Responsibility for design and construction of solar power systems at Attic without subcontracting.
Atiku is a responsible design and construction contractor that handles total planning in-house, from the design of solar power generation (including all-electric systems) to construction and aftercare, based on extensive experience in roofing work for major housing manufacturers over many years. Since we do not subcontract, we can quickly respond to various customer requests while keeping construction costs down.
Inquire About This Product
basic information
Sharp Solar Power Generation System Design and Construction
Price information
-
Delivery Time
P2
Applications/Examples of results
■K's Residence, Setagaya Ward, Tokyo ■Construction Date: August 2011 ■Construction Period (Installation & Electrical): 2 days ■Selected Model Specifications: Sharp ■Mounting Method: Slate Method ■Module: 4.62kw ND-165AA
Company information
We have 20 years of experience in the construction of roof structures for major housing manufacturers, and we are also utilizing that technology to engage in solar power generation. The era of households generating their own energy is upon us. Additionally, we will propose the introduction of an all-electric system focused on safety and comfort in renovations.


![Solar Power Generation System [Construction Record Case 324]](https://image.mono.ipros.com/public/product/image/0f1/2000185183/IPROS4426635743097926934.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 347]](https://image.mono.ipros.com/public/product/image/288/2000192092/IPROS1037771116829127046.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 419]](https://image.mono.ipros.com/public/product/image/981/2000205109/IPROS4134602952942764123.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 608]](https://image.mono.ipros.com/public/product/image/d53/2000274047/IPROS588188999068948520.jpg?w=280&h=280)
![Industrial Solar Power Generation System [Construction Record Case 136]](https://image.mono.ipros.com/public/product/image/aed/2000303287/IPROS5690079556885159059.jpg?w=280&h=280)
![[Press Release] 'BeBeePROJECT' Launches on October 28](https://image.mono.ipros.com/public/product/image/f24/2001057926/IPROS51035445513090970490.png?w=280&h=280)

![[Proposal] We will carry out the design and construction of solar power generation systems!](https://image.mono.ipros.com/public/product/image/495/2000752361/IPROS95689897367959325842.png?w=280&h=280)

![[For Dairy Farmers] Kushiro City: Reduce electricity costs by up to 29% with self-consumption solar power!](https://image.mono.ipros.com/public/product/image/2117111/IPROS6827594471968536245.jpg?w=280&h=280)


