We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Construction.
ipros is IPROS GMS ・ IPROS One of the largest technical database sites in Japan that collects information on.

Construction Product List and Ranking from 173 Manufacturers, Suppliers and Companies | IPROS GMS

Last Updated: Aggregation Period:Sep 30, 2026~Oct 27, 2026
This ranking is based on the number of page views on our site.

Construction Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 30, 2026~Oct 27, 2026
This ranking is based on the number of page views on our site.

  1. 加賀耐火煉瓦 Aichi//Service Industry
  2. ライフテック 工場・倉庫の暑さ対策には「サーモバリア」 Gifu//Building materials, supplies and fixtures
  3. イデア株式会社 Hyogo//Ferrous/Non-ferrous metals
  4. 中部 Aichi//Trading company/Wholesale
  5. 5 VALQUA TORQUE SYSTEM CO., LTD. Aichi//Industrial Machinery

Construction Product ranking

Last Updated: Aggregation Period:Sep 30, 2026~Oct 27, 2026
This ranking is based on the number of page views on our site.

  1. Selection, sales, and construction of amorphous refractories. 加賀耐火煉瓦
  2. Thermal barrier installation on the roof of livestock facilities. ライフテック 工場・倉庫の暑さ対策には「サーモバリア」
  3. Photocatalytic "Nanozone Coat" application service 中部
  4. 4 On-site construction & nationwide support | Opening processing for plants (cutting processing, counterboring processing) VALQUA TORQUE SYSTEM CO., LTD.
  5. 4 One-touch installation by simply inserting the pipe! Air piping "Air Liner" NITTO KOHKI CO., LTD.

Construction Product List

61~90 item / All 288 items

Displayed results

ICT-enabled construction "Smart Construction Retrofit"

Promoting the digitalization of the site with 3D machine guidance. By equipping hydraulic excavators at a low cost, ICT construction becomes possible.

By simply attaching it to your hydraulic excavator, you can add features such as 3D machine guidance, making it possible to use it as an ICT construction machine in i-Construction designated projects promoted by the Ministry of Land, Infrastructure, Transport and Tourism. Furthermore, by streamlining construction, it allows for reduced construction periods and cost savings on labor expenses. 【Features】 ■ Equipped with "2D machine guidance mode," enabling the creation of simple design surfaces. ■ Sends bucket edge information from the construction machine and data of the construction site to a tablet device. → Eliminates the need for string lines, significantly improving work efficiency. ■ Can be installed regardless of the manufacturer or size of the construction machine. 【Benefits】 ■ Can be used as a fixed station. ■ Visualizes construction history with a 3D viewer, making it easy to grasp and manage construction progress.

  • Process Control System
  • Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[2×4 Housing Construction Achievements] After-school facilities in Shiga Prefecture

The cedar stud is flying with a truss span of about 8 meters, and the second floor has a spacious area!

We would like to introduce our construction achievements of 2×4 houses at after-school facilities in Shiga Prefecture. The total floor area is 140.78m². It features cedar studs and a truss with a span of approximately 8m, creating a spacious second floor. Please feel free to contact us when you need our services. 【Case Overview】 ■Construction Period: September 2021 ■Total Floor Area: 140.78m² *For more details, please refer to the related links or feel free to contact us.

  • Other contract services
  • Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

The dwelling of the healer.

Unique technology that suppresses oxidation! Please achieve a healthy and comfortable life in a living environment that is less prone to "rust."

"Iyashiro no Sumai" improves residential environments with excessive active oxygen through a unique combination of technologies that suppress oxidation. Just as iron rusts, the human body also "rusts," leading to the promotion of diseases and aging. One of the "Four Principles of Healthy Housing," the "Antioxidant Measures," mitigates the effects of active oxygen, creating an environment that is less prone to "rusting." 【Four Principles of Healthy Housing】 ■ Enhance thermal properties ■ Focus on natural materials ■ Implement antioxidant measures ■ Design for health and comfort *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Hangtou reinforcement bar construction 【*Integrated manufacturing and construction system】

Reduce troublesome adjustments at construction sites! Restructure processes with anchor sets according to the situation to shorten construction time. Manage complex pile head reinforcement work as a whole.

If you are concerned about the interference between anchor bolts and reinforcement bars, leave it to Otsu Iron Works. By carrying out the anchor set construction together, not only can we coordinate everything from the pile head reinforcement work to the anchor installation work at once, but we can also handle adjustments between construction workers, eliminating troublesome adjustments at the construction site. Additionally, we can rearrange the processes of pile head reinforcement and anchor set construction according to the situation, which can lead to a reduction in construction time. We can also manage complex pile head reinforcement work, including pile studs, pile head gold welding, New J-BAR, NCP anchors, and FT caps, all at once. [Reasons to choose Otsu Iron Works for construction] 1. Simultaneous construction with anchor sets allows for complex inter-vendor adjustments. 2. Reduction in construction time. 3. Comprehensive management of complex pile head reinforcement work. *Please feel free to contact us for more details.

  • others
  • Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction and civil engineering related hardware installation [*Integrated manufacturing and installation system*]

We carry out construction work such as on-site arc welding, gas cutting, and miscellaneous metalworking, as well as the fabrication and installation of steel frames and metal products.

At Otsu Ironworks, we carry out construction work including arc welding and gas cutting on-site, as well as the fabrication and installation of steel frames and metal components. Additionally, we interpret the provided design drawings and create construction drawings to ensure that the installation work can proceed smoothly, taking into account the preceding and subsequent processes on-site. With our experienced and proven personnel who have worked on numerous projects, we can cater to the diverse needs of our clients. 【Construction Menu】 ■ Seismic, vibration isolation, and damping construction ■ Concrete embedded metalwork ■ Parking lot ancillary work ■ Pile anchor bolt method ■ Column steel plate wrapping ■ Steel frame construction for system buildings 【Reasons to choose Otsu Ironworks for your construction needs】 1. We interpret design drawings and create construction drawings for proposals. 2. Our personnel have extensive experience and proven track records. 3. We are capable of high-precision construction. *Please feel free to contact us for more details.

  • others
  • Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Solar panel mounting and pile installation [*Integrated manufacturing and construction system*]

Based on our extensive experience and track record in handling the installation of solar mounting systems on various conditions (such as walls and slopes), we offer proposals tailored to your needs!

Installation of solar panel mounting structures by Otsu Iron Works! We can coordinate everything from panel layout and design to construction, so you can trust us with your project. Depending on the situation, we will propose a combination of our own and other companies' products. 【Examples of Construction Achievements】 ■ Ground-mounted structures (concrete foundation) - Truss structures… customizable in terms of number of tiers and angles - Lightweight structures… excellent cost performance and quick installation ■ Ground-mounted structures (pile foundation) - OT screw piles… piles that utilize the strength of the ground. Easy to install and remove - Steel pipe piles… effective in areas with low pull-out strength. Can be installed even in hard rock areas ■ Flat roof structures… possible at high elevations! Custom design to fit roof shapes ■ Aluminum structures (high corrosion resistance, high strength, lightweight)… high strength due to corrosion-resistant and thick-walled construction ■ Standing seam roof structures… bolt-fixed to prevent detachment due to strong winds or earthquakes ■ Parking lot structures… effectively utilizing parking lots as power generation sites ■ Special custom-made structures… designed and constructed to meet various conditions *For more details, please feel free to contact us.

  • others
  • Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Steel structure construction [*Integrated manufacturing and construction system*]

From steel frame construction of public buildings, offices, factories, and stores made of heavy and light steel frames, to the fabrication of steel staircases that match the buildings!

At Otsu Iron Works, we undertake construction projects that involve the processing and assembly of steel materials such as shaped steel and steel plates to create structures. We have experience in steel construction for public buildings, office buildings, factories, and stores, both in heavy steel frame and light steel frame. We also welcome inquiries for custom-made products and creative metalwork. 【Reasons to choose Otsu Iron Works for your construction】 1. Selection of factories based on the scale of construction and manufacturing difficulty. 2. Capable of handling steel fabrication at J-grade to H-grade factories. 3. Comprehensive management from production to on-site construction (erection, final tightening, welding work) through Otsu Iron Works' network. *Please feel free to contact us for more details.

  • others
  • Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Benefits of installation without slope!! Drain pump + hose installation

Anyone can install it, and there are extremely few construction defects!! A new drainage piping installation method that does not require a slope: 'Drain Pump + Hose Installation'

What are the benefits of the "drain pump + hose installation" that does not require a slope? In traditional "PVC piping installation," a drainage method utilizing natural slope is employed. Designing and constructing piping routes that ensure the necessary slope for drainage requires specialized knowledge and extensive experience, making it a time-consuming process. There is also a concern about water leaks due to construction defects at the numerous adhesive joints. If there is a mistake in the design, it is not easy to change the piping route on-site. If time-consuming processes are required again, extending the construction period becomes unavoidable. In contrast, the "drain pump + hose installation" uses the power of the pump to discharge water without requiring a natural slope. The installation does not need a slope; it simply involves installing the pump and connecting an insulated hose to the drainage point. Since no specialized knowledge or experience is needed, the installation is straightforward. The process is minimal and does not take much time. Additionally, hose piping has no adhesive joints, significantly reducing the risk of construction defects. As mentioned earlier, even if there is a design mistake, the piping route can be flexibly changed on-site without affecting the construction schedule. The reason there are many repeat customers is due to these advantages.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Aichi Real Estate Consultants

Here is an example of a stylish and clean space that we designed!

We would like to introduce a construction case for Aichi Real Estate Consultants. We have laid out the three elements of office space, meeting space, and seminar room within a limited area with an easy-to-use flow. Additionally, the layout of the handwashing and kitchen areas is designed to ensure that both employees and clients do not feel cramped. 【Case Overview】 ■Company Name: Aichi Real Estate Consultants ■Area: 38 tsubo *For more details, please refer to the related links or feel free to contact us.

  • Other services
  • Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Example】Our Break Room and Golf Room

We will introduce a case where a café space was created in a warehouse that had been used as a storage area!

We would like to introduce examples of construction in our company's break room and golf room. The golf room was created as a showroom for proposals to customers, and to enable staff to experience it for better suggestions. Now, this space has also contributed to enhancing communication among staff. 【Case Overview】 ■Company Name: Takeichi Wind Nagoya Co., Ltd. (Our company's break room and golf room) ■Area: Café 12 tsubo, Golf 22 tsubo *For more details, please refer to the related links or feel free to contact us.

  • Other services
  • Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Nakao Construction Industry Co., Ltd. Headquarters

A case where a plan was developed to create an office that promotes active communication among employees!

We would like to introduce a construction case study for the headquarters of Nakao Construction Industry Co., Ltd. In a warehouse exceeding 100 tsubo that was once a staff dormitory, we removed the partitions to create a spacious open floor area. Within this open floor, we installed a glass-walled see-through conference room, which serves as an accent for the space while gently dividing the individual desks. [Case Overview] ■ Company Name: Nakao Construction Industry Co., Ltd. Headquarters ■ Area: 202 tsubo *For more details, please refer to the related links or feel free to contact us.

  • Other services
  • Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] MamaSmile House Showroom

Introducing a case study that advances the plan so you can imagine the home we are about to design!

We would like to introduce a case study for MamaSmile. We created a stylish space that mothers dream of, resembling a café in Brooklyn. The kids' area and diaper changing space are designed to be both functional and stylish. 【Case Overview】 ■Company Name: MamaSmile House Showroom ■Area: 46 tsubo *For more details, please refer to the related links or feel free to contact us.

  • Other services
  • Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

We accept design, manufacturing, and construction of canned products.

Durable and beautiful exterior finish! We can also accommodate requests for plating and specified film thickness.

We accept the design, production, and construction of fabricated products. We can also respond to requests such as "only need fabricated products without a soundproof room." We offer a durable and beautiful finish through baked painting, and we can accommodate requests for plating and specified film thickness. 【Examples of Production】 ■ Decks and Handrails ■ Stairs and Monkey Ladders ■ Equipment Stands and Mold Storage Shelves ■ Indoor Deck Plates ■ Safety Covers (Shafts and Drive Parts) ■ Exhaust Hoods and Dust Collection Hoods ■ Ceiling Cranes and Frames *For more details, please refer to the PDF materials or feel free to contact us.

  • Other contract services
  • Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

High-temperature resistant heater for ceramic polyimide heater installation.

Heater that can be attached to brittle materials such as ceramics and curved surfaces.

In general, the adhesive used to attach the heater to the heating target is the limiting factor that determines the heat resistance temperature. Our company can adhere the heater to the object without using conventional adhesives thanks to our unique attachment technology. Additionally, during thermal pressing, we use a special processing furnace instead of a mechanical press, conducting the process in a high-temperature gas pressure environment. As a result, there is no excess load, making it suitable for application on brittle materials such as ceramics. Due to the gas pressure, attachment is possible not only on flat surfaces but also on curved surfaces.

  • Other FA equipment
  • Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Aitec Co., Ltd. Business Introduction

We will undertake it at a low cost with our unique know-how.

Spindles, as well as robot jigs, are diverse and varied. We can instantly produce painting jigs and provide services tailored to customer needs, from design to creation, using injection molding, NC lathes, and collaboration with specialized factories. 【Main Services】 ■ New painting equipment installation, design, and construction ■ Repair, modification, design, and construction of existing equipment ■ Control equipment, construction, and sales ■ Various sales of intake and exhaust filters ■ Sales of coagulants, single-component, two-component, and UV specifications ■ Cleaning of painting booths and fans *For more details, please download the PDF or feel free to contact us.

  • Other safety equipment
  • Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Sanjin Engineering Co., Ltd. Business Introduction

We can handle everything comprehensively! Please leave your equipment construction needs to us.

At San-ai Engineering Co., Ltd., we carry out equipment construction primarily focused on the design and installation of heating and cooling air conditioning systems, electrical equipment such as new or additional lighting, air conditioning ducts, and kitchen ducts. We offer a wide range of services including general renovations and house cleaning, and we also handle all equipment related to store and residential renovations, as well as the manufacturing of control devices for environmental-related and industrial machinery control panels and operation panels. Additionally, we can clean and repair imported range hoods, so please feel free to consult us. 【Business Contents】 ■ Store and residential renovation equipment ■ Control board design and installation ■ Air conditioning equipment ■ Electrical equipment ■ Water supply and drainage sanitary equipment, etc. *For more details, please download the PDF or feel free to contact us.

  • Other contract services
  • Other water treatment equipment
  • Control Panel
  • Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Example】Fresh Produce Distribution Center

Many achievements in snow-covered areas! Introducing examples of design and construction of low-temperature response systems!

We would like to introduce a case study of the design and construction of a low-temperature compatible system building. This system not only accommodates high quality, low cost, and short construction periods but also has numerous achievements, balancing usability and cost performance. 【Construction Case】 ■ Yokohama Marunaka Seika Co., Ltd. Southern Market Distribution Center (Kanagawa Prefecture) ・ Construction: Hishiju Cold Chain Co., Ltd. *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Biomass Power Plant

Many achievements in snow accumulation areas! Introducing examples of design and construction by Kawada System Architecture!

Here are examples of projects where the Kawada system architecture was designed and constructed. This system not only accommodates high quality, low cost, and short construction periods, but also has an experienced design team to assist with planning. 【Construction Examples】 ■ Monbetsu Biomass Power Plant (Monbetsu City, Hokkaido) Chip factory, yard building, solidification curing building ■ Client: Monbetsu Biomass Power Co., Ltd. Okhotsk Bioenergy Co., Ltd. (Sumitomo Forestry, Sumitomo Joint Power) ■ Power Plant Construction: Sumitomo Heavy Industries, Ltd. ■ Factory Yard Construction: Kawada Industries, Ltd. *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Proposal for Test Construction for Improvement of Manufacturing Industry and Factories through Beautification

Effective for protecting against dirt and scratches on the floor! We will suggest suitable products based on your concerns!

At Three S Corporation, we propose effective products tailored to various customer concerns and conduct test installations. Our proposed "solvent-free UV coating" protects floors from scratches caused by the movement of equipment and forklift traffic, as well as dirt from oils, chemicals, and footprints, thereby improving maintenance. As the name "UV coating" suggests, it cures completely in just a few seconds when exposed to ultraviolet light, significantly shortening the curing period. It can be applied to floors using various solvents, demonstrating high durability and maintainability. In a certain food factory, issues arose from difficult-to-remove oil stains and slipping due to oil and water on the floor. However, after application, the oil stains became much easier to clean, and the floor became less slippery even when oil or water was present. Please verify the effectiveness of our products and installation through sample applications in actual settings. [Case Study from a Food Factory] ■ Effects - Improved hygiene and reduced slipping, contributing to employee safety ■ Introduced Product - Solvent-free UV coating (matte anti-slip) *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

No foundation required for quick installation, easy relocation! 'High-Speed Sheet Shutter'

Amazing effects on the environment and efficiency! Insect and dust prevention, energy saving and air conditioning, and improved work efficiency.

The "Gatekeeper Self-Supporting Series" can be installed quickly without the need for a base, and it is easy to relocate when changing layouts, allowing for a neat installation while keeping costs down. Even if a lift or cart collides during operation, it will temporarily stop and ascend slowly (0.5m/second) to automatically return to the rail. In the event of a power outage, simply lifting the lower part allows for easy passage, making it a safe structure even for women. You can choose from a variety of sheet colors. Additionally, we offer peripheral devices that can be selected according to your needs and sizes. 【Features】 ■ Insect and dust resistant ■ Self-supporting structure ■ Quiet operation ■ Ultra-fast ■ High airtightness *For more details, please refer to the PDF document or feel free to contact us. Manufacturer: Komatsu Electric Industry Co., Ltd.

  • curtain
  • Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Related Technology and Construction: "Plant Cleaning Before Suspension and Dismantling"

Introducing technologies and construction details related to plant cleaning and wastewater treatment!

This document introduces the technologies and construction methods used in Nisshin Kogyo's plant-related business. For plant cleaning before suspension or dismantling, we propose a consistent construction system utilizing our technology. For cleaning tanks, piping, and equipment, we offer methods such as ultra-high-pressure water cleaning and PIG cleaning. For industrial waste, we provide cleaning methods including collection, transportation, recycling processing, and wastewater treatment. Additionally, we also introduce wastewater treatment using mobile wastewater treatment units. 【Related Technologies and Construction】 ■ Plant Cleaning Before Suspension or Dismantling - Tank, Piping, and Equipment Cleaning: High-pressure water cleaning, PIG cleaning, etc. - Industrial Waste: Collection, transportation, recycling processing, wastewater treatment ■ Wastewater Treatment - Mobile Wastewater Treatment Units *For more details, please refer to the PDF document or feel free to contact us.

  • Wastewater/wastewater treatment equipment
  • Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Mold removal and prevention construction using the "On-site Special Mixing Treatment MAD Method."

Aren't you giving up on "mold" and "dirt"? We will introduce the mold removal process with before and after photos.

Oceans Co., Ltd. offers mold removal and prevention services using the "On-Site Dedicated Mixing Treatment MAD Method." The "MAD Method" is not just a cleaning technique but a regenerative cleaning method. It does not involve scrubbing with brushes or using mold prevention disinfectants or bleaching agents. It is worth trying on "stains you have given up on" that you have tried various methods to remove but couldn't. Please feel free to consult with us first. 【Features】 ■ Safe and Secure - Minimizes damage to materials and uses only safe cleaning agents ■ Antimicrobial and Antimold Effects - Breaks down mold and stains from the root ■ Lower Cost than Repair - No extensive construction required - If the cause is "dirt," it can be removed *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services
  • Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

External pipe meat filling welding construction

We developed an in-house device for applying overlay welding on the outer surface of pipes and implemented it! It is also possible to perform bending processing on the welded overlay pipes.

Our company has developed and is implementing an in-house device for overlay welding on the outer surface of pipes used in areas prone to wear, such as screen tubes and various nozzles in boiler furnaces, to ensure resistance to corrosion and wear. Additionally, it is possible to perform bending processing on the welded overlay pipes. We have also obtained a patent for the cooling method of these pipes. 【Features】 ■ In-house developed device for overlay welding on the outer surface of pipes ■ Bending processing can also be performed on the welded overlay pipes ■ Patent obtained for the cooling method of these pipes *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Sankoh Electric Co., Ltd. FA System Business

In the FA system, we turn your "requests" into "reality."

The FA system business of Sanko Electric Co., Ltd. is based on custom-made solutions. We have in-house mechanical design engineers, electrical circuit design engineers, and PC software development engineers, who create proposals tailored to our customers' needs after conducting hearings. From hearing to design, development, implementation, and after-sales support, we shape our customers' requests in a one-stop manner. 【System Development Examples】 ■ Management systems utilizing M2M and IoT ■ Voice control systems ■ Traceability systems + prevention of defective product outflow ■ Power monitoring and drive monitoring systems ■ Production instruction systems, etc. *For more details, please download the PDF or contact us.

  • Production Management System
  • Mechanical Design
  • Contract manufacturing
  • Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Fall prevention wire method: Easy for anyone, overwhelmingly fast standard construction.

A reliable construction method registered with NETIS. Highly regarded in buildings, station structures, and highways. The reasons are accurate construction, ease and speed of installation, and standardization of construction quality.

We provide flexible and reliable solutions for vibration prevention and fall protection of equipment over a wide range. Installation is completed with a simple one-touch action by just threading the wire through the hanger, without the need for special tools. It is equipped with a safety lock for emergencies. This is an effective solution against vibrations and falls of equipment. 【Features】 ■ Quick installation - no troublesome bolts or locking screws required ■ Easy to apply tension, with the ability to readjust tension ■ Designed with safety and security in mind, suitable for high loads *For more details, please download the PDF or contact us.

  • Other safety and hygiene products
  • Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction of complex shapes

Complex shape

Products with significant unevenness in construction carry the risk of inconsistencies, but skilled craftsmen can achieve a mirror finish even on complex shapes. Please make use of this for installations of products where you want to maintain design integrity.

  • others
  • Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

"Batcher Plant" *Supports design, construction, and maintenance.

We accurately capture new technological trends and customer needs, and propose suitable services!

Our "Batch Plant" establishes a new equipment environment and system that comprehensively considers the production and shipment of homogeneous and high-quality fresh concrete. We handle everything from the design and construction of our own brand to the introduction of plant manufacturers, not only for new plant installations but also for the modification, relocation, and dismantling of existing plants. We accurately capture new technological trends and customer needs to propose suitable services. 【Features】 ■ Establishment of a new equipment environment and system ■ Support for the modification, relocation, and dismantling of existing plants ■ Ability to propose various storage and weighing methods for plants according to application *For more details, please refer to the PDF materials or feel free to contact us.

  • image_10.png
  • image_11.png
  • image_12.png
  • image_13.png
  • image_14.png
  • image_15.png
  • image_16.png
  • image_17.png
  • image_18.png
  • Other services
  • Other contract services
  • Machinery and equipment installation/dismantling/relocation
  • Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Planning, design, construction, production, and execution of monuments [Free booklet available]

Bringing imagination to life! We meet various needs and purposes related to monuments.

First of all, please feel free to consult with us! 【Strengths of Japanese Streetlight Manufacturing】 〇 Planning and Proposals Experienced sales staff will assist in concretizing your concepts. 〇 Unique designs tailored to your needs Designs that harmonize with the town's landscape, history, and the purpose of building monuments. 〇 One-stop service provided (integrated system) Total support from planning, design proposals, and engineering to production and construction. 〇 Numerous achievements in front of train stations. 〇 Capable of nationwide delivery.

  • others
  • Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Planning, design, construction, production, and execution of the clock tower [Free booklet available]

We respond to a variety of needs and purposes, from symbols of the town to functional clock towers with lighting and environmentally friendly solar designs.

First of all, please feel free to consult with us! 【Strengths of Japanese Streetlight Manufacturing】 〇 Planning and Proposals Experienced sales staff will assist in concretizing your concepts. 〇 Unique designs tailored to your needs Designs harmonized with the landscape of the installation site, its history, and the purpose of building a clock tower. 〇 One-stop service provided (integrated system) Total support from planning, design proposals, and engineering to production and construction. 〇 Numerous achievements in station square projects. 〇 Capable of nationwide delivery.

  • others
  • Municipal services and business location
  • Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP lining construction for existing steel oil tanks.

FRP construction of oil tanks that prevents deterioration from the inside of the tank for a semi-permanent period. Completely prevents leakage of hazardous materials. [Catalog available]

FRP lining completely prevents hazardous material leakage by applying FRP to the inner surface of tanks. The FRP lining sheet method involves attaching FRP sheets made of oil and chemical-resistant materials, which are manufactured in a factory, to the inside of the tank and curing them with ultraviolet light, ensuring that there is no corrosion from the inside for a semi-permanent duration. Once completed, it functions similarly to a double-shell tank. <Features of the Construction> ■ Tank inner surface lining (sheet method) This method eliminates the uneven thickness often caused by liquid dripping on the top surface of the tank during liquid FRP hand application (hand lay-up method), resulting in uniform thickness and high construction quality. ■ FRP cures with light (ultraviolet) [20-30 minutes] There is no heat generation during the curing of FRP, preventing any issues with the outer protective material. It can also be applied during winter. ■ Short construction period Construction can be completed in 5 to 10 days for two 10KL tanks simultaneously. (Depending on the presence of inspection openings) *For more details, please download the catalog or feel free to contact us.

  • Piping Materials
  • Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration