[PPA Model Implementation Case] The deciding factors are the speed to start power generation and the track record!
The results after 5 months of operation at Nitto Denko Kanto Office are 141,578 kWh generated! A reduction of 70.0 t-CO2/kWh in CO2 emissions has been achieved.
This is a case study of Nitto Denko Corporation, which operates globally in sectors such as electronics, automotive, life sciences, and environmental-related fields. The company learned about Aozora Electric Power while considering solar power as a method for acquiring renewable energy. Since it takes time from budget planning to the start of power generation for in-house implementation, they decided to choose Aozora Electric Power (PPA model), which does not require initial investment or maintenance costs. 【Installation System Overview】 ■ Panel Installation Location: Factory Roof ■ Power Generation Output (Module): 382.20 kW ■ Power Generation Output (Power Conditioner): 250.00 kW ■ Installation Area: Approximately 1,975 m² ■ Management Equipment: Remote Monitoring System for Power Generation ■ Orientation (0 degrees being true south): 0 degrees east ■ Incline: 2 degrees (following the roof) *For more details, please refer to the PDF document or feel free to contact us. Sun Junior HP - https://www.sunjunior.co.jp/
- Company:サンジュニア 本社
- Price:Other