We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Construction method.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Construction method Product List and Ranking from 475 Manufacturers, Suppliers and Companies | IPROS GMS

Last Updated: Aggregation Period:Jul 29, 2026~Aug 25, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Jul 29, 2026~Aug 25, 2026
This ranking is based on the number of page views on our site.

  1. 緑化計画研究所 Kanagawa//retail
  2. フルサト工業 建材開発部 Osaka//Building materials, supplies and fixtures
  3. 双和化学産業株式会社 Hyogo//others
  4. 4 メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡 Tokyo//Building materials, supplies and fixtures
  5. 5 null/null

Construction method Product ranking

Last Updated: Aggregation Period:Jul 29, 2026~Aug 25, 2026
This ranking is based on the number of page views on our site.

  1. Rooftop greening system - rooftop greening without the need for irrigation - evergreen Kiri grass bag method. 緑化計画研究所
  2. Rooftop greening, folded plate roof greening, wall greening, easy greening, evergreen Kiri grass bag method. 緑化計画研究所
  3. Corner steel pipe column on-site no-welding joint method 'Column Coupler' フルサト工業 建材開発部
  4. 4 Anti-corrosion resin lining system Shukura 双和化学産業株式会社
  5. 5 Exposed-type elastic fixed column base method "Free Base Method" フルサト工業 建材開発部

Construction method Product List

841~870 item / All 1398 items

Displayed results

Radiant Heating and Cooling System: Designing Indoor Spaces PSHR-C

PS's radiant heating and cooling system creates a soft indoor climate.

The PS radiant heating and cooling system circulates cold and hot water, creating a "natural" and gentle indoor climate. It feels as if you are in a forest. Warm radiation and cool radiation create the warmth of sunlight filtering through the trees and the coolness of shade.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pocket-type rockfall protection net method "Cross Plus"

Add energy absorption to conventional methods! The collision surface is reinforced to prevent rockfalls.

"Cross Plus" has an effect equivalent to that of "installing an energy absorption device at the impact point of a pocket-type rockfall protection net," and by installing it, the energy absorption function of the pocket-type rockfall protection net can be maximized. By installing this product diagonally on the impact surface to follow the deformation of the wire mesh, the impact surface is reinforced, preventing rockfall penetration. Additionally, further reinforcement is possible by adding horizontal reinforcement ropes. 【Features】 ■ Strong against impacts ■ Excellent cost-effectiveness ■ Easy to install ■ Maintenance *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Box culvert, flexible box culvert, construction methods for culverts.

We offer sizes ranging from 240mm to 10m, and we can propose earthquake resistance, functionality, and various construction methods according to your needs.

Our Calvert products are widely used in various projects such as urban sewers, agricultural drainage channels, underground passages, and culverts for road crossings, utilizing environmental creation technology that supports urban functions.

  • Other water supply and drainage facilities
  • Other Electrical Equipment
  • Piping
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Toris Method NETIS NO.SK-150004-A

Kingfisher and Crested Kingfisher Nesting Support System 【NETIS】SK-150004-A Registered

Please consider the "Toris Method," which provides a safe breeding ground for kingfishers and crested kingfishers on the newly constructed nearly vertical "precast concrete retaining walls."

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Exterior Wall Bio-Cleaning System Chemiclean Method

We will revitalize the exterior walls of your building with eco-friendly plant-based bio cleaning.

The dirty exterior walls of buildings and apartments can be beautifully restored to a condition close to that of when they were newly built using the plant-based bio detergent "Chemiclean." So far, we have a proven track record of removing dirt from 42-year-old tiles and 25-year-old aluminum panels, bringing them back to a state that is as close as possible to when they were new.

  • Cleaning agents
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Sandblasting method "Washing Out Blast"

I can draw all kinds of pictures! A washout finish that can be sanded at any time after curing.

Traditionally, the wash finish method involved using mortar mixed with fine stones called seed stones for the top coat, followed by washing the surface with water before it hardened to bring the seed stones to the surface. In contrast, the "sandblasting method" involves embedding stones before the concrete hardens, and then, after a period of 3 to 7 days, using sandblasting to remove the surface mortar. 【Features】 ○ Can be removed at any time after hardening ○ By cutting plywood and using it as a frame, it is possible to create designs of various shapes For more details, please contact us or download the catalog.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

APRON II

A method for widening sidewalks by extending them, allowing for sidewalk expansion of approximately 2.5 meters to be completed in a short period by installing it on existing roads.

■Stable Structure - The structure integrates vertical and horizontal directions by connecting products with anchor bolts installed post-construction in the foundation concrete poured on-site. - Using precast foundations allows for a completely dry construction method. ■Excellent Safety - Stability is achieved as the weight of the foundation concrete and the soil on the bottom plate resist tipping and sliding. - The sidewalk area can incorporate circular anti-slip patterns to prevent slipping. ■Improved Drainage - With a 2.0% slope in the sidewalk area and drainage holes in the side walls and joints, drainage is enhanced, making it difficult for water to accumulate behind the side walls.

  • others
  • 2D CAD Construction
  • 3D CAD
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Soil, rockfall, and snow prevention fence "Slope Guard Method"

It is possible to accommodate various construction conditions such as protective fences against collapsing soil, falling rocks, and avalanches, as well as existing rockfall protection reinforcement methods and fences that serve dual purposes for rockfall protection, avalanche prevention, and sediment accumulation measures.

<Lineup> ■ Landslide debris protection fence "Slope Guard Fence Type LE" ■ Avalanche protection fence "Slope Guard Fence Type LS" ■ Rockfall protection fence "Slope Guard Fence Type LR" ■ Rockfall protection fence "SPARC Fence" ■ Avalanche prevention measure "SPARC Fence Type S" ■ Reinforcement work for existing rockfall protection measures "Reinforced Fence" ■ Reinforcement work for existing rockfall protection measures "Reinforced Fence Type L" ■ Pocket-type rockfall protection net "Slope Guard Net Type R" ■ Collapse snow protection net "Slope Guard Net Type S"

  • others
  • 2D CAD Construction
  • 3D CAD
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

SBC Method - "Horizontal Pulling Method Using Steel Balls and Winches"

Even large products with heavy weight can be moved with a small force due to the bearing effect of the rails and steel balls.

■This is a method of embedding rails in the foundation concrete and using steel balls and winches to pull and move concrete secondary products smoothly. ■Installation can be carried out smoothly even in urban areas and under elevated roads and railways where direct crane installation is not possible, as well as in places where temporary roads cannot be set up. ■There is no need to move the crane for lowering the products. ■This method can be used for laying products that come with foundation concrete, such as box culverts, L-shaped retaining walls, and flumes.

  • others
  • 2D CAD Construction
  • 3D CAD
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

BRICS construction method

Measures to extend the life of aging social infrastructure!

■To prevent the deterioration of concrete structures! ■Reinforced existing bridges damaged by salt damage and other factors while in use. ■Renewed the bridge with minimal traffic restrictions!!

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Flying sand, dust, and erosion prevention agent Kuri Coat C-720 series

Please use it for sand prevention measures on bare land and maintaining aesthetics.

In landfill and reclamation areas, the scattering of bare fine sand not only detracts from the aesthetic appeal but can also lead to dust pollution and environmental issues.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Thin Panel Method (KB Panel Method)

Tunnel repair measures! We provide safety and security through new construction methods and contribute to society.

The "Thin Panel Construction Method (KB Panel Method)" involves cutting grooves (2mm wide and 20mm to 30mm deep) into the concrete structure, filling those grooves with adhesive, and then inserting and pressing the panels to secure them. It can also accommodate methods that use screws or anchor bolts for fixation. Panels are manufactured to fit the shape of the tunnel, making construction easy. Additionally, it has a short construction period, minimal protrusion, and is recyclable. 【Features】 ■ Easy to construct ■ Short construction period ■ Cost-effective ■ Minimal protrusion ■ Recyclable *For more details, please refer to the PDF materials or feel free to contact us.

  • Repair Agent
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Study of temporary wire fixing method using service crane.

Consideration of methods for reinstalling power lines after the replacement of the iron tower.

In the tower foundation replacement construction, to omit temporary work, a temporary suspension of the power line will be done using a crane, and after the tower replacement, the power line will be returned again.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Water Jet (WJ) Method - Handgun Chipping Method

Achieving high-quality repairs! Chipping method using a nozzle attachment that does not require electricity.

The "Water Jet Handgun Chipping Method" is a technique that allows for high adhesion effects, making it easy to integrate with repair materials and achieve high-quality repairs. It is possible to remove weak parts of concrete without damaging the healthy parts (remaining parts) of concrete structures or existing rebar. 【Features】 ■ Gentle on the structure ■ Not affected by weather ■ Vibration-free construction ■ Non-cracking, suppressing re-deterioration after repair ■ High repair effectiveness *For more details, please refer to the PDF materials or feel free to contact us.

  • Air Tools
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Permeable Resin Mortar Filling Method (PRMS Method)

This is a method of rubbing high-strength resin mortar into the voids of drainage pavement.

The permeable resin mortar filling method (PRMS method) is a technique that involves mixing a high-performance resin binder with special particle-sized fine aggregates to create a permeable resin mortar mixture, which is then filled into the gaps between the surface aggregates of permeable pavement. This method not only reinforces the surface of permeable pavement and aims to maintain and extend its functionality but also allows for repairs, thereby further enhancing the lifespan of this valuable infrastructure. Additionally, it is expected to achieve a high level of noise reduction.

  • Other laboratory equipment and containers
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Next-generation bed pre-construction method "DFP Method"

A new concept that enables the movement of flexible partition walls! Introducing the next-generation floor-first construction method.

The "DFP Method" is a next-generation floor-first construction method that employs a newly developed "detachable support base" for reinforcement adjusters. It allows for the installation of reinforcement adjusters under the floor without removing the pace panels, as well as the removal of panels from below. By using this method, there is no need to break the pre-floor when moving partition walls, making it easier to relocate walls and extending the period for plan changes during new construction, as well as reducing flooring costs and shortening construction time during renovations. 【Features】 ■ A new concept that enables flexible movement of partition walls ■ Adoption of reinforcement adjusters using the newly developed "detachable support base" ■ No need to break the pre-floor when moving partition walls ■ Reduction of flooring costs and shortening of construction time during renovations *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Also, basic anchor (high strength type) "AKH-190(PV)"

Installation of solar power generation systems in equipment and in heavy snowfall areas is now possible!

The "After Foundation Anchor" is a foundation anchor system for fixing equipment frames to concrete flat roofs using the "Direct Slab Method." The "AKH-190(PV)" is a high-strength product that boasts the maximum strength of the "After Foundation Anchor," with a compressive and tensile strength approximately 1.6 times that of conventional products and a shear strength that is twice as strong. It is lighter than concrete foundations and does not require specific installation locations. 【Features】 ○ Compatible with 60mm insulation materials ○ Made entirely of stainless steel (SUS304 series) ○ Waterproofing can be performed immediately after foundation construction (shortens construction period) ○ Lightweight compared to concrete foundations (flexible layout) ○ A PVC-coated type that adheres well to PVC sheet waterproofing is also available (AKH-190PV) For more details, please contact us or download the catalog.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Roller bearing roller

We will create it according to your needs!!

This is a product in which polyurethane elastomer is directly bonded to the outer circumference of the ball bearing. It does not compromise the rotational accuracy of the bearing and allows the characteristics of the polyurethane elastomer to be utilized effectively. Hardness and materials suitable for the application can be selected, enabling a wide range of applications.

  • roller
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【避難所】集合場所や避難所の3密に強制換気を   

3密状態での強制換気を促進!水を入れれば気化式冷風機になる大型送風機のご紹介

富山電気ビルデイング株式会社では、3密状態への強力送風で換気を促す 大型送風機を取り扱っております。 三相200Vの強力仕様からお手軽な100V仕様まで幅広くラインアップ。元は 水を使用する気化式冷風機ですが水を入れなければ強力な送風機になります。 3密にならないこと、また避難所などの生活にならないことが一番ですが どうしてもの環境において当社の製品がお役に立てるかもしれません。 ※詳しくはPDF資料をご覧いただくか、お気軽にお問い合わせ下さい。

  • Cooling system
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Anti-corrosion resin lining system Shukura

Standardizing stable quality through construction method design suitable for the purpose 'Shukura'

We have standardized stable quality with excellent performance in high water resistance, durability, and chemical resistance, primarily using FRP, through method design suitable for various applications. Additionally, to consider the construction environment, we have achieved "low odor" and "low solvent" formulations. We have obtained certification from the Japan Sewage Works Agency based on the "Concrete Corrosion Prevention Guidelines and Various Tests." For more details, please contact us or download the catalog.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Shuanghe Chemical Industry Bathing Space

Bathroom renovation method 'Yokuhari Space' proposed by FRP waterproofing manufacturers.

The waterproof pan of a collective housing bathroom that is over 20 years old poses a risk of leakage due to aging. To prevent troubles before they occur, we recommend repairing or replacing the old waterproof pan. You can choose the construction method based on the shape and condition of the bathroom. Additionally, for the renovation of traditional bathrooms (tiled bathrooms), "bathroom space" is the best option. We will renovate the floor, walls, and ceiling of the bathroom that cannot accommodate a unit bath to have a 'unit bath style.'

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Low-temperature welding and casting welding method "Arc Meister"

Give new life to cast metal products that were forced to be exchanged or discarded!

At Kanae Co., Ltd., we uniquely develop products such as fine tube brushes and tent houses. "We respond to various needs of our customers!" The thermal welding "Arc Meister" is a welding method that utilizes short beads and peening techniques. It is particularly excellent for repairing castings. Unlike temporary fixes like metal repair agents, it provides a permanent solution, allowing for repairs without the need to replace equipment. By performing low-temperature metal welding, it leads to reduced repair time and cost for metal repairs. 【Features】 ■ Reduced repair time and costs for metal repairs ■ Long-term repairs and extended equipment lifespan ■ Adoption of peening method ■ Short bead welding *For more details, please refer to the catalog. Feel free to contact us with any inquiries.

  • Welding Machine
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction Method: Multi-Mall Method

The multi-mole method is a mechanized technique for horizontal thrusting and vertical excavation work during the installation of sewer connection pipes and public manholes.

During the installation of sewer connection pipes and public manholes, it is necessary to dig horizontal and vertical holes. However, due to the complex site conditions, the current situation relies heavily on manual labor, making labor-saving at the site a pressing issue. The Multi-Mole method utilizes "TonTon-kun" and "BuruBuru-kun" to mechanize horizontal pushing and vertical excavation. In addition to standalone use, it also allows for the joining of horizontal and vertical operations. The Multi-Mole method significantly improves not only labor-saving but also safety and construction quality.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Inspection possible in a short period! Exterior wall inspection using drones.

Compared to traditional inspection methods, inspections can be completed in a shorter period!

Drone inspections were legally recognized on April 1, 2022, due to the revision of Article 12 of the Building Standards Act. In traditional hammering inspections, scaffolding was set up, and workers manually inspected the exterior walls using a hammering rod, resulting in longer inspection periods and increased work time. (Features) - Inspection time can be shortened as extensive inspections can be conducted from the air. - Inspections can be completed in a short period. *If you would like to know more details or specific examples, please feel free to contact us.

  • Contract measurement
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Koiwai 3D Sand Mold Layering Method

Directly mold sand casts from 3D CAD data!

Complex shapes can be molded in one piece, achieving high speed, high precision, and low cost! This next-generation casting technology eliminates the need for master molds, contributing to energy and resource conservation.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Artificial soil for rooftop greening "Scrum Soil S"

Very light and grows well! Soil for rooftop greening that can be used for various plants, including grass.

"Scrum Soil S" is an ultra-lightweight artificial soil with a specific gravity of 0.5 to 0.6, which is about half the weight of water and one-third that of regular soil. It is very light, allowing for rooftop greening while minimizing the load on buildings. The formulation is tailored to the growth of "lawns," which require high-quality soil, providing excellent water retention, nutrient retention, and aeration. It creates a healthy environment where grass can establish strong roots. 【Features】 - Weighs one-third of regular soil - Excellent nutrient and water retention - Good aeration, making it easy for roots to grow - Outstanding fertilizer absorption, enhancing growth *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Heat Stroke Prevention] Proposing a method to significantly reduce the intense heat reaching the second floor.

"The strong west sun is reducing work efficiency..." Even for work at heights, if heat-insulating sheets are installed from the inside, they can maintain continuous effectiveness without being affected by external rain or wind!

In indoor work during the summer, measures against heatstroke and heat insulation are necessary. This time, we received an inquiry from a manufacturer of high polymer functional products with a two-story building. They have air conditioning and ventilation systems but want to implement heat insulation measures while maintaining the role of the glass against heat coming through the windows. [Challenges before construction] - A high-altitude work vehicle is needed for construction on the upper part of the second-floor wall. - Equipment selection must be done in sizes that fit in the elevator, as it will be transported using the elevator. - In some construction locations, work will require more than three people, so rolling towers will also be used. [Process leading to implementation] - We proposed a product and construction method that allows for the installation of heat insulation sheets from the inside, which can be expected to have a semi-permanent effect without being affected by external rain or wind. - For the window surfaces, we selected "Eco Glass Coat," which significantly cuts heat rays while allowing bright light to enter (approximately 70% cut of near-infrared rays and about 90% cut of ultraviolet rays) to achieve heat insulation effects. *For more details, please download the materials or contact us directly.

  • air conditioning
  • Other air conditioning equipment
  • Other safety and hygiene products
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Seismic reinforcement method "Steel Pipe Cotter RM Seismic Wall Method"

A wall that can be constructed using the indirect joint steel pipe cotter method, featuring space-saving, low vibration, and low noise characteristics.

The "Steel Pipe Cotter RM Seismic Wall Method" is an environmentally friendly seismic reinforcement method that allows for a significant reduction in formwork construction while maintaining strength equivalent to conventional RC seismic walls. The wall is composed of RM blocks, reinforcing bars, and high-toughness mortar, utilizing the steel pipe cotter method at the indirect joint sections. Seismic reinforcement work can be carried out while the building is in use, such as in schools, hospitals, nursing homes, tenant buildings, and the piloti sections of residential buildings. 【Features】 ■ Uses the steel pipe cotter method at indirect joint sections ■ Space-saving, low vibration, low noise ■ Allows for a significant reduction in formwork construction while maintaining strength equivalent to RC seismic walls ■ Seismic reinforcement work can be carried out while the building is in use *For more details, please refer to the PDF materials or feel free to contact us.

  • Anti-vibration, earthquake-proof, vibration-isolating devices
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Tunnel auxiliary construction method "AGF-Φ method"

By using a dedicated guide tube, reliability and safety are improved! Furthermore, it achieves a low impact on the environment.

The "AGF-Φ Method" is an expanded type of AGF that adopts the "AGF-Φ Dedicated Guide Support" with a dedicated guide pipe installed to facilitate the placement of AGF steel pipes for pre-loosening suppression by drilling holes in the web section of H-shaped steel supports. By using the dedicated guide pipe, the placement of the steel pipes becomes more accurate, improving construction precision. As construction precision improves, it becomes possible to reliably form an arch crown at the tip of the steel pipe, and since the steel pipes are left in the ground without cutting, there is no industrial waste generated. 【Features】 ■ Improved construction precision ■ Loosening suppression effect ■ Reduction of industrial waste ■ Reduced cycle time *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration