We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Construction method.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Construction method Product List and Ranking from 476 Manufacturers, Suppliers and Companies | IPROS GMS

Last Updated: Aggregation Period:Jul 29, 2026~Aug 25, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Jul 29, 2026~Aug 25, 2026
This ranking is based on the number of page views on our site.

  1. 緑化計画研究所 Kanagawa//retail
  2. フルサト工業 建材開発部 Osaka//Building materials, supplies and fixtures
  3. 双和化学産業株式会社 Hyogo//others
  4. 4 メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡 Tokyo//Building materials, supplies and fixtures
  5. 5 null/null

Construction method Product ranking

Last Updated: Aggregation Period:Jul 29, 2026~Aug 25, 2026
This ranking is based on the number of page views on our site.

  1. Rooftop greening system - rooftop greening without the need for irrigation - evergreen Kiri grass bag method. 緑化計画研究所
  2. Rooftop greening, folded plate roof greening, wall greening, easy greening, evergreen Kiri grass bag method. 緑化計画研究所
  3. Corner steel pipe column on-site no-welding joint method 'Column Coupler' フルサト工業 建材開発部
  4. 4 Anti-corrosion resin lining system Shukura 双和化学産業株式会社
  5. 5 Exposed-type elastic fixed column base method "Free Base Method" フルサト工業 建材開発部

Construction method Product List

871~900 item / All 1401 items

Displayed results

Improved Filling Method for Overlaid Concrete: "Confill Tape Method"

No need for equipment, easy to apply! Enhances the fillability and quality of the lining concrete.

We would like to introduce our method for improving the filling properties of lining concrete, the "Confill Tape Method." Through the non-woven fabric tape, residual air and bleeding water are quickly discharged. The materials are lightweight and flexible, allowing for easy application without the need for equipment. Additionally, during the concrete pouring process, the non-woven fabric integrates with the concrete, eliminating the need for grouting or removal work. 【Features】 ■ Enhances the filling properties and quality of lining concrete ■ Rapid discharge of air and water ■ Integration with concrete ■ Easy installation ■ No need for removal as an obstruction *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Rationalization Construction Method "SK Bar Mesh Unit (SBU)"

Standard construction methods for tunnels with over 500 completed projects! We have received high praise from many clients and contractors.

The "SK Bar Mesh Unit (SBU)" is a revolutionary construction method that utilizes specialized welding and bending techniques to solve quality and operational issues in the workplace. With the acquisition of ISO 9001, we supply products with stable quality. We are enhancing quality, cost, machinery, and technology to accommodate all rebar requirements for tunnel construction. We propose material layouts and construction procedures that suit the diverse construction methods at tunnel sites. 【Features】 ■ No need for specialized workers, allowing for adaptability to changes in processes ■ Streamlining of operations ■ Elimination of the need for assembly work of reinforcing bars through unitization ■ Mechanization from manual work to heavy machinery operations ■ Stable supply of high-precision products through the manufacturing of automatic welded wire mesh machines *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Tunnel excavation auxiliary method "Slit Injection Forepoling"

Reduce surface spalling caused by construction from within the cross-section! Achieve reliable injection through leak suppression.

The "Slit Injection Forepolling" is a tunnel excavation auxiliary method that allows for the insertion of cuttable bolts at a low angle from beneath the support structure into areas of concern for rockfall, such as unconsolidated ground. By performing construction from within the cross-section, it reduces the skin fall that occurs from the top and achieves reliable injection through leak suppression. It excels in ground improvement effects. 【Features】 ■ By processing slits in the bolts, it allows for the removal of the bolt ends. ■ It enables insertion from beneath the support structure, proving particularly effective in unconsolidated ground such as sandy hills, demonstrating higher effectiveness than conventional methods. ■ Since it is cast from beneath the support structure, it suppresses leaks caused by rough holes due to casting from the sprayed concrete application position, allowing for reliable injection. *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Tunnel excavation auxiliary method "Injection Forepoling"

Introducing tunnel excavation support methods for preventing the collapse of the cutting edge and the expansion of looseness!

"Injection-type Forepolling" is an auxiliary excavation method that combines injection materials and bolt materials to perform pre-support and consolidation improvement of the ground. Its primary purpose is to prevent the collapse of the tunnel face and to stop the expansion of looseness during tunnel excavation. Please contact us if you require our services. 【Construction Method (Partial)】 < Hallow/FRP Bolt > ■1. Drilling ■2. Bolt insertion ■3. Mouth closure ■4. Injection *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Data] Free Base Construction Method Design Handbook

Design Handbook for Exposed Type Elastic Fixed Column Footing Method! Includes application range and materials, shapes, and dimensions of main materials.

This document is the design handbook for the exposed elastic fixed base method "Free Base Method." The "Free Base Method" is an exposed elastic fixed base construction method that ensures structural safety of the base specifications based on SASST technology evaluation. It includes the scope of application, material properties, shapes, dimensions of key materials, as well as the design of buildings using this method. [Contents] ■ Scope of application ■ Material properties of key materials ■ Shapes and dimensions of key materials ■ Design of buildings using this method *For more details, please refer to the PDF document or feel free to contact us.

  • bolt
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Exposed-type elastic fixed column base method "Free Base Method"

Streamlining complex design work. Achieving stabilization of material and construction quality. Obtained SASST technology evaluation.

The "Free Base Method" is a column base construction method designed for medium to small-scale projects that enhances workability and construction quality during the design phase while ensuring strength equivalent to conventional methods. By selecting major components from specified specifications, the selection process can be simplified. The choice of model numbers integrated into a consistent structural calculation program also makes it easy to examine allowable stress. By using components provided by our company and having designated contractors carry out the construction, stable construction quality is achieved. Additionally, structural safety has been verified through full-scale experiments, and SASST technology evaluation has been obtained. 【Features】 ■ 8 to 18 types of column base specifications available for each column size ■ Anchor bolt diameter can be selected according to required specifications ■ Bolt embedment length is set at 15d, resulting in a compact foundation column type ★ We are currently offering a "Design Handbook" that explains the design procedures and specifications of major components. You can view it immediately from "PDF Download."

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

HDD Method (Guided Horizontal Drilling) - Solving Problems of Crossing National Highways, Railways, and Waterways

Piping and wiring burial system! Numerous achievements! Solutions for "crossing national roads, railways, waterways, and rivers"! "Challenging the creation of lifelines that traverse the Earth and underground."

With the acceleration and advancement of urban functions, the development of various lifelines such as water supply and sewage, electricity, gas, and communications is becoming increasingly important. The HDD method (Horizontal Directional Drilling) / TerraJet is a construction method that buries pipes and cables using non-excavation techniques, reducing traffic disruptions and soil disposal issues. It allows for clean and safe construction by detecting the construction position from above ground while advancing the drilling. In recent years, disasters have become more severe, and from the perspective of improving disaster resilience, the replacement of aging pipes and the transition to earthquake-resistant pipes are being promoted. The HDD method / TerraJet is gaining attention as a technique for burying water supply and sewage pipes, gas pipes, electric cables, and communication lines underground. In Europe and the United States, this method is known as NO-DIG, Trenchless, HDD (Horizontal Directional Drilling), no-dig, trenchless, and horizontal directional drilling. 【Features】 - Flexibility and adaptability - Shortened construction period - Economically low cost - Harmony with the natural environment - Safety For more details, please contact us or download the catalog.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Metal Roof Waterproofing, Anti-Corrosion, and Heat Insulation Method "Hydra"

Hydra, equipped with features such as waterproofing, rust prevention, and heat insulation.

Hydra is a specialized construction method for metal roofs such as corrugated and tile roofs, combining the flexible and strong acrylic rubber-based waterproof material Hydraflex, the rust-proof primer Metal Lock, and the heat-insulating topcoat Heat Barrier Top. 【Features】 ○ Achieves excellent waterproof performance ○ The waterproof layer also contributes to reducing rain noise For more details, please contact us or download the catalog.

  • paint
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ventilated Cushioning Method "PARATEX AP"

A ventilation cushioning method that can accommodate various substrates such as concrete and mortar!

"PARATEX AP" is a ventilation cushioning method that minimizes environmental impact. All waterproofing materials are composed of water-based substances. They contain no air solvents, have low odor, and do not generate noise. Additionally, by using modified asphalt ventilation cushioning sheets as a base material and combining them with Paratex waterproofing, it can accommodate various substrates. [Features] ■ Ventilation cushioning effect ■ Odorless and noiseless ■ Compatible with various existing substrates *For more details, please download the PDF or feel free to contact us.

  • Cushioning material
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

MOK River Method

Maintenance of wooden components in a circular economy.

Beautiful, strong, and environmentally friendly: the ultimate method for wood maintenance. In recent years, due to the rising awareness of environmental issues, buildings utilizing wood, a renewable resource, have gained attention. However, there are also unique challenges associated with wood. "It is difficult to restore to a bright color once it deteriorates." "Covering it up diminishes the wood's texture." "The burden of frequent maintenance is significant." The MOK Riva method addresses these challenges and aims for a society that utilizes wood—a sustainable society. Method patent number: No. 4852170 Ministry of Land, Infrastructure, Transport and Tourism NETIS certification record: New Technology KK 150001 A

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Repair achievements MS method Hinode Mechanical method

We will repair metal cracks without applying any heat at all. Since no heat is applied, thermal distortion does not occur.

【Product PR】 The "MS Method (Mechanical Stitch)" is a revolutionary repair technique (Mechanical Stitch Method) that uses mechanical methods to address cracks in metal. Since it does not apply any heat, there is no "thermal distortion." It prevents residual stress in other areas and avoids secondary damage such as new cracks. 【Features】 ■ No hardening or residual stress from heat ■ Elimination of secondary damage ■ Maintenance of stable quality → Integrated system repairs using jigs, etc. → Accumulation of know-how, experience, and track record ■ Completion of construction in a short period → Does not significantly reduce the operating rate of equipment ■ Advantages in safety and environmental aspects → No use of fire, thus no impact on the operating rate of other equipment or the environment For more details, please contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Installation Pipe Inspection Camera 'P4060E'

Equipped with a side view and instant switch button! A monitor DVR storage case is also included.

We would like to introduce the 'P4060E', a pipe inspection camera that we handle. The hard cable is a coaxial cable with a diameter of Φ7 and a length of 60m, and the controller/monitor is an integrated DVR monitor. Additionally, the monitor measures 8" (175×98mm) with a resolution of 280×720 pixels. The battery capacity is 7000mAh. 【Dimensions/Weight】 ■ 50×W60×H64cm ■ 15kg *For more details, please download the PDF or feel free to contact us.

  • Color camera
  • Surveillance Cameras
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Borehole geological survey camera

The battery capacity is 8800mAh, and the dimensions are 60×40×74! The hard cable is Φ8×200m.

We would like to introduce the "Borehole Geological Survey Camera" that we handle. The hard cable is Φ8×200m, and the guide sol is suitable for borehole diameters. The controller/monitor comes in a waterproof box-type case. Additionally, the battery has a capacity of 8800mAh and weighs 55kg. Please feel free to contact us if you have any inquiries. 【Dimensions/Weight】 ■60×40×74 ■55kg *For more details, please download the PDF or feel free to contact us.

  • Color camera
  • Surveillance Cameras
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Case Study] Power Lighting Vehicle

Water pressure elevation and installation of lighting fixtures on square poles! Mounted on a dedicated power vehicle, it is actively used for firefighting and disaster prevention.

We would like to introduce a case study of our "Power Lighting Vehicle" being implemented for firefighting and disaster prevention. The background leading to this implementation is that, especially at night during fires or disaster sites, bright lighting must illuminate a wide area from a height. Additionally, since bright lighting tends to be large, the poles that extend high need to have strong rigidity to resist twisting. Our "Aqua Pole" can be extended high at the site it is moved to, and we have equipped it with large, bright lighting fixtures. The "Power Lighting Vehicle" is actively used at various fire and disaster sites, and we also offer a product that incorporates the "Aqua Pole" with lighting fixtures on a wheeled cart. [Challenges] - At night during fires or disaster sites, bright lighting must illuminate a wide area from a height. - The lighting pole needs to be low when moving and extend high at the site. - Since bright lighting is large, the pole that extends high requires strong rigidity to resist twisting. *For more details, please refer to the PDF document or feel free to contact us.

  • Other lighting equipment
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Waterproofing construction methods

Close-contact construction method and insulation construction method! Introducing the advantages and disadvantages of each method.

We will introduce the differences between the "Adhesive Method" and the "Insulation Method" in waterproofing construction. The "Adhesive Method" is a technique that completely adheres the waterproof layer to the substrate, offering advantages such as relatively short construction time and high cost performance. The "Insulation Method" is a technique that does not adhere the waterproof layer to the substrate (it is elevated), allowing the waterproof layer to be unaffected by the substrate, resulting in long-lasting durability. Our company proposes methods that suit your building and structure, ensuring long-lasting reliability. Please feel free to consult us. 【Adhesive Method】 ■ Advantages - High cost performance - Relatively short construction time - Walkable and capable of heavy foot traffic (depending on the method) ■ Disadvantages - Since the waterproof layer is adhered to the substrate, it is affected by moisture contained in the substrate - There may be occurrences of cracks or blisters in the waterproof layer *For more details, please refer to the related link page or feel free to contact us.

  • Other contract services
  • Other services
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Water Clean Stripping Method with Combined Use of Stripper Hand Tools

I want to remove asbestos-containing finishing materials! For sites where I want to proceed to the next step while preserving the base adjustment material! It is possible to completely remove even the slightest residue of the coating material.

The "Water Clean Stripping Method" is a technique that allows for unevenness adjustment while preserving the underlying leveling material after removing asbestos-containing finishing materials. It can completely remove even the slightest residue of the coating material and is capable of removing any type of finishing material, regardless of whether it is organic or inorganic. The applicable conditions are that the finishing material must contain asbestos, while the underlying leveling material must be free of it. This method can be applied in sites where the next process (such as repainting) is desired while preserving the underlying leveling material, or in sites where no leveling material has been applied. 【Features】 ■ Allows for unevenness adjustment while preserving the underlying leveling material ■ Can completely remove even the slightest residue of the coating material ■ Capable of removing any type of finishing material, regardless of whether it is organic or inorganic ■ No additional work like multiple applications of the stripping agent method is necessary *For more details, please refer to the related link page or feel free to contact us.

  • Other contract services
  • Other services
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Water Crusher Method

It is a construction method that takes the environment into consideration by neutralizing and discharging the wastewater used.

The "Water Crusher Method" is a concrete chipping and deterioration removal work that uses a water jet (ultra-high pressure water). The advantage of this method is that it minimizes vibration impact, thereby significantly reducing the occurrence of micro-cracks in the concrete during construction. Additionally, it allows for construction without increased adhesion due to uneven surfaces or the generation of dust, improving the working environment. This method is suitable for chipping work on various parts. 【Features】 ■ Construction using ultra-high pressure water minimizes dust generation, considering the environment. ■ It enables construction that minimizes the occurrence of micro-cracks (cracking). ■ The work itself is mechanized, allowing for safe and precise construction. ■ It can chip away concrete without damaging the rebar within, allowing for the removal of concrete only. ■ It is capable of chipping on floors, walls, and ceilings, with a range of 10mm to 1000mm. *For more details, please refer to the related link page or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Water Clean M Method (Water Washing Method with Dust Collection Device)

Using water at a pressure of approximately 10 to 15 MPa for suction cleaning! A suitable washing method for painting renovation work.

The "Water Clean M Method" is a construction method that washes the surface of paint films without removing asbestos-containing coatings. It uses water at approximately 10 to 15 MPa for suction cleaning, which minimizes dispersion and provides peace of mind in the unlikely event of paint material peeling. It is well-suited for surface cleaning in painting renovation work and asbestos containment projects. 【Features】 ■ Washes the surface of paint films without removing asbestos-containing coatings ■ Uses water at approximately 10 to 15 MPa for suction cleaning ■ Minimizes dispersion and provides peace of mind in the unlikely event of paint material peeling ■ Ideal for water washing in painting renovation work *For more details, please refer to the related link page or feel free to contact us.

  • Exhibition planning/construction
  • Other contract services
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Peeling Prevention Construction: Regitect RT Method

High construction capability and cost reduction are possible! Easy to install, significantly shortening the construction period compared to conventional methods!

In concrete structures, the penetration of water from rainwater and groundwater, as well as salt from de-icing agents, airborne salt, and seawater, can induce corrosion and rusting of rebar, leading to spalling defects and a decrease in the strength of the structure. In response to incidents such as falling concrete blocks in tunnels and spalling accidents from elevated bridges, clients are creating their own standards to prevent concrete spalling and are collectively working on countermeasures. To address these issues, we recommend the "Regitect RT Method," a spalling prevention specification for concrete that satisfies performance criteria without using fibers as tensile reinforcement. [Features] ■ Instant hardening material ■ Excellent workability ■ High durability ■ Reduced LLC *For more details, please refer to the related link page or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Panel-type rectangular cage 'P-III'"

Panel-type square cage construction method 'P-III' that harmonizes with the environment and is suitable for the growth of living organisms.

The panel-type rectangular basket "P-III" harmonizes with the environment and is suitable for the growth of living organisms. Its flexible structure makes it easy to adapt to changes in the ground. It can be used for construction in rivers, roads, and erosion control works. For more details, please contact us or download the catalog.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "cylindrical basket"

A construction method that is rich in versatility and easy to install: "cylindrical cage."

The cylindrical wire mesh, commonly referred to simply as a wire mesh, is a cylindrical structure that is simple in design and possesses all the characteristics of iron wire. It has been used for a long time as a traditional construction method. It can be applied in river, road, and erosion control works, among others. For more details, please contact us or download the catalog.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Large Futon Basket"

"Large mattress basket" construction method that flexibly adapts to changes in the ground for landslide prevention at sediment control dams.

The large futon basket inherits the characteristics of the jakago construction method, and by making the frame sturdier and larger, it enables the construction of high-strength, highly adaptable, and versatile structures. It can be used for sediment control dams, hillside retaining works, landslide prevention works, and retaining wall works. For more details, please contact us or download the catalog.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Cage mat multi-layer stacking type"

Cage mat method used for steep slopes in river, erosion control, and landslide prevention works.

The multi-layered type is a cage mat method used on steep slopes. It can be applied in river, road, and erosion control projects. For more details, please contact us or download the catalog.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Dry-type face sheet "HYROLL"

Multilayering elastomers and aluminum! High roll achieves a significant reduction in roof weight.

The dry-type roofing sheet "HYROLL" is a new product and method that does not use any nails. It not only significantly reduces the weight of the roof ridge but also decreases the workload for installers and greatly reduces after-maintenance. It has received high praise as a specified material from the largest domestic housing manufacturers and roofing material manufacturers. 【Features】 ○ Multi-layered sheets exhibit synergistic effects ○ Strong adhesion to roofing materials ○ Fast installation due to special shapes ○ Patent No. 4384725 For more details, please contact us or download the catalog.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Metal crack repair LOCK-N-STITCH and screw hole repair Full Torque

The LNS method eliminates thermal distortion and secondary cutting, making machining unnecessary, which allows for reduced construction time and cost savings.

■□■A Completely New Metal Crack Repair That Is Not Welding■□■       ~Permanent Complete Repair~ The LOCK-N-STITCH 'LNS' method, which is not welding, uses special screws and reinforcement locks, employing mechanical stitch metal joining technology that prevents thermal distortion and secondary cuts, eliminates the need for machining, and allows for easy on-site construction, enabling a completely new crack repair that shortens construction time and reduces costs. Additionally, the permanent screw hole repair 'Full-Torque' is not a temporary fix like conventional products, but allows for a permanent repair, extending the life of the equipment. The permanent female thread repair insert 'Full-Torque Thread Insert' perfectly resolves worn or damaged bolt holes with a single application.

  • Other machine elements
  • Other processing machines
  • Gearbox
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Metal Crack Repair Technology LOCK-N-STITCH Construction Results

This is an introduction to the construction results of the LOCK-N-STITCH (LNS method), which repairs cracks that occur in metal using special bolts and reinforcement locks.

■□■ A completely new method for repairing metal cracks that does not involve welding ■□■ 【Example of Achievements】 ○ Upper part of the crown side cover (forged press) → The forged press machine had oil leaks at the expanding areas, and crack repair (900mm) was completed in two days. ○ Additional hole processing at the crankshaft journal end → Completed in two days at eight locations. ○ Gear → A second break occurred from the welded area, reinforced with LNS reinforcement material (repair period: two days during the day). ○ Marine M/E cylinder block → The aging ME engine of the ship, made of a material difficult to weld, was repaired using the LNS method (repair period: 2.5 days). We have many other achievements as well. For more details, please contact us.

  • Other machine elements
  • Calibration and repair
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Metal Crack Repair [LNS Method] Chemical and Steelmaking Equipment Case Studies

■□■A completely new metal crack repair that is not welding■□■ Please contact LNSJAPAN.

The LNS method is a technology that uses specially designed screws and reinforcement materials (LOCK) to physically remove cracks with a metal touch. It has achieved numerous results and has a wealth of case studies. Completely solve the problems of equipment crack repair. For more details, please download the catalog or contact us.

  • Calibration and repair
  • Other processing machines
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Sky Resin Fine Epoxy System"

Excellent chemical resistance and water resistance! Safe work is possible with solvent-free epoxy resin paint.

"Sky Resin Fine Epoxy System" is a concrete anti-corrosion method for wastewater treatment facilities that possesses excellent chemical resistance and water resistance, suppressing the corrosion of concrete in sewer facilities. It complies with the Corrosion Suppression Technology and Anti-Corrosion Technology Manual for Sewer Concrete Structures (December 2017 edition). Being a solvent-free epoxy resin, it allows for safe work. 【Features】 ■ Excellent adhesion to concrete ■ Safe to work with ■ Almost no volume shrinkage after curing *For more details, please download the PDF or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Big Sun SR Method"

Slate waterproofing method that suppresses the rise in indoor temperature due to heat insulation effects!

The "Big Sun SR Method" is a slate waterproofing technique that helps reduce indoor temperature increases due to the effects of heat-reflective paint, contributing to energy savings for air conditioning during the summer. By providing waterproofing and heat-reflective functions, it suppresses the deterioration and neutralization of slate, extending its lifespan. Additionally, it generates less waste compared to re-roofing or covering, allowing for cost reductions. 【Features】 ■ Suppresses indoor temperature information ■ Suppresses slate deterioration ■ Cost reduction compared to re-roofing and covering *For more details, please download the PDF or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Concrete Structure Corrosion Protection Method "Sky Resin Aqua Epoxy System"

Corrosion protection method for concrete structures composed of water-dispersible materials throughout the entire project!

The "Sky Resin Aqua Epoxy System" is a corrosion protection method for concrete in water supply facilities. It complies with the quality standards for epoxy resin coatings for concrete water tanks as specified in JWWA K143 (2017). It is primarily used for the internal corrosion protection of concrete water tanks in water supply systems, such as water purification facilities, distribution reservoirs, and water storage tanks. 【Features】 ■ Complies with the ministerial ordinance (Ministry of Health Ordinance No. 15) that establishes technical standards for water supply facilities. ■ All materials possess water-dispersible properties, excellent wet adhesion, and enable safe construction. ■ Uses hydrophilic polyamine that does not contain surfactants, improving water resistance and chemical resistance compared to conventional forced-emulsion epoxy. ■ The substrate conditioning material (Sky Resin EPC-T) complies with the quality standards for epoxy-based polymer cement substrate conditioning materials in JWWA K143:2017, Appendix A. ■ The coating film properties are excellent, providing long-term corrosion protection for concrete. *For more details, please download the PDF or feel free to contact us.

  • paint
  • Coating Agent
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration