We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Construction Method.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Construction Method Product List and Ranking from 112 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Nov 19, 2025~Dec 16, 2025
This ranking is based on the number of page views on our site.

Construction Method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Nov 19, 2025~Dec 16, 2025
This ranking is based on the number of page views on our site.

  1. E&Dテクノデザイン Aichi//Testing, Analysis and Measurement
  2. 三和グランド Tokyo//Building materials, supplies and fixtures
  3. ラスコジャパン Hyogo//Building materials, supplies and fixtures
  4. 4 メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡 Tokyo//Building materials, supplies and fixtures
  5. 5 朝日護謨工業所 Osaka//Rubber products

Construction Method Product ranking

Last Updated: Aggregation Period:Nov 19, 2025~Dec 16, 2025
This ranking is based on the number of page views on our site.

  1. Mangle roll for textile machinery (steam-resistant) 朝日護謨工業所
  2. Permeable blast furnace slag paving material "Color Sand" 三和グランド
  3. No paint leaks from the gaps in the protective covering! Edge painting protective method LCL method. シャープ化学工業 大阪本社
  4. Attention those struggling with ivy clinging to fences! Introducing 'Bariosu Net'! 小泉製麻 神戸本社
  5. 4 Designing office spaces! "Paintable zinc coating" ローバル

Construction Method Product List

346~349 item / All 349 items

Displayed results

Technical basis for the permeability coefficient of permeable paving material "Color Sand"

Introducing technical information about permeable blast furnace slag pavement "Color Sand"!

This document explains the technical basis for the permeability coefficient in "permeable blast furnace slag pavement (colored sand)." Our paving materials use granulated blast furnace slag as a raw material, which falls under the classification of sand and gravel. Therefore, we conducted the "constant head permeability test" to measure the permeability coefficient. The result of the constant head permeability test showed a measured value of 2.56×0.01 cm/sec. Thus, the required permeability coefficient for the sidewalk area in terms of "permeability" is a public standard value of 1.0×0.01 cm/sec. Our material exceeds this standard value by more than double, proving that it sufficiently meets the permeability performance required for sidewalk areas. [Overview] ■ The permeability coefficient was measured in accordance with the "Soil Permeability Testing Method" based on JISA1218. - Constant head permeability test... Applied to soils with relatively high permeability coefficients (sand and gravel). - Falling head permeability test... Applied to soils with relatively low permeability coefficients (clay, silt, etc.). ◎ Exceeds the standard value and sufficiently meets the permeability performance required for sidewalk areas. *For more details, please refer to the PDF document or external link page, or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Features of the TNF Method (1)

Introducing the features of our TNF method, which has reduced costs by about 30% compared to traditional pile foundations!

We would like to introduce the features of the "TNF Method," implemented by Yoshimitsu Corporation, which has over 1,300 achievements nationwide. In soft ground across the country, we carry out ground improvement to create an artificial bedrock suitable for the building. Compared to conventional methods (pile foundations), we can achieve approximately 30% cost reduction (for a total floor area of 1,000 m² and pile length of 30 m). Please feel free to contact us when you need our services. 【Features】 - Compared to conventional methods, there is no need for pile work, formwork work, or ground preparation work, resulting in a 50% reduction in construction time (for a total floor area of 1,000 m² and pile length of 30 m). - Since no piles are used, the demolition costs during building dismantling are also reduced. *For more details, please refer to the related links or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Features of the TNF Method (3)

No use of piles! Introducing the features of the TNF method, which can also reduce demolition costs during building demolition!

We would like to introduce the features of the "TNF Method," implemented by Yoshimitsu Corporation, which has over 1,300 successful projects nationwide. We carry out ground improvement to create an artificial bedrock suitable for buildings on soft ground across the country. Since we do not use piles, the demolition costs during building dismantling are also reduced. Please feel free to contact us when you need our services. 【Features】 ■ Approximately 30% cost reduction compared to conventional methods (pile foundation) (for a total floor area of 1,000 m² and pile length of 30 m) ■ Construction period shortened by 50% compared to conventional methods, as pile work, formwork work, and ground preparation work are not required (for a total floor area of 1,000 m² and pile length of 30 m) *For more details, please refer to the related links or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Column] Types of Bases

I would like to introduce a column article.

What types of bases exist within a company? ■Management philosophy: The base that unifies the organization ■Employees who can practice reporting, communication, and consultation: The base of human resources ■Basic operations: The base for business execution (80% of work is routine) ■Core products: The base for products, sales, gross profit, and funding structure ■Main customers (A-rank customers): The base for customer, sales, and gross profit composition ■Busy periods, monthly: The base for calculating wins and losses over 12 rounds (how many wins and how many losses) Looking at a company's product composition, companies with core products are strong. If core products account for 700 million out of 1 billion in sales, the base rate is 70%, and it is sufficient to create products to fill the remaining 30%. However, a company with a base rate of 50% must also create products to fill the remaining 50%, and to overcome this, it must "anticipate time" in product creation to win. Anticipating time means that the period for creating products must equal the time frame of 1 month, 2 months, or 3 months ahead for the company, and if it is 3 months ahead, it must work as if it has 90 days of work in one month. *For detailed content of the column, please refer to the related links. For more information, feel free to contact us.

  • Management Seminar

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration