We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for 混合改良工法.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

混合改良工法 - List of Manufacturers, Suppliers, Companies and Products

混合改良工法 Product List

1~7 item / All 7 items

Displayed results

Ground improvement work ☆ Deep mixing method 'T-column method' * Certification obtained

This is a columnar improvement project of deep mixing treatment made possible by a self-developed stirring device (patent obtained) that enables high quality, low cost, and flexible responsiveness!

The T-column method is a construction technique that involves excavating the ground while injecting cement-based solidifying materials. Using a uniquely developed mixing device, it efficiently mixes and stirs the solidifying materials with the soil, creating stable, high-quality columns (columnar improved bodies). ■ Japan Building Center Foundation Construction Technology Review Certification (Building Technology)  BCJ-Review Certification-219 ■ NETIS Number KT-150083-A <Features> - Maximum column diameter of 1.60 m and maximum depth of 16 m. It is possible to construct up to the maximum column diameter using a base machine of 0.7 m³ class without the need for a three-point pile driver. It can accommodate various soil types, including clay, sandy soil, and loam, allowing for flexible responses to various road and surrounding conditions. - By using a fully automated plant, the slurry production process can be managed, ensuring stable quality. - In the case of small-scale buildings, a mold core can be created by taking depth mold samples. There is no need to collect boring cores, which reduces construction time and costs. *Documents can be downloaded from the related links.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Nihonbashi, Chuo-ku, Tokyo T-Column Method (Deep Mixing Method)

Introducing a case where the T-column method was implemented in a strict and narrow space to improve φ1000!

We would like to introduce a case study of the ground improvement work we conducted. In Nihonbashi, Chuo Ward, Tokyo, we performed the T-column method (deep mixing method) using construction machine S-15. We have introduced this case with images in the related links, so please take a look. 【Case Overview】 ■ Project Name: T-column Method (Deep Mixing Method) in Nihonbashi, Chuo Ward, Tokyo ■ Construction Date: June 5, 2021 ■ Location: Nihonbashi, Chuo Ward, Tokyo *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Ground Improvement using Deep Mixing Method (T-Column Method)

Construction example of ground column improvement work with a pile diameter of Φ160 at 3 locations, totaling 170 piles!

We would like to introduce a case study of the ground improvement work carried out by our company. In Machida City, Tokyo, the columnar improvement work for the newly constructed Tokiwa Ground within the Obirin Gakuen Machida Campus has begun, utilizing the original method "T-Column Method," which has obtained technical review certification and is a deep mixing treatment method. This project involves columnar improvement work for the ground, special L-shaped retaining walls, and L-shaped retaining walls. 【Case Overview】 ■ Project Name: Ground Improvement Using Deep Mixing Treatment Method (T-Column Method) ■ Construction Date: September 3, 2020 ■ Location: Tokiwa-cho, Machida City, Tokyo ■ Details: Pile diameter Φ160, total of 170 piles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] T Column Method, Odawara City, Kanagawa Prefecture

Introducing a case of ground improvement work conducted in Odawara City, Kanagawa Prefecture on September 30, 2021!

We would like to introduce a case study of the ground improvement work we conducted. In a factory located in Odawara City, Kanagawa Prefecture, we implemented our original deep mixing treatment method, the T-column method (Construction Technology Examination Certificate). We have provided images and details of this case in the related links, so please take a look. 【Case Overview】 ■ Project Name: T-Column Method in Odawara City, Kanagawa Prefecture ■ Construction Date: September 30, 2021 ■ Location: Odawara City, Kanagawa Prefecture *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Sagamihara City T-Column Method (Deep Mixing Method)

Introducing a case where the T-column method (deep mixing treatment method) was implemented using construction machine S-15!

We would like to introduce a case study of the ground improvement work we conducted. In Midori Ward, Sagamihara City, Kanagawa Prefecture, we implemented our original T-column method (deep mixing method) using construction machine S-15. A total of 176 locations were completed successfully. 【Case Overview】 ■ Project Name: Sagamihara City T-column Method (Deep Mixing Method) ■ Construction Date: October 5, 2021 ■ Location: Midori Ward, Sagamihara City, Kanagawa Prefecture ■ Details: Five types of pile diameters, with a small diameter of Φ800mm and a large diameter of Φ1300mm. *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] T-Column Method (Deep Mixing Method) in Machida City, Tokyo

Leave your foundation construction work to us! Excavation length of 9.0m, with 120 construction sites as examples.

We would like to introduce a case study of the ground improvement work we conducted. In Machida City, Tokyo, we implemented our original T-column method (deep mixing method). The excavation length was 9.0 meters, with 120 construction locations, and a silo for the solidifying agent was installed for the work. We have provided images of this case study in the related links, so please take a look. 【Case Overview】 ■ Project Name: T-column Method (Deep Mixing Method) in Machida City, Tokyo ■ Construction Date: October 9, 2021 ■ Location: Machida City, Tokyo *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Sagamihara City, Midori Ward, T Column New Construction and Renovation Work

A total of 290 construction locations with an excavation length of approximately 10m! An example of columnar improvement work using the T-column method.

We would like to introduce a case study of the ground improvement work conducted by our company. In a vast area in Tsukui, Sagamihara City, we performed columnar improvement work using our original deep mixing method and T-column method. Due to the construction involving 290 locations and an excavation depth of approximately 10 meters, we installed a 30-ton silo and plant for the solidifying agent. The solidifying agent was delivered daily, and the work was successfully completed. 【Case Overview】 ■ Project Name: T-Column New Construction and Renovation Work in Midori Ward, Sagamihara City ■ Construction Date: March 16, 2020 ■ Location: Chigira, Midori Ward, Sagamihara City *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration