We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for 3D CAD.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

3D CAD Product List and Ranking from 41 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Aug 27, 2025~Sep 23, 2025
This ranking is based on the number of page views on our site.

3D CAD Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Aug 27, 2025~Sep 23, 2025
This ranking is based on the number of page views on our site.

  1. アシストナビ Kanagawa//others
  2. 東邦製作所 Tokyo//Industrial Machinery
  3. null/null
  4. 4 ソシアパーティション (旧 株式会社コマツパーティション) Tokyo//Other manufacturing
  5. 5 コダマコーポレーション 本社、大阪営業所、名古屋営業所 Kanagawa//CAD/CAM

3D CAD Product ranking

Last Updated: Aggregation Period:Aug 27, 2025~Sep 23, 2025
This ranking is based on the number of page views on our site.

  1. Research, Development, and Evaluation "TEG Wafer" アシストナビ
  2. Control motor (electric operation device) CAD data 東邦製作所
  3. Socia partition CAD data ソシアパーティション (旧 株式会社コマツパーティション)
  4. 4 Electric valve and solenoid valve CAD data 東邦製作所
  5. 4 Data Integrity Compliance Software for Laboratory Process Management メトラー・トレド

3D CAD Product List

31~45 item / All 175 items

Displayed results

[BIM Software Implementation Case Study] Mechanical (Cultural Center)

Adopting an appropriate solution! A case where work was coordinated through open communication.

This project connects two reinforced concrete structures using steel trusses with concrete slabs on each floor. The complexity of the joints in the steel structure, as well as the joints between the steel and reinforced concrete structures, increased due to their shapes and angles, becoming a challenge for the project. By maintaining open communication among the design architects, structural engineers, and fabrication team, we were able to smoothly discuss and adopt appropriate solutions even for very challenging aspects of the overall steel construction. 【Case Overview】 ■Challenges - Complexity of the joints in the steel structure - Increased complexity of the joints between the steel and reinforced concrete structures due to their shapes and angles ■Result: We were able to adopt appropriate solutions *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩The catalog can be downloaded from the special website below⇩

  • Software (middle, driver, security, etc.)
  • Other CAD related software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Brookfield Place Tower

Widely used for identifying interference points with design! We will introduce case studies of BIM software implementation.

The ICD Brookfield Place Tower, with 54 floors and a height of 282 meters, was constructed at the Dubai International Financial Centre. Considering the complex shape and the precision required at each construction stage, the steel structure design using Tekla played a crucial role in the project's success. "Tekla BIMsight" was widely used to identify interference points in the design by contractors for the roof and facade, equipment vendors, concrete contractors, and other stakeholders, and the detected interference points were resolved during the design phase. Adjusting the unique and complex steel structure was a challenging task, but BIM facilitated smooth coordination with the design and other stakeholders, as well as the generation of fabrication drawings, contributing to successful construction on schedule. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special site below ⇩

  • Software (middle, driver, security, etc.)
  • Other CAD related software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Kilpilahti Industrial Area Wastewater Treatment Facility

Avoiding interference, reducing rework and additional costs! A case where significant time was saved.

This project is an industrial initiative boasting the highest level of safety, modeled through seamless collaboration among designers from various countries, utilizing "Tekla Structures" and "Tekla Model Sharing." In addition to preliminary quantity calculations, estimate creation, and determining the pouring sequence, adjustments to rebar placement with rebar processing contractors, material quantity calculations, site layout, monitoring of progress and costs, and HVAC design were all conducted using Tekla Structures, which also incorporated plumbing design as a reference model. By using Tekla models to collaborate with other departments, not only can a clear image of the actual construction site be obtained, but detailed change information can also be verified, allowing for the avoidance of conflicts and the reduction of rework and additional costs. Modeling not only deepens the understanding of the design process but also enables more extensive and flexible technical decisions than ever before, significantly shortening the time required. *For more details, please refer to the PDF document or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • 2D CAD Construction
  • 3D CAD
  • Modeler

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Pasila District Development Project

Utilizing modeled information extensively in the production plan! Achieving impressive facade architecture.

Tripla is a large-scale project located in the Pasila district, consisting of a mixed-use area in Block 3, which includes the construction of the Tripla Mall, offices, apartments, hotels, and the renovation of Pasila Station. The success of the project can be attributed to the open attitude of all stakeholders towards BIM and digitalization, adopting an experimental approach. Various software products and technologies have been tested and utilized in the project. In cases where existing solutions are not available, custom solutions and methods have been established to support this large-scale development project. The construction of the BIM model and model-based visualization played a crucial role not only in negotiations among various stakeholders but also in marketing. [Case Overview] ■Challenge: The enormous data size of the design model ■Response: Dividing the model into units and separating the published model and documentation from the actual building's solid model *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩The catalog can be downloaded from the special website below⇩

  • 2D CAD Construction
  • 3D CAD
  • Modeler

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Subway Extension Line Ranchi Metro

Effectively utilized in various situations! Case study of implementation in one of Finland's largest infrastructure projects.

The Länsimetro is a subway line that connects the city of Helsinki with the neighboring city of Espoo. The construction of eight new stations, each with its own unique characteristics, has enabled passengers to travel using the subway. To realize this large-scale project, the engineering company A-Insinoorit began the design work in 2009. It was clear from the outset that BIM was necessary to manage the construction of the underground stations, which have various aspects. Multiple CAD programs were used for design and equipment planning, but structural design was fully implemented using "Tekla Structures." 【Case Overview】 ■ Implementation Site: Subway Extension Line Länsimetro (One of the largest infrastructure projects in Finland) ■ Implemented Product: Tekla Structures *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩The catalog can be downloaded from the special site below⇩

  • 2D CAD Construction
  • 3D CAD
  • Modeler

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] West Terminal 2 Project

Achieving high-difficulty construction in a short period! A case study of executing a project using BIM.

West Terminal 2 is a new ferry passenger terminal in Helsinki, Finland, completed in March 2017. The new terminal was designed with a focus on functionality to ensure smooth and efficient boarding and disembarking for passengers. Many stakeholders utilized BIM throughout the project, from design to manufacturing and construction, in pursuit of design and quality. BIM software was introduced for design, structure, and equipment design, and "Tekla Structures" was adopted for the design of the building, which features a geometric design including a curved roof, sloped canopies and facades, and tall glass walls. BIM is not only an excellent tool for adjusting various design requirements and achieving complex construction within a short timeframe, but the client also appreciates that it helped deepen the understanding of the design. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • Other CAD related software
  • 2D CAD Construction
  • 3D CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Shopping Center Project

Achieving High Quality! A Case Study on Effectively Utilizing BIM Models as a Communication Tool

About 100 years ago, Porin Puuvilla was used as a spinning mill, and in 2014, it was transformed into a large shopping center with offices, a housing sales center, warehouses, and parking, while retaining some of the factory's features. The 13 companies involved in this large-scale renovation project utilized model-based design and leveraged BIM throughout the project, significantly improving the construction process and the quality of the building. Parma, which handled the design, manufacturing, and construction of precast concrete, worked on BIM within a very tight schedule. They not only extensively utilized rich model information in manufacturing and construction but also focused on modeling with consideration for the needs of all stakeholders, facilitating collaboration among them at each phase. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩The catalog can be downloaded from the special website below⇩

  • Other CAD related software
  • 2D CAD Construction
  • Modeler

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Denver International Airport Expansion Project

All stakeholders use Tekla to achieve efficient collaboration! Case study on the introduction of BIM software.

At Denver International Airport, the construction of a new train station connecting downtown to the airport and a hotel is underway. The design of this hotel, including its curved roof, evokes the image of an airplane when viewed as a whole. To achieve this exterior, which consists of many curved surfaces and intricate parts, technology was required to accurately process various complexly bent shapes of plates. Therefore, the project team set it up so that the coordinate location information output from "Tekla Structures" is automatically displayed on each fabrication drawing. This made precise processing possible. By having all stakeholders use Tekla, it has become easier for team members to carry out various tasks such as planning, data exchange, and defect corrections, thereby achieving efficient collaboration. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩The catalog can be downloaded from the special site below⇩

  • Other CAD related software
  • 2D CAD Construction
  • Modeler

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Amaar Bakke

Reducing issues in the pre-construction phase! One of the largest environmental projects in Europe utilizing BIM.

The new plant "Amar Bakke," aimed at waste incineration and energy recovery, has replaced the Amar incinerator, which had been in use for 40 years until 2017, and features ski slopes and a climbing wall. The Danish engineering company Moe A/S was responsible for the planning of the structure and the management of the Amar Bakke project. Utilizing "Tekla Structures," they detailed the modeling from rivets to bolts, and also used it for generating quantity specifications, bid lists, order catalogs, and construction management. This product is consistently used daily by a drafting and modeling team of 3 to 6 people, while structural engineers check intricate details within the model and take measurements, sharing the model with other project stakeholders for collaboration. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • Other CAD related software
  • antenna
  • 2D CAD Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case] Oslo Airport Terminal 2

Harnessing the power of Open BIM! Introducing examples where everything except analysis was done using Tekla Structures.

Oslo Airport's Terminal 2 is a massive construction project involving over 100 affiliated companies, which must ensure safety and airport security on a daily basis while smoothly and reliably carrying out regular operations. This has posed a challenge for Aas-Jakobsen, the main structural engineer. The project required smooth collaboration with the airport management company, Avinor, and end clients, necessitating modeling by the affiliated companies. After trying several software solutions, Avinor decided to adopt "Tekla Structures" for this project. By using the Tekla Structures model for visualization, the creation of reinforced concrete, generation of documentation, and scheduling have become easier, and the model has also been beneficial to the affiliated companies. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • Other CAD related software
  • 2D CAD Construction
  • Modeler

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Lamprell Company (Marine Structures)

Significant improvement in the efficiency of the structural design department! Introducing the case of Lamprell, which achieved high precision.

Lamprell, a company engaged in the engineering of marine structures, chose "Tekla Structures" with a good understanding of the speed, accuracy, consistency of detailed design, and the interference checking function between steel components, as well as the benefits of visualization. Initially, there were some doubts about the plan to use Tekla software for the fabrication of the barge, but considering the accuracy of the software, it was unanimously decided that utilizing 3D modeling would be the better approach. The modeled barge was able to extract various detailed information, such as platforms and handrails, within approximately 4 to 5 months. The team has a strong trust in the support system of this product and expresses great satisfaction with the ease of managing documentation on the software and the functionality for keeping records of drawing changes. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩The catalog can be downloaded from the special website below⇩

  • Other CAD related software
  • 2D CAD Construction
  • Modeler

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case] Blue Lock Quarry

Achieving great results even in challenging projects between remote locations through the use of Tekla Structure!

Fulton Hogan Quarries undertook a project to renovate the crushing and screening plant at the Blue Rock Quarry located in Cedar Creek, Queensland, Australia. The Blue Rock Quarry is situated approximately 50 km south of Brisbane's city center. The objective of this project was to expand the production capacity of the crushing and screening plant to meet the anticipated increase in demand for aggregate and road base products. Proindustrial Construction Company (Portugal) closely collaborated with contractors NascoTech and Southern Cross Engineering to carry out the civil works and structural design of the steel structures for this complex facility. The company was also responsible for creating various types of drawings and documents used in steel fabrication, including detailed designs for connections and joints, as well as shop drawings. Although this was a challenging project that required design collaboration between remote locations in Australia and Portugal, significant achievements were made thanks to the use of Tekla Structure and the dedicated efforts of the participating team members.

  • 3D CAD
  • 2D CAD Construction
  • antenna

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Agora Evry Arena

Even when faced with unexpected challenges, it became possible to continue working by utilizing Tekla Model Sharing.

This construction is a renovation project for the Agora Evry Arena, which was built as an auditorium in 1970. At that time, it was a complex project that required high technical skills, and the expertise of the Bordan Châtauneuf team was necessary for the construction. The first challenge of this project was to recreate the design model of the existing building from scratch in order to add a new structure. The modeling was based on a manual created by Bordan Châtauneuf in 1970. Using point cloud data obtained from a 3D scan of the existing structure, the components were adjusted by a few centimeters. It was confirmed that the measured point cloud data had position information very close to that of the actual building. This "research" faced several unexpected challenges, but despite the difficulties, it became possible to continue working by utilizing Tekla ModelSharing.

  • 3D CAD
  • 2D CAD Construction
  • antenna

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Metropolitan Bus Terminal

All 3D models, including documents such as production drawings and work processes, are created using Tekla Structures!

The Integrated Transport Center is the largest investment project of the Lublin city government, and as part of this, the contractor Budimex has constructed a new bus station along with the reconstruction of the transport system. The company responsible for this impressive steel structure is Mostostal Kraków. The highlight of this project, the Lublin Metropolitan Bus Terminal's roof, is a representative landmark of Lublin, with the weight of the steel columns and truss sections with crowns totaling approximately 1550 tons. Its artistic appearance is composed of precise processing techniques and complex welding. MTA Engineering was responsible for the structural calculations, and the design engineering department of Mostostal Kraków led the detailed design work. The station's roof was designed as a spatial structure, supported by diagonal columns. All 3D models, including production drawings and work process documents, were created using Tekla Structures.

  • 3D CAD
  • 2D CAD Construction
  • antenna

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Tampere Deck Arena

Utilizing BIM in all designs! A case of a unique activity complex located above the railway in the city center.

The Tampere Deck Arena project is part of a large-scale development taking place around the central station of Finland's third-largest city. The construction of a unique activity complex that has emerged above the railway tracks in downtown Tampere was a highly unusual and challenging project even on an international level. The scale of construction, the complexity arising from various design requirements, the number of stakeholders involved, and overlapping responsibilities were challenges for the project, but these issues were resolved by combining various BIM models. One of the challenges faced by the designers was the coordination of interference issues that would have been unmanageable without the use of BIM for a project of this scale. By utilizing BIM, adjustments to the structures around the railway tracks and the positioning of ceilings and equipment were carried out without any problems. A large number of engineers participated in this project, and advanced BIM software was helpful when explaining construction decisions. Additionally, the use of BIM software allowed designers and other project stakeholders to focus on key tasks such as design and project management.

  • 3D CAD
  • 2D CAD Construction
  • antenna

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration