Responsibility for design and construction of solar power systems at Attic without subcontracting.
Atik is a responsible design and construction contractor that handles total planning in-house, from the design of solar power generation (including all-electric systems) to construction and aftercare, based on its extensive track record of roofing work for major housing manufacturers over many years. Since we do not subcontract, we can quickly respond to various customer requests while keeping construction costs down.
Inquire About This Product
basic information
Kyocera Solar Power Generation System Design and Construction
Price information
-
Delivery Time
P2
Applications/Examples of results
■Mr. E's residence in Ashikaga City, Tochigi Prefecture ■Construction date: June 2005 ■Construction period (installation): 2 days ■Selected model specifications: Kyocera ■Mounting method: Direct bracket A type ■Modules: R180T-02, 17 pieces, 3.06 kW
Company information
We have 20 years of experience in the construction of roof structures for major housing manufacturers, and we are also utilizing that technology to engage in solar power generation. The era of households generating their own energy is upon us. Additionally, we will propose the introduction of an all-electric system focused on safety and comfort in renovations.


![Solar power generation system [Construction achievements Case 29]](https://image.mono.ipros.com/public/product/image/c20/1377866040/IPROS_11134414856447293000.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 418]](https://image.mono.ipros.com/public/product/image/52d/2000205103/IPROS7685116380136733627.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 419]](https://image.mono.ipros.com/public/product/image/981/2000205109/IPROS4134602952942764123.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 446]](https://image.mono.ipros.com/public/product/image/fcb/2000207712/IPROS7537217986727884456.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 578]](https://image.mono.ipros.com/public/product/image/307/2000247545/IPROS1257218408110693651.jpg?w=280&h=280)


![[For Schools] Hakodate City: Reduce Electricity Costs and Renewable Energy with Self-Consumption Solar Power!](https://image.mono.ipros.com/public/product/image/2117111/IPROS17666030435834940385.jpg?w=280&h=280)



![[Leveling Correction] Leveling correction of concrete floors "Teratec Method"](https://image.mono.ipros.com/public/product/image/d08/1267539002/IPROS70063422645318547243.jpeg?w=280&h=280)

