iPROS Manufacturing
  • Search for products by classification category

    • Electronic Components and Modules
      Electronic Components and Modules
      55914items
    • Machinery Parts
      Machinery Parts
      70743items
    • Manufacturing and processing machinery
      Manufacturing and processing machinery
      95515items
    • Scientific and Physics Equipment
      Scientific and Physics Equipment
      33004items
    • Materials
      Materials
      34868items
    • Measurement and Analysis
      Measurement and Analysis
      52713items
    • Image Processing
      Image Processing
      14547items
    • Control and Electrical Equipment
      Control and Electrical Equipment
      50373items
    • Tools, consumables, and supplies
      Tools, consumables, and supplies
      62939items
    • Design and production support
      Design and production support
      11703items
    • IT/Network
      IT/Network
      40966items
    • Office
      Office
      13068items
    • Business support services
      Business support services
      39949items
    • Seminars and Skill Development
      Seminars and Skill Development
      5817items
    • Pharmaceutical and food related
      Pharmaceutical and food related
      23117items
    • others
      59295items
  • Search for companies by industry

    • Manufacturing and processing contract
      7356
    • others
      5051
    • Industrial Machinery
      4435
    • Machine elements and parts
      3289
    • Other manufacturing
      2871
    • IT/Telecommunications
      2516
    • Trading company/Wholesale
      2454
    • Industrial Electrical Equipment
      2318
    • Building materials, supplies and fixtures
      1821
    • software
      1653
    • Electronic Components and Semiconductors
      1574
    • Resin/Plastic
      1494
    • Service Industry
      1401
    • Testing, Analysis and Measurement
      1132
    • Ferrous/Non-ferrous metals
      979
    • environment
      702
    • Chemical
      631
    • Automobiles and Transportation Equipment
      560
    • Printing Industry
      506
    • Information and Communications
      431
    • Consumer Electronics
      422
    • Energy
      321
    • Rubber products
      311
    • Food Machinery
      305
    • Optical Instruments
      284
    • robot
      270
    • fiber
      250
    • Paper and pulp
      232
    • Electricity, Gas and Water Industry
      173
    • Pharmaceuticals and Biotechnology
      165
    • Warehousing and transport related industries
      144
    • Glass and clay products
      142
    • Food and Beverage
      134
    • CAD/CAM
      121
    • Educational and Research Institutions
      108
    • retail
      106
    • Medical Devices
      99
    • Ceramics
      95
    • wood
      87
    • Transportation
      83
    • Medical and Welfare
      61
    • Petroleum and coal products
      60
    • Shipbuilding and heavy machinery
      53
    • Aviation & Aerospace
      47
    • Fisheries, Agriculture and Forestry
      39
    • self-employed
      23
    • Public interest/special/independent administrative agency
      19
    • equipment
      19
    • Mining
      17
    • Materials
      15
    • Research and development equipment and devices
      14
    • Finance, securities and insurance
      13
    • Government
      13
    • Individual
      10
    • Restaurants and accommodations
      8
    • Police, Fire Department, Self-Defense Forces
      7
    • cosmetics
      7
    • Laboratory Equipment and Consumables
      3
    • Contracted research
      3
    • Raw materials for reagents and chemicals
      2
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Electronic Components and Modules
  • Machinery Parts
  • Manufacturing and processing machinery
  • Scientific and Physics Equipment
  • Materials
  • Measurement and Analysis
  • Image Processing
  • Control and Electrical Equipment
  • Tools, consumables, and supplies
  • Design and production support
  • IT/Network
  • Office
  • Business support services
  • Seminars and Skill Development
  • Pharmaceutical and food related
  • others
Search for Companies
  • Search for companies by industry

  • Manufacturing and processing contract
  • others
  • Industrial Machinery
  • Machine elements and parts
  • Other manufacturing
  • IT/Telecommunications
  • Trading company/Wholesale
  • Industrial Electrical Equipment
  • Building materials, supplies and fixtures
  • software
  • Electronic Components and Semiconductors
  • Resin/Plastic
  • Service Industry
  • Testing, Analysis and Measurement
  • Ferrous/Non-ferrous metals
  • environment
  • Chemical
  • Automobiles and Transportation Equipment
  • Printing Industry
  • Information and Communications
  • Consumer Electronics
  • Energy
  • Rubber products
  • Food Machinery
  • Optical Instruments
  • robot
  • fiber
  • Paper and pulp
  • Electricity, Gas and Water Industry
  • Pharmaceuticals and Biotechnology
  • Warehousing and transport related industries
  • Glass and clay products
  • Food and Beverage
  • CAD/CAM
  • Educational and Research Institutions
  • retail
  • Medical Devices
  • Ceramics
  • wood
  • Transportation
  • Medical and Welfare
  • Petroleum and coal products
  • Shipbuilding and heavy machinery
  • Aviation & Aerospace
  • Fisheries, Agriculture and Forestry
  • self-employed
  • Public interest/special/independent administrative agency
  • equipment
  • Mining
  • Materials
  • Research and development equipment and devices
  • Finance, securities and insurance
  • Government
  • Individual
  • Restaurants and accommodations
  • Police, Fire Department, Self-Defense Forces
  • cosmetics
  • Laboratory Equipment and Consumables
  • Contracted research
  • Raw materials for reagents and chemicals
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. others
  3. 東京テクノ
  4. Product/Service List
others
  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

東京テクノ

EstablishmentMay 1997
capital1000Ten thousand
number of employees20
addressTokyo/Machida-shi/3731-6 Aihara Town
phone042-783-8353
  • Official site
last updated:Mar 10, 2025
東京テクノlogo
  • Contact this company

    Contact Us Online
  • Company information
  • Products/Services(54)
  • catalog(0)
  • news(0)

東京テクノ List of Products and Services

  • category

1~45 item / All 54 items

Displayed results

class="retina-image"

[Construction Example] Underground Obstacle Removal - Multi-Drill Method

Introduction of the original tool "Kachi Waku-kun"! Pile removal work using the multi-drilling method.

We would like to introduce a case study of underground obstacle removal conducted by our company. At a site in Honmoku, Yokohama, an existing PHC pile with a depth of 28m and a diameter of 600mm broke during extraction, leading to a request for underground obstacle removal from our company. Using our original tool "Kachi-Wakun," we performed the removal using a casing with a diameter of 1,000mm and the all-casing method with the SR-45 multi-drill excavator. 【Construction Overview】 ■ Project Name: Introduction of "Kachi-Wakun" and pile removal using the multi-drill method ■ Construction Date: September 27, 2023 ■ Location: Yokohama City, Kanagawa Prefecture *For more details, please refer to the related links or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Sagamihara City, Midori Ward T-Column Method (Deep Mixing Method)

There are original construction machines and unique construction methods! An example using a 30t silo with the T-column method.

We would like to introduce a case study of the ground improvement work we conducted. In Midori Ward, Sagamihara City, we implemented our original T-column method (deep mixing method). This was carried out using a newly purchased 30t silo. Our company has many achievements with original construction equipment and unique methods. You can find more details about the case in the related links. 【Case Overview】 ■ Project Name: T-column Method (Deep Mixing Method) in Midori Ward, Sagamihara City ■ Construction Date: December 22, 2021 ■ Location: Midori Ward, Sagamihara City ■ Details: Φ1000 L=10.0m 173 pieces *For more information, please refer to the PDF materials or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] T-Column Method (Deep Mixing Method) in Machida City, Tokyo

Leave your foundation construction work to us! Excavation length of 9.0m, with 120 construction sites as examples.

We would like to introduce a case study of the ground improvement work we conducted. In Machida City, Tokyo, we implemented our original T-column method (deep mixing method). The excavation length was 9.0 meters, with 120 construction locations, and a silo for the solidifying agent was installed for the work. We have provided images of this case study in the related links, so please take a look. 【Case Overview】 ■ Project Name: T-column Method (Deep Mixing Method) in Machida City, Tokyo ■ Construction Date: October 9, 2021 ■ Location: Machida City, Tokyo *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Sagamihara City T-Column Method (Deep Mixing Method)

Introducing a case where the T-column method (deep mixing treatment method) was implemented using construction machine S-15!

We would like to introduce a case study of the ground improvement work we conducted. In Midori Ward, Sagamihara City, Kanagawa Prefecture, we implemented our original T-column method (deep mixing method) using construction machine S-15. A total of 176 locations were completed successfully. 【Case Overview】 ■ Project Name: Sagamihara City T-column Method (Deep Mixing Method) ■ Construction Date: October 5, 2021 ■ Location: Midori Ward, Sagamihara City, Kanagawa Prefecture ■ Details: Five types of pile diameters, with a small diameter of Φ800mm and a large diameter of Φ1300mm. *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] T Column Method, Odawara City, Kanagawa Prefecture

Introducing a case of ground improvement work conducted in Odawara City, Kanagawa Prefecture on September 30, 2021!

We would like to introduce a case study of the ground improvement work we conducted. In a factory located in Odawara City, Kanagawa Prefecture, we implemented our original deep mixing treatment method, the T-column method (Construction Technology Examination Certificate). We have provided images and details of this case in the related links, so please take a look. 【Case Overview】 ■ Project Name: T-Column Method in Odawara City, Kanagawa Prefecture ■ Construction Date: September 30, 2021 ■ Location: Odawara City, Kanagawa Prefecture *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Ground Improvement using Deep Mixing Method (T-Column Method)

Construction example of ground column improvement work with a pile diameter of Φ160 at 3 locations, totaling 170 piles!

We would like to introduce a case study of the ground improvement work carried out by our company. In Machida City, Tokyo, the columnar improvement work for the newly constructed Tokiwa Ground within the Obirin Gakuen Machida Campus has begun, utilizing the original method "T-Column Method," which has obtained technical review certification and is a deep mixing treatment method. This project involves columnar improvement work for the ground, special L-shaped retaining walls, and L-shaped retaining walls. 【Case Overview】 ■ Project Name: Ground Improvement Using Deep Mixing Treatment Method (T-Column Method) ■ Construction Date: September 3, 2020 ■ Location: Tokiwa-cho, Machida City, Tokyo ■ Details: Pile diameter Φ160, total of 170 piles *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Nihonbashi, Chuo-ku, Tokyo T-Column Method (Deep Mixing Method)

Introducing a case where the T-column method was implemented in a strict and narrow space to improve φ1000!

We would like to introduce a case study of the ground improvement work we conducted. In Nihonbashi, Chuo Ward, Tokyo, we performed the T-column method (deep mixing method) using construction machine S-15. We have introduced this case with images in the related links, so please take a look. 【Case Overview】 ■ Project Name: T-column Method (Deep Mixing Method) in Nihonbashi, Chuo Ward, Tokyo ■ Construction Date: June 5, 2021 ■ Location: Nihonbashi, Chuo Ward, Tokyo *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Atsugi City Surface Improvement Using Mixing Bucket

Introducing a case of surface improvement related to new construction work conducted in Atsugi City, Kanagawa Prefecture!

We would like to introduce a case study of ground improvement work carried out by our company. In Atsugi City, Kanagawa Prefecture, we performed surface improvement work associated with the new construction of the Atsugi Fire Station South Mouri Branch. A mixing bucket was attached to a 0.7 backhoe, and we mixed 162 tons of solidifying material for an area of 893 m². 【Case Overview】 ■ Project Name: Surface Improvement in Atsugi City Using a Mixing Bucket ■ Construction Date: October 14, 2020 ■ Location: Nagase, Atsugi City, Kanagawa Prefecture *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Cast-in-Place Pile Construction Using Full Circumference Rotary Casing Method

Efficient and smooth construction with unique ingenuity! A case study of site foundation pile construction conducted in Machida City.

We would like to introduce a case study of the ground improvement work we have conducted. We performed the construction of foundation piles for public works in Machida City using the full rotary all-casing method. We strive for efficient and smooth construction tailored to the site conditions with our unique innovations. 【Case Overview】 ■Project Name: Site-cast pile construction using the full rotary all-casing method in Machida City ■Construction Date: July 24, 2020 ■Location: Machida City, Tokyo *For more details, please refer to the PDF materials or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Sagamihara City, Midori Ward, T Column New Construction and Renovation Work

A total of 290 construction locations with an excavation length of approximately 10m! An example of columnar improvement work using the T-column method.

We would like to introduce a case study of the ground improvement work conducted by our company. In a vast area in Tsukui, Sagamihara City, we performed columnar improvement work using our original deep mixing method and T-column method. Due to the construction involving 290 locations and an excavation depth of approximately 10 meters, we installed a 30-ton silo and plant for the solidifying agent. The solidifying agent was delivered daily, and the work was successfully completed. 【Case Overview】 ■ Project Name: T-Column New Construction and Renovation Work in Midori Ward, Sagamihara City ■ Construction Date: March 16, 2020 ■ Location: Chigira, Midori Ward, Sagamihara City *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] New Warehouse Construction T-Column Method

Carefully planned and constructed to match the building! Introducing examples from the site of a new warehouse construction project.

We would like to introduce a case study of ground improvement work carried out by our company. At the site of a new warehouse construction in Chigasaki City, Kanagawa Prefecture, we implemented our original deep mixing method and T-column method. The improvement diameters varied widely, with the largest being Φ1400mm and the smallest Φ800mm, totaling five different sizes. We planned and executed the work meticulously to match the building's requirements. 【Case Overview】 ■Project Name: New Warehouse Construction T-Column Method ■Construction Date: September 30, 2019 ■Location: Chigasaki City, Kanagawa Prefecture *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Removal of Underground Obstacles at Kuramae Building, Taito Ward

Introducing a case study of underground obstacle removal using the MD250 and SR-45 multi-drill excavators!

We would like to introduce a case study of underground obstacle removal conducted by our company. In Taito Ward, Tokyo, we carried out the removal of underground obstacles using the MD250 with a caterpillar width of 2990mm and the SR-45 multi-drill excavator. For the removal of underground obstacles with a casing diameter of Φ1000, construction machines with a caterpillar width of 3000mm or less are specialized and are effective in narrow spaces. 【Case Overview】 ■Project Name: Underground Obstacle Removal at Kuramae Building, Taito Ward ■Construction Date: September 4, 2019 ■Location: Kuramae, Taito Ward, Tokyo *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Removal of Existing Piles in a Super-Narrow Site of Approximately 56m2 2

Numerous construction achievements in narrow spaces! Introducing construction examples using the SR-45 multi-drill machine.

We would like to introduce a case study of underground obstacle removal conducted by our company. In Kojimachi, Chiyoda-ku, Tokyo, we carried out the removal of existing foundation piles on a site of approximately 56m2, which is extremely small. The machinery used was the SR-45, and the construction was performed using the multi-drill method. [Case Overview] ■ Project Name: Removal of Existing Foundation Piles on an Extremely Small Site of Approximately 56m2 ■ Construction Date: September 13, 2022 ■ Location: Kojimachi, Chiyoda-ku, Tokyo *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles (8)

In the multi-drilling method, tools are selected and constructed according to the situation! Original tools are also developed.

On our company website, we introduce case studies of underground obstacle removal. This page features Part 8 of our series on removed underground obstacles. For more details, please refer to the related links. Our company has also developed original tools and has achieved many results in various field situations. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles (7)

Introducing actual underground obstacles! We select tools according to the situation and carry out the construction.

On our company website, we introduce case studies of underground obstacle removal. This page features Part 7 of our series on removed underground obstacles. For more details, please refer to the related links. We have included images of actual underground obstacles, so please take a look. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles (6)

Track record of construction in various fields! Consistent in-house construction from ground surveys to ground improvement work is possible.

On our company website, we introduce case studies of underground obstacle removal. This page features Part 6 of our series on removed underground obstacles. For more details, please refer to the related links. Our company is capable of consistent in-house construction from ground surveys to ground improvement work. Please feel free to contact us if you have any requests. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles (5)

Removal of underground obstacles, ground improvement work, site preparation piles, etc.! For foundation work, please contact our company.

On our company website, we introduce case studies of underground obstacle removal. This page features Part 5 of the special on removed underground obstacles. For more details, please refer to the related links. For foundation work such as underground obstacle removal, ground improvement work, existing pile extraction work, site development piles, excavation support work, and installation/removal of construction platforms, please contact us. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles (4)

Sudden underground obstacles! Various construction methods suitable for the site allow for cutting, removal, and backfilling of underground obstacles.

On our website, we introduce case studies of underground obstacle removal. This page features Part 4 of our special on removed underground obstacles. For more details, please refer to the related links. If underground obstacles suddenly arise, please contact us. 【Methods for Underground Obstacle Removal】 ■ Multi-drill method (equivalent to BG method) ■ All-casing method (equivalent to BG method) *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles (3)

We have published a feature on underground obstacles! For your foundation work needs, please feel free to contact us.

On our company website, we introduce case studies of underground obstacle removal. This page features Part 3 of our special on removed underground obstacles. For more details, please refer to the related links. For requests regarding foundation work, including underground obstacle removal, ground improvement work, existing pile extraction work, site preparation piles, excavation support work, and installation/removal of construction platforms, please feel free to contact us. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Featured Removal of Subsurface Obstacles (2)

Many achievements in various situational sites! For underground obstacle removal work, please contact our company.

On our company website, we introduce case studies of underground obstacle removal. This page features Part 2 of our special on removed underground obstacles. For more details, please refer to the related links. Please contact us for underground obstacle removal work. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles

For inquiries and requests regarding foundation work, contact us! We feature underground obstacles removed using our developed tools.

On our company website, we introduce case studies of underground obstacle removal. On this page, we feature underground obstacles that were removed using tools developed by our company. For more details, please check the related links. Additionally, we have included images of the removal status from January 2022, so please take a look. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] SR45 Multi-Drill Method 25m Underground Obstacle Removal

We are conducting a wide range of foundation work! Here is an example of underground obstacle removal carried out in Chigasaki City.

We would like to introduce a case of underground obstacle removal work conducted by our company as part of a public project. The work was carried out in Chigasaki City. An underground obstacle was encountered around 10 meters, making it impossible to proceed with the Aboron method, which led to our receiving the request and securing the order. Details of the case are provided in the related link, so please take a look. 【Case Overview】 ■ Project Name: SR45 Multi-Drill Method 25m Underground Obstacle Removal ■ Construction Date: October 28, 2021 ■ Location: Chigasaki City, Underground Obstacle Removal ■ Details: Φ800 GL-25m *For more information, please download the PDF from the related link or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] SR45 Multi-Drill Method Underground Obstacle Removal

Introducing examples of smooth removal made possible by using our independently developed tools!

We would like to introduce a case study of underground obstacle removal conducted by our company. In Nihonbashi, Chuo-ku, Tokyo, where the Shinkansen runs nearby, we used the SR45 multi-drill to remove a site construction pile with a diameter of Φ1200 and a depth of GL-22m. The removal of the site construction pile in a narrow area was extremely challenging, but by utilizing our uniquely developed Kelly grab, 3D bucket, and lightweight power jack, we were able to achieve a smooth removal. 【Case Overview】 ■ Project Name: SR45 Multi-Drill Method - Underground Obstacle Removal ■ Construction Date: September 11, 2021 ■ Location: Hon-Ishicho, Nihonbashi, Chuo-ku, Tokyo ■ Details: Φ1200 GL-22m *For more details, please download the PDF from the related link or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Inagi Enokido Underground Water Pipe Removal Work

The leader length can be freely adjusted according to the height above the ground! Here are some examples using the MD250.

We would like to introduce a case of underground obstacle removal conducted by our company. In Inagi City, Tokyo, we carried out underground obstacle removal work due to low overhead clearance. The removal work is being performed using the MD250. By changing the length of the leader, it becomes possible to carry out underground obstacle removal work even under such low power lines. 【Case Overview】 ■ Project Name: Inagi Enokido Underground Water Pipe Removal Project ■ Construction Date: August 17, 2021 ■ Location: Inagi City, Tokyo *For more details, please download the PDF from the related link or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Underground Obstacle Removal Work Using a Full Rotation Machine Φ2500

Maximum depth of 39m! Here is a case study of the removal of Φ400-600 PC piles that were present throughout the site.

We would like to introduce a case of underground obstacle removal that we conducted. The removal of existing piles was carried out using a Φ2500 full rotation machine on a vast site in Saiwaicho, Kanazawa Ward, Yokohama City. The removal of Φ400-600 PC piles, with a maximum depth of 39m, was conducted over approximately two months using a 150t crane. 【Case Overview】 ■ Project Name: Underground Obstacle Removal Work using Φ2500 Full Rotation Machine ■ Construction Date: June 4, 2021 ■ Location: Kanagawa Prefecture, Yokohama City, Kanazawa Ward *For more details, please download the PDF from the related link or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Chuo Ward, Tokyo, Nihonbashi - Underground Obstacle Removal Work in a Narrow Site

Achievements in responding to diverse site conditions! Here is an example of removing obstacles such as sleepers located 10 cm from the wall.

We would like to introduce a case of underground obstacle removal that we conducted. In Nihonbashi, Chuo Ward, Tokyo, we received a request for the removal of underground obstacles located 10 cm from an adjacent wall. It was a site with limited space for wall construction, but we used the multi-purpose pile driving and extraction machine MD250 to remove old obstacles such as railway sleepers. 【Case Overview】 ■ Project Name: Underground Obstacle Removal Project in a Limited Space, Nihonbashi, Chuo Ward, Tokyo ■ Construction Date: May 15, 2021 ■ Location: Nihonbashi, Chuo Ward, Tokyo *For more details, please download the PDF from the related link or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Chuo Ward, Tokyo - Underground Obstacle Removal Work

Lifted using the multi-drill method! A case of removing obstacles made of hard machi stone.

We would like to introduce a case of underground obstacle removal that we conducted. In a site adjacent to the Shuto Expressway in Chuo Ward, Tokyo, we removed a hard block of rubble that had been left under the old revetment. Using the multi-drill excavator SR-45, which has the capability to remove obstacles even in adjacent areas, we lifted the rubble using the multi-drill method. 【Case Overview】 ■ Project Name: Underground Obstacle Removal Project in Chuo Ward, Tokyo ■ Construction Date: October 12, 2020 ■ Location: Nihonbashi Hamacho, Chuo Ward, Tokyo *For more details, please download the PDF from the related link or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Removal of Underground Continuous Walls in Niiza City, Saitama Prefecture

Using our original special gloves! A case of underground continuous wall removal in an underground space.

We would like to introduce a case of underground obstacle removal conducted by our company. In Niiza City, Saitama Prefecture, we lowered the main machine, the SR-45 multi-drill, to the second basement level and performed the removal of the underground continuous wall in the underground space. Using our original special grab, we removed the soil cement of the continuous wall and the H-beams measuring 400×200 using the multi-drill method. Finally, we divided the site construction piles into four parts for removal. 【Case Overview】 ■ Project Name: Underground Continuous Wall Removal Project, Niiza City, Saitama Prefecture ■ Construction Date: August 11, 2020 ■ Location: Niiza City, Saitama Prefecture *For more details, please download the PDF from the related link or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Hamamatsu City, Shizuoka Prefecture - Removal of Columnar Improvement Piles

Leave your foundation construction work to us! A case of removing underground obstacles after the removal of 65 columnar improvement piles.

We would like to introduce a case of underground obstacle removal that we conducted. For a construction request in Hamamatsu City, Shizuoka Prefecture, we used the multi-drill excavator SR-45 to remove 65 columnar improvement piles with a diameter of 1200 mm using the multi-drill method. We have provided images of this case in the related links, so please take a look. 【Case Overview】 ■ Project Name: Columnar Improvement Pile Removal Project, Hamamatsu City, Shizuoka Prefecture ■ Construction Date: June 19, 2020 ■ Location: Nishi Ward, Hamamatsu City, Shizuoka Prefecture *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Removal of Underground Obstacles in Minato Ward & Foundation Pile Driving Work at 30m

Feel free to consult us when you're in trouble! Here are some examples of cases where we encountered underground obstacles and received removal requests.

We would like to introduce a case of underground obstacle removal that we conducted in Takanawa, Minato-ku, Tokyo. During the construction work using the Aboron method, we encountered an underground obstacle at a depth of 18 meters, which made it impossible to continue the work, leading to a request for removal from our company. Using the multi-drill excavator SR-45, we carried out the removal of the underground obstacle using the multi-drill method, and after the obstacle was removed, we also proceeded with the installation of the foundation piles for the tower crane, measuring 350×350H. 【Case Overview】 ■ Project Name: Underground Obstacle Removal & 30m Foundation Pile Installation in Minato-ku ■ Construction Date: March 11, 2020 ■ Location: Takanawa, Minato-ku, Tokyo *For more details, please download the PDF from the related link or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Inzai City, Chiba Prefecture - Underground Continuous Wall Removal Work at New Construction Site

Please leave ground improvement work and ground surveys to us! An example of underground continuous wall removal.

We would like to introduce a case of underground obstacle removal that we conducted. This was carried out at a new construction site in Inzai City, Chiba Prefecture. Using the SR-45 multi-drill rig, we removed a cement milk and H-steel underground continuous wall through the multi-drilling method. For more details about the case, please check the related link. 【Case Overview】 ■ Project Name: Underground Continuous Wall Removal at New Construction Site in Inzai City, Chiba Prefecture ■ Construction Date: February 8, 2020 ■ Location: Inzai City, Chiba Prefecture ■ Details: Core material H400×200, GL-16.0m *For more information, please download the PDF from the related link or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Removal of Underground Obstacles in Soundproof House

Strong performance in narrow and low sites! Case study using the multi-drill rig MD250.

We would like to introduce a case of underground obstacle removal conducted by our company. In Jujo, Kita-ku, Tokyo, we performed underground obstacle removal work using the multi-drilling method inside an existing soundproof house with a ceiling height of 11.6m. We used the multi-drill excavator MD250 to carry out the removal at a low headroom. 【Case Overview】 ■ Project Name: Underground Obstacle Removal Work inside Soundproof House ■ Construction Date: December 9, 2019 ■ Location: Jujo, Kita-ku, Tokyo *For more details, please download the PDF from the related link or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Underground Obstacle Removal Work (Low-Headroom Slide Method)

Introducing a case of underground obstacle removal work using the low-altitude slide construction method!

We would like to introduce a case study of underground obstacle removal work conducted by our company. In Edogawa Ward, Tokyo, we successfully completed the removal of underground obstacles using the low headroom slide method, involving a φ1200, 48m section, with an overhead restriction of 5.8m. This method allows for the removal of underground obstacles both under beams and inside buildings. 【Case Overview】 ■ Project Name: Underground Obstacle Removal Work (Low Headroom Slide Method) ■ Construction Date: March 29, 2022 ■ Location: Edogawa Ward, Tokyo *For more details, please download the PDF from the related link or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Study] Special Feature on Removed Underground Obstacles - March

We have a track record of construction in various fields! We can cut, remove, and backfill underground obstacles using various methods suitable for the site.

On our company website, we introduce case studies of underground obstacle removal. This page features a special report on underground obstacles that were removed in March 2022. For more details, please refer to the related links. Our company is capable of cutting, removing, and backfilling underground obstacles using various methods suitable for the site. Please feel free to contact us if you have any requests. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Removal of Subsurface Obstacles March Part 2

Introducing actual underground obstacles! We have a proven track record in various situational sites.

On our website, we introduce case studies of underground obstacle removal. This page features the second installment of our special on underground obstacles removed in March 2022. For more details, please check the related links. We have included images of actual underground obstacles, so please take a look. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Multi Drill SR-45 (Equivalent to BG) Low Headroom Size

Introduction to the case of underground obstacle removal conducted on April 1, 2022!

On our company website, we introduce numerous case studies of underground obstacle removal. On this page, we present the sizes for low-headroom construction using the multi-drill method (equivalent to BG method) in drawings. Our company selects tools according to the situation and carries out the construction. Please feel free to contact us if you have any requests. 【Methods for Underground Obstacle Removal】 ■ Multi-drill method (equivalent to BG method) ■ All-casing method (equivalent to BG method) *For more details, please download the PDF from the related link or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Full Rotation (Equivalent to BG) Underground Obstacle Removal

A case of removing various underground obstacles while protecting the wall of the hole!

We would like to introduce a case of underground obstacle removal conducted by our company. In Atsugi City, Kanagawa Prefecture, we carried out underground obstacle removal work using a full-circle rotary all-casing method (equivalent to the BG method). While protecting the borehole walls, we removed various underground obstacles. We have introduced this case with images in the related links, so please take a look. 【Case Overview】 ■ Project Name: Full-Circle Rotary (BG Equivalent) Underground Obstacle Removal ■ Construction Date: April 2, 2022 ■ Location: Atsugi City, Kanagawa Prefecture ■ Details: φ1000 to φ1800, L=11 to 21m (68 pieces) *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Multi-Drill Method (Equivalent to BG Method)

We will perform cutting, removal, and backfilling suitable for the site! A case of removing PHC piles that could not be completely taken out.

Here is an introduction to a case study of underground obstacle removal conducted by our company. In Yokosuka City, Kanagawa Prefecture, we executed the work using the multi-drilling method (equivalent to BG method). We removed PHC piles that could not be extracted using the pull-out method. Upon receiving notice that extraction was impossible, we promptly began the work and successfully completed the project. 【Case Overview】 ■ Project Name: Multi-Drilling Method (Equivalent to BG Method) ■ Construction Date: May 12, 2022 ■ Location: Yokosuka City, Kanagawa Prefecture ■ Details: φ1000 GL-25m *For more details, please download the PDF from the related link or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Underground Obstacle Removal Method in Tokyo (Equivalent to BG Method)

Original tools developed! Examples of removal using the all-casing crushing method.

We would like to introduce a case study of underground obstacle removal conducted by our company. This project took place in Nakano Ward, Tokyo, using an underground obstacle removal method equivalent to the BG method. It features the SR-45 standard mast specification. Piles that could not be removed using the pull-out method were removed using the all-casing crushing method. We have provided images of this case study in the related links, so please take a look. 【Case Overview】 ■ Project Name: Underground Obstacle Removal Method (Equivalent to BG Method) ■ Construction Date: May 19, 2022 ■ Location: Nakano Ward, Tokyo ■ Details: SR-45 standard mast specification, depth of 16m *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Multi-Drill Method Equivalent to BG Method

Select from various construction machines!

We would like to introduce a case study of underground obstacle removal conducted by our company. In Tokyo, we carried out construction using a multi-drill method equivalent to the BG method. We removed PHC piles and pine piles with a diameter of 1500 mm and a length of 22 m. We have provided images of this case study in the related links, so please take a look. 【Case Overview】 ■ Project Name: Multi-Drill Method Equivalent to BG Method ■ Construction Date: June 10, 2022 ■ Location: Tokyo ■ Details: Diameter 1500 mm, Length 22 m *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Underground Obstacle Removal Work in an Extremely Narrow Site

Using MD250! Here are examples of successful construction achieved through our technology and track record.

We would like to introduce a case study of underground obstacle removal work that our company has conducted. In Bunkyo Ward, Tokyo, we carried out underground obstacle removal work on a super-narrow site. Using the MD250, we worked in a challenging area with a site area of approximately 82m2. Thanks to our multi-drill and the technology and achievements we have cultivated so far, we were able to complete the work successfully. 【Case Overview】 ■ Project Name: Underground Obstacle Removal Work on a Super-Narrow Site ■ Construction Date: June 28, 2022 ■ Location: Bunkyo Ward, Tokyo ■ Site Foundation Piles: Φ800, 13m, 6 pieces *For more details, please download the PDF from the related link or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Underground Obstacle Removal Work for Load-Bearing Slab

Introducing a case of underground obstacle removal conducted in Hachioji City, Tokyo on July 20, 2022!

We would like to introduce a case where we removed underground obstacles from a pressure-resistant slab in Hachioji City, Tokyo, using the multi-drilling method (equivalent to the BG method). During the construction, we used the "SR-45 multifunctional drilling machine multi-drill" manufactured by the Italian company SoilMec. In the related links, we have introduced this case with images, so please take a look. 【Case Overview】 ■ Project Name: Underground Obstacle Removal Work for Pressure-Resistant Slab ■ Construction Date: July 20, 2022 ■ Location: Hachioji City, Tokyo *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Removal of Existing Foundation Piles in an Extremely Narrow Site of Approximately 56m2

Numerous achievements in construction on narrow sites and along walls! We will introduce examples of construction using the multi-drill method.

We would like to introduce a case study of underground obstacle removal conducted by our company. In Kojimachi, Chiyoda Ward, Tokyo, we carried out the removal of existing foundation piles on a site of approximately 56m², which is extremely small. The machinery used was the SR-45, and the construction was performed using the multi-drill method. The multi-drill allows for construction in extremely narrow sites where buildings are closely packed together. For more details about this case, please check the related links. 【Case Overview】 ■ Project Name: Removal of existing foundation piles on a site of approximately 56m² ■ Construction Date: September 5, 2022 ■ Location: Kojimachi, Chiyoda Ward, Tokyo ■ Details: Φ1000 L=19.0m, 3 locations *For more information, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Wall Installation Using SR-45 Original Kelly Grab

Introducing a case study using our original in-house developed tool, the special Kelly grab!

Here is an introduction to a case study of underground obstacle removal conducted by our company. Construction work at the wall edge in Nihonbashi Bakurocho, Tokyo. The site conditions are in a narrow area within the city. We carried out the removal of the existing structure using the SR-45 multi-drill excavator and employed our original tool, the special Kelly grab. 【Case Overview】 ■ Project Name: Wall Edge Construction Using SR-45 Original Kelly Grab ■ Construction Date: December 14, 2022 ■ Location: Nihonbashi Bakurocho, Tokyo ■ Details: Φ1000 L=3.5m, 15 locations *For more details, please download the PDF from the related link or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Underground structure removed with in-house developed Kelly grab.

We can also handle wall-side construction in the city! Examples of efficient and safe removal are available.

We would like to introduce a case study of underground obstacle removal that our company has conducted. This involves the removal of a Φ1000 underground structure in Nihonbashi Bakurocho, Tokyo. Using our original Kelly grab developed in-house, we can carry out the removal efficiently and safely. We have provided images of this case in the related links, so please take a look. 【Case Overview】 ■ Project Name: Removal of underground structure using our in-house developed Kelly grab ■ Construction Date: December 21, 2022 ■ Location: Nihonbashi Bakurocho, Tokyo ■ Details: Removal of Φ1000 underground structure *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
Prev 12 Next
  • ASEANエリア タイ マレーシア シンガポール ベトナム フィリピン 電子部品保管に適した倉庫 保税・非保税の両方に対応した倉庫スペック 日本同様の高精度な在庫管理とピース単位の入出庫対応 拠点間を繋げるASEANのネットワーク
  • 省エネと品質・生産性向上へ 不良品率低減 作業環境改善 人手不足解消 廃棄物削減 鋳造現場に 加熱技術 排水処理に 水処理技術 検査工程に 自働化技術 カタログ&取組み紹介資料進呈
    • Contact this company

      Contact Us Online

    Products

    • Search for Products

    Company

    • Search for Companies

    Special Features

    • Special Features

    Ranking

    • Overall Products Ranking
    • Overall Company Ranking

    support

    • site map
    IPROS
    • privacy policy Regarding external transmission of information
    • terms of service
    • About Us
    • Careers
    • Advertising
    COPYRIGHT © 2001-2025 IPROS CORPORATION ALL RIGHTS RESERVED.
    Please note that the English text on this page is automatically translated and may contain inaccuracies.