High Cement Content Soil Improvement Agent MT Series [Construction Case] River Channel Excavation Work
An alternative to vacuum and sealed dumps! A case where dredged soil was improved and immediately transported to a sediment disposal site about 10 km away.
This construction project involves dredging sediment accumulated in the river to secure the riverbed. The site has a very narrow work yard, and there was no space to temporarily store and air-dry the dredged sediment. Initially, lime-based materials were considered, but concerns arose regarding securing storage space and the potential for dust dispersion to nearby areas. As a result, a high-water-content soil stabilizer called 'MT-2' was adopted, and after improving the dredged sediment with this product, it was immediately transported to a sediment disposal site located about 10 km away. *For more details, please refer to the PDF document or feel free to contact us.*
- Company:森環境技術研究所
- Price:Other