Solar Power Generation System [Construction Record Case 35]
Sharp ND-114CV ND-061LV ND-061RV 3.120kw
Responsibility for design and construction of solar power systems at Attic without subcontracting.
Product Introduction: Atik is a responsible design and construction contractor that handles total planning in-house, from the design to construction and aftercare of solar power generation (including all-electric systems), based on extensive experience in roofing work for major housing manufacturers over many years. Since we do not subcontract, we can quickly respond to various customer requests while keeping construction costs down.
Inquire About This Product
basic information
Sharp Solar Power Generation System Design and Construction
Price information
-
Delivery Time
P2
Applications/Examples of results
■S Residence, Higashimurayama City, Tokyo ■Construction Date: December 2009 ■Construction Period (Installation & Electrical): 2 days ■Selected Model Specifications: Sharp ■Mounting Method: H Support Bracket Method ■Modules: ND-114CV ND-061LV ND-061RV 3.120kw
Company information
We have 20 years of experience in the construction of roof structures for major housing manufacturers, and we are also utilizing that technology to engage in solar power generation. The era of households generating their own energy is upon us. Additionally, we will propose the introduction of an all-electric system focused on safety and comfort in renovations.


![Solar Power Generation System [Construction Record Case 43]](https://image.mono.ipros.com/public/product/image/435/2000002818/IPROS62634642441019958.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 56]](https://image.mono.ipros.com/public/product/image/ea5/2000113293/IPROS831281147141017888.jpg?w=280&h=280)
![Solar power generation system [Construction Achievement Case 87]](https://image.mono.ipros.com/public/product/image/bd3/2000118292/IPROS5561057954735184181.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 228]](https://image.mono.ipros.com/public/product/image/fb8/2000150839/IPROS4146856528914797929.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 559]](https://image.mono.ipros.com/public/product/image/691/2000239966/IPROS3613148099734052242.jpg?w=280&h=280)
![[For commercial facilities] Kushiro City reduces electricity costs by up to 29% with self-consumption solar power!](https://image.mono.ipros.com/public/product/image/2117111/IPROS17172476485255629150.jpg?w=280&h=280)
![[Online Diagnosis in Progress] "O&M of Eiwatt's Solar Power Plant"](https://image.mono.ipros.com/public/product/image/c16/2000592466/IPROS42305847129123258566.jpeg?w=280&h=280)
![[Case Study] Special Nursing Home Sonosato](https://image.mono.ipros.com/public/product/image/017/2001174011/IPROS09378487409421656463.png?w=280&h=280)

![[For Warehousing Industry] Muroran City - Up to 29% Reduction in Electricity Costs! Self-Consumption Solar Power Generation](https://image.mono.ipros.com/public/product/image/2117111/IPROS5655258043583108487.jpg?w=280&h=280)