[Warm Barrier Construction Example] Koza Steel Co., Ltd.
A case where the Warm Barrier method was implemented to address both heat and roof leak repairs in a single construction process!
We would like to introduce a case of heat insulation work carried out for Kobizai Steel Co., Ltd. Last summer, the temperature inside their factory rose to 42°C, and they were also troubled by leaks due to the aging of the building. In response, our company implemented the Warm Barrier method, which can address both heat and leak repairs in a single construction process. The construction period lasted a total of 4 days from January 30 to February 2, 2021. 【Construction Overview】 ■ Construction Period: January 30 (Saturday) to February 2 (Tuesday), 2021, a total of 4 days ■ Current Situation: Last summer, the temperature inside the factory rose to 42°C, and there were leaks due to the aging of the building ■ Measures: Implemented the Warm Barrier method, which can address heat and leak repairs in a single construction process ■ Location: Minami Kyushu Factory (Ebino City, Miyazaki Prefecture) ■ Roofing Material: Before construction - Large Wave Slate / After construction - Cover Roof ■ Area: 675m2 *For more details, please refer to the PDF document or feel free to contact us.
- Company:石蔵商店 建材事業部
- Price:Other