Tilt correction: "Side Pinning Method" for correcting building tilt.
Rotary driven piles are installed to the supporting ground without relying on the building's own weight! Installation is possible even during ongoing settlement.
"Side Piling Method (Helical Pile Method)" Using a dedicated machine, a helical pile with a connecting spiral plate is rotated and pressed into the supporting ground, increasing the load-bearing capacity of the building and preventing settlement. A hydraulic jack is attached to the bracket section to correct any tilt. The tilt correction can be repeated. This method is suitable for small-scale structures. 【Features】 ■ Can be constructed even during ongoing settlement ■ Can be constructed in narrow spaces (at least 50 cm distance from neighboring properties) ■ Ideal for correcting external structures *For more details, please refer to the PDF materials or feel free to contact us. Toll-free number: 0120-873-835
Inquire About This Product
basic information
【Construction Conditions】 ■Applicable Foundation Shape: All direct foundations ■Construction Depth: Approximately 10m ■Distance Limit from Adjacent Land: More than 50cm *For more details, please refer to the PDF materials or feel free to contact us. Toll-Free Number: 0120-873-835
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
【Purpose】 ■Correction of building tilt *For more details, please refer to the PDF document or feel free to contact us. Toll-free number: 0120-873-835
catalog(1)
Download All CatalogsNews about this product(4)
Company information
The main business activities of Mainmark involve "returning tilted floors and buildings to a level state" and "preventing existing floors and buildings from tilting." We primarily offer the "TerraTech Method," which allows us to level tilted floors without stopping operations, and we provide various construction proposals tailored to our customers' concerns, from investigation to execution. ■ Nationwide responsible construction with over 5,000 completed projects Mainmark has established offices in eight locations across the country and conducts responsible construction nationwide. We serve a wide range of clients, including factories, stores, warehouses, offices, and apartments. ■ Non-disruptive floor tilt and subsidence correction method "TerraTech Method" Our main service, the "TerraTech Method," is a patented technique that injects TerraTech resin (rigid polyurethane foam resin) into concrete floors that have developed tilts, subsidence, steps, or voids due to ground subsidence or earthquakes. The expansion force of the resin levels the sunken floor and fills the voids beneath it. This technology is also registered with the Ministry of Land, Infrastructure, Transport and Tourism's "NETIS," ensuring its reliability. Patent No. 4896949 "Method for Correcting Sunken Floors" NETIS Registration No. "QS-080007"