Sofir Introduction Case: Mount Ontake Visitor Center
The construction system utilizes the Sofeel recycling method! The processing capacity is for 257 people, with a case of 12.4m3 per day.
At the Ontake Mountain Visitor Center in Otaki Village, Kiso District, Nagano Prefecture, we would like to introduce a case study of our "Sofeel" system. The construction system is "Sofeel Circulation Utilization," with a processing capacity of 257 people and 12.4m³/day. The construction period was in 2022. 【Case Overview】 ■ Construction Location: 3162 Tahan, Otaki Village, Kiso District, Nagano Prefecture ■ Construction Period: 2022 ■ System: Sofeel Circulation Utilization ■ Processing Capacity: 257 people, 12.4m³/day ■ Client: Nagano Prefecture *For more details, please refer to the PDF document or feel free to contact us.
- Company:ソフィール協会 (事務局)アルコ株式会社
- Price:Other