Solar Power Generation System [Construction Record Case 500]
Kyocera 5.4kw KHM200P-3CJ2CE
Responsible design and construction of solar power systems at Attic without subcontracting.
Atik is a responsible design and construction contractor that handles total planning in-house, from the design of solar power generation (including all-electric systems) to construction and aftercare, based on its extensive track record of roofing work for major housing manufacturers over many years. Since we do not subcontract, we can quickly respond to various customer requests while keeping construction costs down.
Inquire About This Product
basic information
Kyocera Solar Power Generation System Design and Construction
Price information
-
Delivery Time
P2
Applications/Examples of results
■S Residence, Saitama City, Saitama Prefecture ■Construction Date: March 2013 ■Construction Period (Installation & Electrical): 2 days ■Selected Model Specifications: Kyocera ■Mounting Method: Flat Roof Method ■Module: 5.4kw KHM200P-3CJ2CE
catalog(1)
Download All CatalogsCompany information
We have 20 years of experience in the construction of roof structures for major housing manufacturers, and we are also utilizing that technology to engage in solar power generation. The era of households generating their own energy is upon us. Additionally, we will propose the introduction of an all-electric system focused on safety and comfort in renovations.


![Solar Power Generation System [Construction Record Case 17]](https://image.mono.ipros.com/public/product/image/f8c/1377866028/IPROS_10737645282165748000.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 50]](https://image.mono.ipros.com/public/product/image/df1/2000112703/IPROS9151603304076706008.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 532]](https://image.mono.ipros.com/public/product/image/cc7/2000235683/IPROS7798227230847229696.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 546]](https://image.mono.ipros.com/public/product/image/98c/2000239278/IPROS4624149885877942645.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 570]](https://image.mono.ipros.com/public/product/image/166/2000246129/IPROS3046699337160333075.jpg?w=280&h=280)


![[Article] What are the features and benefits of solar power generation?](https://image.mono.ipros.com/public/product/image/290/2000704738/IPROS96795119391758232477.png?w=280&h=280)

![[For Commercial Facilities] Muroran City: Achieving both electricity cost savings and power outage measures with self-consumed solar power!](https://image.mono.ipros.com/public/product/image/2117111/IPROS16405979355836475567.jpg?w=280&h=280)


![Amenities Meter: Creating a Comfortable Working Space with IoT [Work Style Reform]](https://image.mono.ipros.com/public/product/image/6fb/2001027009/IPROS12754886358639934309.png?w=280&h=280)
