[Example] Third-class benchmark surveying using simultaneous observation method with two network-type RTK systems.
Simultaneous observation of two units using network RTK! Observation completed in just one and a half days!
We would like to introduce a case study conducted by Shinsoku Giken Co., Ltd. on "3rd Class Benchmark Survey using Network RTK with Simultaneous Observation of Two Units." From the new points of 55, it was a site that required 4 days with 10 receivers and 4 personnel for static observation as usual. In this case, due to difficulties in arranging equipment and personnel, we conducted simultaneous observation with two units using network RTK with the cooperation of Sokia Co., Ltd. 【Site Overview】 ■ Number of Points - Reference Points: 7 - New Points: 55 ■ Date and Time - 2 days - 17th (8:54 AM - 6:11 PM) *Number of observation vectors: 53 - 18th (9:05 AM - 2:25 PM) *Number of observation vectors: 30 ■ Equipment: 2 sets of Network RTK ■ Personnel: 2 people *For more details, please refer to the PDF document or feel free to contact us.
- Company:ジェノバ
- Price:Other