Heat prevention and heatstroke measures - Heat insulation construction case No. 1, Company S.
Fundamental heat measures (heatstroke prevention) and energy-saving by introducing heat insulation sheets! Case study of heat insulation work covering an area of 1439m2.
Company S was experiencing a rise in indoor temperatures during the summer, leading to soaring electricity costs. As a solution, they implemented heat insulation sheets as a fundamental measure against heat and for energy conservation. They used Prox heat insulation sheets (PRX-FN), stainless steel wire 2Φ, Pylack, turnbuckles, aluminum tape, double-sided tape, and crimp terminals. 【Construction Overview】 ■ Construction Period: August 7-15, 2021 (Total: 9 days) ■ Location: Nobeoka City, Miyazaki Prefecture ■ Roof Material: Slate roof ■ Area: 1439m2 *For more details, please refer to the PDF document or feel free to contact us.
- Company:石蔵商店 建材事業部
- Price:Other