Diffuser Tube Membrane Microbubble Diffuser Tube Energy-saving Implementation Case in Food Factories
Reduce conventional power costs from 25.7 kW to below 11 kW! Average electricity costs will be about one-third of the conventional amount! The payback period for the initial investment is only 2 to 3 months.
Membrane Fine Bubble Aeration Pipe [Energy Saving Implementation Case for Food Manufacturing Plants] Due to the poor oxygen dissolution efficiency of a certain manufacturer's aerator that was previously installed, the electricity costs for wastewater treatment had become high. To reduce electricity costs, we introduced our membrane fine bubble aeration pipe "Pipeflex," which has a high oxygen dissolution efficiency. [Effects of Introducing the Membrane Fine Bubble Aeration Pipe] ■ Reduced conventional power costs from 25.7 kW to below 11 kW, resulting in a decrease of 14.7 kW. ■ By replacing with the membrane fine bubble aeration pipe, operation was achieved with just 1 out of the 5 units previously used with the conventional aerator. ■ On average, electricity costs were reduced to about one-third of the previous amount (over 70% cut). ■ Payback period for the introduction cost = approximately 0.2 years (recovered in just 2-3 months). *Note: Installation costs for piping are not included. *For more details on the Membrane Fine Bubble Aeration Pipe [Energy Saving Implementation Case for Food Manufacturing Plants], please contact us or download the catalog.
- Company:エンバイロ・ビジョン
- Price:Other