Significantly reduce management man-hours related to the plan! Visualization of processes enables future forecasting!
"Telegno-PM" is a small schedule management system handled by System Base Inc., which provides extensive support from the development to the operation of information systems. It allows for planning adjustments while monitoring the load, enabling efficient planning. Additionally, it can be integrated with your existing database. It significantly reduces the management workload associated with planning. 【Features】 ■ Integration with your existing database is possible ■ Planning adjustments can be made while monitoring the load, enabling efficient planning ■ Progress can be checked for each desired content by switching the display format ■ Screen images can be directly output to Excel *For more details, please refer to the PDF materials or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company was founded in 1973. Based in Kitamoto City, Iwate Prefecture, we operate as a community-oriented system integrator, providing detailed services tailored to our customers' industries, including manufacturing, distribution, retail, public institutions, and healthcare.



![[Manufacturing Site Improvement Case] There are tasks that only specific personnel can perform.](https://image.mono.ipros.com/public/product/image/a5a/2000671246/IPROS90626746624918739815.png?w=280&h=280)
![[Manufacturing Site Improvement Case] I want to standardize the work process.](https://image.mono.ipros.com/public/product/image/115/2000671263/IPROS56588593977376690230.png?w=280&h=280)
![[Manufacturing Site Improvement Case] Unable to grasp the difference between standard cost and actual cost.](https://image.mono.ipros.com/public/product/image/7bc/2000671269/IPROS32322614519231439450.png?w=280&h=280)

![Case Study of Katsuragi Industrial Co., Ltd. [Data processing time reduced from 3 hours to 4 minutes]](https://image.mono.ipros.com/public/product/image/478/2000328158/IPROS73098628448042483300.jpeg?w=280&h=280)
![[Information] Let's get to work! The story of implementing a production management system.](https://image.mono.ipros.com/public/product/image/3fc/2001159205/IPROS32005416390632008658.png?w=280&h=280)
![[Case Study of i-PROW] Meieisha Co., Ltd.](https://image.mono.ipros.com/public/product/image/bb1/2001533440/IPROS12687465427565943376.png?w=280&h=280)
![[Project Management] Systematization of timely budget vs. actual and progress management / workload distribution.](https://image.mono.ipros.com/public/product/image/541/2000532669/IPROS90911347152424454878.jpeg?w=280&h=280)
![[Case Study] Understand the achievements of the process and create appropriate estimates!](https://image.mono.ipros.com/public/product/image/72d/2000508506/IPROS15466670518527090442.png?w=280&h=280)



