Solar Power Generation System [Construction Record Case 254]
Mitsubishi 3.33kw PV-MX185HA
Responsibility for design and construction of solar power systems at Attic without subcontracting.
Atik is a responsible design and construction contractor that handles total planning in-house, from the design to construction and aftercare of solar power generation (including all-electric systems), based on its extensive track record of roofing work for major housing manufacturers over many years. Since we do not subcontract, we can quickly respond to various customer requests while keeping construction costs down.
Inquire About This Product
basic information
Mitsubishi Solar Power Generation System Design and Construction
Price information
-
Delivery Time
P3
Applications/Examples of results
■M's residence, Utsunomiya City, Tochigi Prefecture ■Construction date: February 2011 ■Construction period (installation/electrical): 5 days ■Selected model specifications: Mitsubishi ■Mounting method: Metal horizontal roofing brackets ■Module: 3.33 kW PV-MX185HA
Company information
We have 20 years of experience in the construction of roof structures for major housing manufacturers, and we are also utilizing that technology to engage in solar power generation. The era of households generating their own energy is upon us. Additionally, we will propose the introduction of an all-electric system focused on safety and comfort in renovations.


![Solar Power Generation System [Construction Record Case 249]](https://image.mono.ipros.com/public/product/image/954/2000162285/IPROS4784772513935463454.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 291]](https://image.mono.ipros.com/public/product/image/98d/2000182604/IPROS8361147578480099190.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 305]](https://image.mono.ipros.com/public/product/image/0ae/2000182633/IPROS2168314671031167819.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 374]](https://image.mono.ipros.com/public/product/image/05c/2000194202/IPROS2726981555534766241.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 575]](https://image.mono.ipros.com/public/product/image/a54/2000247532/IPROS4110817372754971048.jpg?w=280&h=280)

![[Market Research Report] Smart Solar Power Generation Market](https://image.mono.ipros.com/public/product/image/dcf/2001230399/IPROS07477931965920190391.png?w=280&h=280)

![[Column] What is a PPA Business for Solar Power Generation?](https://image.mono.ipros.com/public/product/image/910/2000667969/IPROS37575095578906431765.png?w=280&h=280)
![[For commercial facilities] Up to 29% reduction in electricity costs for self-consumption solar power in Sapporo City!](https://image.mono.ipros.com/public/product/image/2117111/IPROS18080550218724141878.jpg?w=280&h=280)

![[Leveling Correction] Leveling correction of concrete floors "Teratec Method"](https://image.mono.ipros.com/public/product/image/d08/1267539002/IPROS70063422645318547243.jpeg?w=280&h=280)

