[Case Study] Simplification of Assembly Work Using Positioning Dowels
The reduction of assembly work hours will lead to cost savings.
We will introduce cost reduction points for mechanical assembly. When there are no reference marks for positioning, the installation of parts is done while measuring to ensure that the installation position matches the dimensions on the drawings, which can take a lot of time during assembly work. Therefore, by designing for positioning using dowels, tabs, notches, etc., the positioning of parts during assembly becomes smoother. As a result, the man-hours for assembly work are reduced, leading to cost savings. *For more details, please refer to the PDF materials or feel free to contact us.
- Company:絹川工業
- Price:Other