Product Case: VA/VE Proposal
We will introduce a case where the number of preparations was reduced, leading to a 15% shortening of delivery time and cost reduction!
Here is an example of a VA/VE proposal. During machining, products were set one by one in two vices for processing, which took a long time and became a bottleneck in the process. To address this, we designed a fixture that could hold five pieces at once and reviewed the process. As a result, the number of setup times was reduced, leading to a 15% reduction in delivery time and cost savings. [Case Summary] ■Issues - Products were set one by one in two vices for processing, which took a long time and became a bottleneck. ■Countermeasures - Designed a fixture that could hold five pieces at once and reviewed the process. *For more details, please refer to the related links or feel free to contact us.