[Construction Example] Installation of a Simple Clean Room for Company N in the Large Parts Manufacturing Industry
Construction period is 2 to 3 days! Cleanroom level, shape, etc. are custom-designed and constructed.
At Company N, a large parts manufacturing company, there were multiple processing machines at the time, and the factory was constantly filled with invisible polishing powder, mist, and dust. As a result, during critical finishing processes (such as mirror finishing and glass material processing), these particles became the cause of fine scratches, leading to significant complaint costs. To address this, a simple cleanroom was installed. It was much more cost-effective compared to an actual cleanroom, and the installation took only 2 to 3 days, which did not affect the factory's operations. Consequently, the issue of finishing surface complaints was resolved, and we received very positive feedback from the site. [Case Summary] ■ Challenges - The factory was constantly filled with invisible polishing powder, mist, and dust. - These particles caused fine scratches during processing, resulting in significant complaint costs. - There were no funds for construction costs, and there was no downtime for the machines. ■ Results - The installation took only 2 to 3 days, so there was no impact on factory operations. - The issue of finishing surface complaints was resolved. *For more details, please refer to the PDF document or feel free to contact us.
- Company:吉田工業
- Price:Other