We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Biomass boiler.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Biomass boiler Product List and Ranking from 29 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Sep 17, 2025~Oct 14, 2025
This ranking is based on the number of page views on our site.

Biomass boiler Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 17, 2025~Oct 14, 2025
This ranking is based on the number of page views on our site.

  1. 第一産機 Miyagi//Manufacturing and processing contract
  2. イクロス Osaka//Industrial Machinery
  3. ダレスサンドロジャパン Fukuoka//Energy
  4. 4 サムソン 本社・工場 Kagawa//Energy
  5. 5 巴商会 Tokyo//others

Biomass boiler Product ranking

Last Updated: Aggregation Period:Sep 17, 2025~Oct 14, 2025
This ranking is based on the number of page views on our site.

  1. Simple Oil-Fired Boiler (Steam Boiler) "Turbo (TU) Series" サムソン 本社・工場
  2. RPF-compatible small biomass boiler 第一産機
  3. Biomass boiler utilizing waste as fuel イクロス
  4. 4 DIPIU Corporation Biomass Energy Wood Briquettes ダレスサンドロジャパン
  5. 4 Mechanical Briquette Press Machine "BRIK Series" ダレスサンドロジャパン

Biomass boiler Product List

61~75 item / All 97 items

Displayed results

Waste incineration biomass boiler

Target items: wood chips, paper scraps, beverage residues, plant-based waste, waste plastic solid fuel, sludge, and various other types of waste.

The "Biomass Boiler for Waste Incineration" incinerates waste generated within the factory and supplies steam from the boiler to the company's own factory, thereby reducing energy costs associated with existing boilers that use heavy oil, gas, etc. By preheating the combustion air sent to the combustion chamber from the boiler, it reduces heat loss and enhances boiler efficiency. It also contributes to improved combustion efficiency, resulting in less incomplete combustion and reduced clinker formation. 【Features】 ■ Significant reduction in carbon dioxide emissions ■ Reduction in fuel costs by utilizing waste ■ Capable of burning raw materials with high moisture content ■ When installed alongside Yasujima's YKD-type stirring dryer, it enables continuous processing of waste drying and combustion of dried materials ■ Reduction in drying costs by utilizing exhaust gas in the dryer *For more details, please refer to the PDF document or feel free to contact us.

  • Boiler

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Biomass boiler

We will achieve a significant cost reduction (30%) in industrial waste disposal expenses!

We would like to introduce a case study of the biomass boiler we have handled. Our company is capable of manufacturing equipment tailored to the boilers specified by our customers, allowing for the integration of various boiler systems. We also provide various devices such as bag filters for air pollution prevention, and we support everything from design and manufacturing to maintenance. 【Production Overview】 ■ Raw materials: Paper mill residue (83.5%) + Waste cooking oil (14.5%) + Waste clay (2%) ■ Processing capacity: 50 tons/day ■ Operating time: Continuous operation for 24 hours

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Biomass Power Generation Device "EPP20"

A power generation device that can efficiently gasify biomass fuel combustion!

The "EPP20" is a renewable energy solution with an output of 20 kW/h that sets itself apart from conventional large power generation systems. By utilizing a unique patented multi-stage gasification structure, it has successfully achieved flexibility and efficiency that are not found in traditional biomass generators. [Features] - Capable of very efficiently gasifying biomass fuel from combustion - Flexibility *For more details, please download the PDF or feel free to contact us.

  • Generators and transmission motors

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Biomass Boiler "Pelletfire PLUS"

[Looking for Agents] Operating floor for combustion furnaces! Optimizes combustion and automatically removes ash through floor operation.

The "Pelletfire PLUS" is a biomass boiler with an output of 45-135 kW, capable of connecting two or more units. The main target facilities include hot springs, hotels, pools, offices, schools, welfare facilities, and district heating network facilities, catering to a heat demand equivalent to an oil consumption of 10,000 to 120,000 liters. We are currently seeking distributors for this product. Please feel free to contact us. 【Features】 ■ High-efficiency combustion chamber ■ Operating floor of the combustion chamber ■ Silicon carbide combustion chamber ■ Boiler operation ■ High-efficiency heat exchanger ■ Large-capacity ash collection container *For more details, please refer to the PDF document or feel free to contact us.

  • Boiler

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Business Description] Consulting for the utilization of wood biomass energy.

Investigating the current situation in detail and the possibility of installing new equipment! We provide broad support to our customers.

When introducing a biomass boiler, there are various considerations to examine. First of all, is it possible to introduce a biomass boiler? What scale is most suitable? Where is the best location for installation? How much fuel will be used once it is installed? What is the best method for connecting to existing equipment? And so on. Our company will examine these issues and support the construction of a biomass business that meets our customers' requirements. 【Overview】 ■ Investigation ■ Analysis ■ Proposal ■ Design ■ Consulting *For more details, please refer to the PDF materials or feel free to contact us.

  • Boiler

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Boiler Installation Case] Yamada Residence

Introducing a case study of the introduction of biomass boilers for hot water and heating purposes in private homes!

We would like to introduce a case where our company executive, Yamada, installed the KWB "Classicfire 30" at his home in Hokkaido. While being involved in the import of agricultural and forestry machinery, I had several opportunities to participate in practical training in Austria and Germany. During those times, when invited to local homes for meals, I was surprised to find that the interiors were warm and very comfortable, with many of them using biomass boilers as their heat source. Therefore, when I decided to build my own house, I chose to install a biomass boiler. I handled everything from assembly to piping myself, and for parts I didn't understand, I asked a local contractor for help. What I learned was that it wasn't particularly difficult. 【Case Overview】 ■ Installed Boiler: Classicfire 30 ■ Year of Installation: 2014 ■ Heat Applications: Hot water and heating for a private residence *For more details, please refer to the PDF document or feel free to contact us.

  • Boiler

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Boiler Installation Case Study] Day Service Center Kazeoto

Significant cost reduction in fuel expenses compared to the initial plan! A case study of introducing a boiler to a welfare facility.

We would like to introduce a case where the KWB "Multifire 50," which our company handles, was implemented at the Day Service Center Kazeoto. The facility operated by Workshop Zero and constructed by Terra has introduced the KWB boiler "Multifire 50" at a welfare facility in Tono City, Iwate Prefecture. This single unit covers all heating and hot water needs. 【Case Overview】 ■ Installed Boiler: Multifire 50 ■ Year of Installation: 2016 ■ Heat Applications: Hot water and heating in a welfare facility *For more details, please refer to the PDF document or feel free to contact us.

  • Boiler

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Boiler Installation Case Study] Mikuni Kanko Hotel / Hotel Bimatsu

Selecting boilers that can contribute to business revenue! Here are examples of their implementation in two facilities' hot springs.

We would like to introduce a case study of the KWB "Multifire 120" and "Powerfire 300" that our company handles. Marutsu Denpa, which is engaged in the heat supply business, has introduced KWB boilers at two facilities: Awara Onsen in Fukui Prefecture and Mikuni Tojinbo Onsen. (One location has two Multifire 120 units, and the other has two Powerfire 300 units.) The KWB boilers were selected because they are considered to contribute to the business's financial performance in terms of boiler efficiency, maintainability, electricity costs, and failure rates. 【Case Overview】 <Mikuni Kanko Hotel> ■Installed Boiler: Multifire 120 ■Year of Installation: 2016 ■Heat Application: Hot water supply and heating in the hot spring facility *For more details, please refer to the PDF document or feel free to contact us.

  • Boiler

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Case Study of Biomass Boiler Introduction] Thermal and Electric Supply to Hospitals

Thermal power supply to hospitals! Introducing a case study on the implementation of a biomass boiler.

This is an introduction to a case where a biomass boiler was installed at the Hiratori Town Wood Biomass Center for the purpose of supplying thermal and electric energy to a hospital. The center serves as a facility for combined heat and power (CHP) supply to the adjacent hospital, utilizing the waste heat from a small-scale CHP to dry high-moisture content chips, which are then distributed to the small-scale CHP and our boilers. The thermal energy supplied is used for hot water and heating. It is a facility capable of autonomous operation, ensuring stable supply so that the hospital, which serves as a disaster prevention base, and the community center designated as an evacuation site do not become non-functional during emergencies. 【Case Overview】 ■ Main Equipment Supplied - KWB biomass boiler 300kW - Thermal storage tank 6,000L - Inverter pump - Hot water module - Heat transfer pipes (PEX) *For more details, please refer to the PDF document or feel free to contact us.

  • Boiler

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Case Study of Biomass Boiler Introduction] Regional Heat Supply to Apartment Complexes

Heat supply to 20 residential units, offices, and common building! Case study on the introduction of a biomass boiler.

We would like to introduce a case where a biomass boiler was installed for hot water supply and floor heating in the Daiyachi Collective Housing. Our company carried out the design of the heat supply network. Two pellet boilers serve as the heat source, supplying heat for hot water and floor heating to each building via a heat station. By using two boilers, flexible operation can be achieved to match the load in both summer and winter. 【Case Overview】 ■ Main Equipment Supplied - KWB biomass boiler 65kW - 3,000L thermal storage tank - Inverter pump - Heating module - Heat transfer pipes (PEX) *For more details, please refer to the PDF document or feel free to contact us.

  • Boiler

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Case Study of Biomass Boiler Installation] Heat Supply for Foot Bath and Kitchen Hot Water at a Roadside Station

Hot water supply for foot baths and kitchen hot water is being provided! Case study of biomass boiler installation.

We would like to introduce a case where a biomass boiler was installed at the Michi-no-Eki Miyoshi Village Hinanosato. To prioritize heat supply to the foot bath, supply control to the kitchen hot water is implemented while monitoring the temperature status of the thermal storage tank. When the temperature set below the thermal storage tank's sensor is reached, the pump stops. 【Case Overview】 ■ Main Equipment Supplied - KWB biomass boiler 28.6kW - Thermal storage tank 3,000L - Inverter pump - Flow control valve *For more details, please refer to the PDF document or feel free to contact us.

  • Boiler

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Case Study of Biomass Boiler Introduction] Heat Supply to Hot Spring Accommodation Facilities

Heat supply for heating and hot water is being provided! Case study of biomass boiler introduction.

We would like to introduce a case where a biomass boiler was installed at the Tangge Onsen Misato-kan for the heating, hot water supply, and heating of the bathing accommodation facilities. The previously used kerosene heaters, electric heaters, and heat pumps have been discontinued, achieving 100% replacement with a 240kW (120×2 units) boiler. By using two boilers, flexible operation has become possible to match the load during summer and winter. 【Case Overview】 ■ Main Equipment Supplied - KWB biomass boiler 120kW - 3,000L thermal storage tank - Inverter pump - Combined header - Heat transfer pipes (PEX) *For more details, please refer to the PDF document or feel free to contact us.

  • Boiler

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Case Study of Biomass Boiler Installation] Heat Supply to the Town Hall Building

Distributing the heat from the thermal storage tank through the header, circulating for heating and cooling! A case study of heat supply to the municipal office building.

This is an introduction to a case where a biomass boiler was installed for heating and cooling at the Nakanojo Town Hall and Nakanojo Town Health Center. With a 300 kW biomass boiler, the biomass coverage rate achieved is 100% for heating and over 90% for cooling. Regarding cooling, due to the characteristics of the absorption chiller, selecting equipment based on peak load results in oversized equipment. Therefore, during the summer peak, the existing absorption chiller on the town hall side is used as a supplement. [Case Overview] ■ Main Equipment Supplied - KWB 300 kW Biomass Boiler - 6,000L Thermal Storage Tank - Flow Control Valve - Combined Supply and Return Header *For more details, please refer to the PDF document or feel free to contact us.

  • Boiler

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Case Study of Biomass Boiler Installation] Heat Supply to Day-Use Bathing Facilities and Clinics

Implementation of heat supply for hot water and floor heating (winter only)! Case study of biomass boiler introduction.

We would like to introduce a case study of the introduction of a biomass boiler at Nakanojo Town's Shima Seiryu no Yu and Shima Remote Medical Clinic. The 120 kW biomass boiler covers the base load, and by using an 8,000L thermal storage tank, the system can also handle large loads during peak times, such as the year-end and New Year holidays when the number of bathers increases. Additionally, the biomass coverage rate has achieved nearly 100%. [Case Overview] ■ Main Equipment Supplied - KWB 120 kW biomass boiler - 8,000L thermal storage tank - Inverter pump - Hot water supply module - Heating module *For more details, please refer to the PDF document or feel free to contact us.

  • Boiler

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Case Study of Biomass Boiler Installation] Heat Supply to Day-Use Bathing Facilities

Heat supply for bathtub heating, heating (floor heating, air conditioning), and hot water supply! Introducing examples of bathing facilities.

We will introduce a case study of the introduction of a biomass boiler at the Mounohana Onsen Haginoyu. The 300kW biomass boiler covers the base load, and during peak times when the number of bathers increases, such as in winter or during the New Year holidays, the system can instantaneously utilize auxiliary boilers according to the temperature conditions of the thermal storage tank, allowing it to handle large loads. Additionally, the biomass coverage rate has achieved over 95%. 【Case Overview】 ■ Main Equipment Supplied - KWB 300kW biomass boiler - 6,000L thermal storage tank - Inverter pump - Hot water supply module - Heat conduction pipe (PEX) *For more details, please refer to the PDF document or feel free to contact us.

  • Boiler

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration