[Case Study of EPT Corporation Equipment Installation] GE7FA Unit (3)
A case study on conducting research to solve the varnish problem and installing a deep cartridge filter!
This is an introduction to a case where a GE7FA unit was installed. This plant is a large power generation facility using GE7FA. Several varnish issues occurred at this plant, so research was conducted to resolve those problems, and deep cartridge filters were installed. After a 10-day test trial, the company decided to adopt EPT products for all units. [Overview] ■ Unit: GE7FA ■ Load Cycle: Peak Response ■ Oil Age: 4.5 years *For more details, please refer to the PDF document or feel free to contact us.
- 企業:プラントサービス
- 価格:Other