【Pin Foundation Construction Example】A place where water does not drain.
Simple foundation construction method for NETIS registration! Here are examples of construction in areas where water cannot be drained.
Places where water cannot be drained We will introduce examples of the pin foundation construction method. In conventional methods, foundation work could not be done without draining water from wetlands or lakes, but with the pin foundation method, underwater construction can be carried out by divers in the existing state. 【Case Study】 ■ Chigoike Park (Miyazaki Prefecture) ■ Structure: Effective width 2.5m, pillar pitch 2.0m ■ Materials Used - Railing: Aluminum, cedar - Floorboards: Cedar - Structural materials: Aluminum alloy, greenheart wood ■ Foundation Type: DP-100 *For more details, please refer to the catalog or feel free to contact us.
- Company:コムテック 熊本事業部
- Price:Other