Solar Power Generation System [Construction Results Case 26]
Sharp 3.607 kW ND-160AV ND-114CV ND-061LV ND-061RV
Responsibility for design and construction of solar power systems at Attic without subcontracting.
Product Introduction: Atik is a responsible design and construction contractor that handles total planning in-house, from the design to construction and aftercare of solar power generation (including all-electric systems), based on a wealth of experience gained from many years of roofing work for major housing manufacturers. Since we do not subcontract, we can respond quickly to various customer requests while keeping construction costs down.
Inquire About This Product
basic information
Sharp Solar Power Generation System Design and Construction
Price information
-
Delivery Time
P2
Applications/Examples of results
■N Residence, Meiwa Town, Ora District, Gunma Prefecture ■Construction Date: - ■Construction Period (Installation & Electrical): 3 days ■Selected Model Specifications: Sharp ■Mounting Method: Support Bracket Method ■Modules: ND-160AV ND-114CV ND-061LV ND-061RV 3.607 kW
Company information
We have 20 years of experience in the construction of roof structures for major housing manufacturers, and we are also utilizing that technology to engage in solar power generation. The era of households generating their own energy is upon us. Additionally, we will propose the introduction of an all-electric system focused on safety and comfort in renovations.


![Solar power generation system [Construction record Case 170]](https://image.mono.ipros.com/public/product/image/6a5/2000140041/IPROS8275335541663161247.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 212]](https://image.mono.ipros.com/public/product/image/056/2000149285/IPROS6554723797624916779.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 399]](https://image.mono.ipros.com/public/product/image/c60/2000204849/IPROS4491581123873859683.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 536]](https://image.mono.ipros.com/public/product/image/d23/2000235695/IPROS3528641777454154410.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 585]](https://image.mono.ipros.com/public/product/image/2bb/2000251522/IPROS317084319146362647.jpg?w=280&h=280)



![[For Schools] Kushiro City: Up to 29% Reduction in Electricity Costs! Self-Consumption Solar Power Generation](https://image.mono.ipros.com/public/product/image/2117111/IPROS13652222532333401906.jpg?w=280&h=280)
![[For Schools] Muroran City: Disaster Prevention with Self-Consumption Solar Power! Reducing Renewable Energy!](https://image.mono.ipros.com/public/product/image/2117111/IPROS10063704435844314889.jpg?w=280&h=280)

