a self-developed stirring device (patent obtained) that enables high quality, low cost, and flexible responsiveness!

The T-column method is a construction technique that involves excavating the ground while injecting cement-based solidifying materials. Using a uniquely developed mixing device, it efficiently mixes and stirs the solidifying materials with the soil, creating stable, high-quality columns (columnar improved bodies). ■ Japan Building Center Foundation Construction Technology Review Certification (Building Technology)  BCJ-Review Certification-219 ■ NETIS Number KT-150083-A <Features> - Maximum column diameter of 1.60 m and maximum depth of 16 m. It is possible to construct up to the maximum column diameter using a base machine of 0.7 m³ class without the need for a three-point pile driver. It can accommodate various soil types, including clay, sandy soil, and loam, allowing for flexible responses to various road and surrounding conditions. - By using a fully automated plant, the slurry production process can be managed, ensuring stable quality. - In the case of small-scale buildings, a mold core can be created by taking depth mold samples. There is no need to collect boring cores, which reduces construction time and costs. *Documents can be downloaded from the related links.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Multi-Drill Method (Equivalent to BG Method)

We will perform cutting, removal, and backfilling suitable for the site! A case of removing PHC piles that could not be completely taken out.

Here is an introduction to a case study of underground obstacle removal conducted by our company. In Yokosuka City, Kanagawa Prefecture, we executed the work using the multi-drilling method (equivalent to BG method). We removed PHC piles that could not be extracted using the pull-out method. Upon receiving notice that extraction was impossible, we promptly began the work and successfully completed the project. 【Case Overview】 ■ Project Name: Multi-Drilling Method (Equivalent to BG Method) ■ Construction Date: May 12, 2022 ■ Location: Yokosuka City, Kanagawa Prefecture ■ Details: φ1000 GL-25m *For more details, please download the PDF from the related link or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Multi Drill SR-45 (Equivalent to BG) Low Headroom Size

Introduction to the case of underground obstacle removal conducted on April 1, 2022!

On our company website, we introduce numerous case studies of underground obstacle removal. On this page, we present the sizes for low-headroom construction using the multi-drill method (equivalent to BG method) in drawings. Our company selects tools according to the situation and carries out the construction. Please feel free to contact us if you have any requests. 【Methods for Underground Obstacle Removal】 ■ Multi-drill method (equivalent to BG method) ■ All-casing method (equivalent to BG method) *For more details, please download the PDF from the related link or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Removal of Subsurface Obstacles March Part 2

Introducing actual underground obstacles! We have a proven track record in various situational sites.

On our website, we introduce case studies of underground obstacle removal. This page features the second installment of our special on underground obstacles removed in March 2022. For more details, please check the related links. We have included images of actual underground obstacles, so please take a look. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles (7)

Introducing actual underground obstacles! We select tools according to the situation and carry out the construction.

On our company website, we introduce case studies of underground obstacle removal. This page features Part 7 of our series on removed underground obstacles. For more details, please refer to the related links. We have included images of actual underground obstacles, so please take a look. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Nihonbashi, Chuo-ku, Tokyo T-Column Method (Deep Mixing Method)

Introducing a case where the T-column method was implemented in a strict and narrow space to improve φ1000!

We would like to introduce a case study of the ground improvement work we conducted. In Nihonbashi, Chuo Ward, Tokyo, we performed the T-column method (deep mixing method) using construction machine S-15. We have introduced this case with images in the related links, so please take a look. 【Case Overview】 ■ Project Name: T-column Method (Deep Mixing Method) in Nihonbashi, Chuo Ward, Tokyo ■ Construction Date: June 5, 2021 ■ Location: Nihonbashi, Chuo Ward, Tokyo *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Ground Improvement using Deep Mixing Method (T-Column Method)

Construction example of ground column improvement work with a pile diameter of Φ160 at 3 locations, totaling 170 piles!

We would like to introduce a case study of the ground improvement work carried out by our company. In Machida City, Tokyo, the columnar improvement work for the newly constructed Tokiwa Ground within the Obirin Gakuen Machida Campus has begun, utilizing the original method "T-Column Method," which has obtained technical review certification and is a deep mixing treatment method. This project involves columnar improvement work for the ground, special L-shaped retaining walls, and L-shaped retaining walls. 【Case Overview】 ■ Project Name: Ground Improvement Using Deep Mixing Treatment Method (T-Column Method) ■ Construction Date: September 3, 2020 ■ Location: Tokiwa-cho, Machida City, Tokyo ■ Details: Pile diameter Φ160, total of 170 piles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] T Column Method, Odawara City, Kanagawa Prefecture

Introducing a case of ground improvement work conducted in Odawara City, Kanagawa Prefecture on September 30, 2021!

We would like to introduce a case study of the ground improvement work we conducted. In a factory located in Odawara City, Kanagawa Prefecture, we implemented our original deep mixing treatment method, the T-column method (Construction Technology Examination Certificate). We have provided images and details of this case in the related links, so please take a look. 【Case Overview】 ■ Project Name: T-Column Method in Odawara City, Kanagawa Prefecture ■ Construction Date: September 30, 2021 ■ Location: Odawara City, Kanagawa Prefecture *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Sagamihara City T-Column Method (Deep Mixing Method)

Introducing a case where the T-column method (deep mixing treatment method) was implemented using construction machine S-15!

We would like to introduce a case study of the ground improvement work we conducted. In Midori Ward, Sagamihara City, Kanagawa Prefecture, we implemented our original T-column method (deep mixing method) using construction machine S-15. A total of 176 locations were completed successfully. 【Case Overview】 ■ Project Name: Sagamihara City T-column Method (Deep Mixing Method) ■ Construction Date: October 5, 2021 ■ Location: Midori Ward, Sagamihara City, Kanagawa Prefecture ■ Details: Five types of pile diameters, with a small diameter of Φ800mm and a large diameter of Φ1300mm. *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] T-Column Method (Deep Mixing Method) in Machida City, Tokyo

Leave your foundation construction work to us! Excavation length of 9.0m, with 120 construction sites as examples.

We would like to introduce a case study of the ground improvement work we conducted. In Machida City, Tokyo, we implemented our original T-column method (deep mixing method). The excavation length was 9.0 meters, with 120 construction locations, and a silo for the solidifying agent was installed for the work. We have provided images of this case study in the related links, so please take a look. 【Case Overview】 ■ Project Name: T-column Method (Deep Mixing Method) in Machida City, Tokyo ■ Construction Date: October 9, 2021 ■ Location: Machida City, Tokyo *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Dismantling Adhesive Technology Utilization: SFRC Pavement Removal Method

Even with strongly bonded SFRC pavement, it is possible to remove the pavement quietly without damaging the steel deck.

We would like to introduce the "SFRC Pavement Removal Method" using disassembly adhesive technology. While maintaining its function as an adhesive, it is possible to easily peel off the SFRC pavement by heating the steel deck above a certain temperature. There is no need to scrape it off with heavy machinery, allowing for quiet construction. Additionally, no special qualifications are required, and the procedure is simple, making it accessible for anyone to implement. 【Features】 ■ No load on the structure ■ Can be detached without damaging the steel deck ■ SFRC pavement can be removed with low noise ■ Easy disassembly ■ No special qualifications required, and the procedure is simple *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Cassette type"

Compatible with various resin materials! Glass-filled grades can also be molded.

The "cassette type" is a manufacturing method that reduces initial costs and enables shorter delivery times when molds are needed for a large number of prototypes or small-lot mass production. It accommodates a wide range of product sizes with various size variations. Insert molding, two-color molding, secondary processing such as outserts, painting, and silk printing are also possible. We can also procure insert nuts and sheet metal. 【Features】 ■ Diverse small-lot production ■ Short delivery times ■ High precision and quality ■ Reduction of initial costs ■ Super Emperor compatibility *For more details, please refer to the PDF materials or feel free to contact us.

  • Processing Contract
  • Processing Jig

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration