Not a standard product, but completely custom-made! It can be installed to fit the installation space.
Here is an example of installing a simple lift at a factory in Kanazawa City, Ishikawa Prefecture. After completely removing the old lift that had become inoperable, we installed our Hyper Lift (simple lift) as a new installation. Since it can be freely designed and manufactured, in cases like this complete removal and renewal project, it can be installed without leaving any gaps, tailored to the installation space. [Case Study] ■ Y Factory, Kanazawa City, Ishikawa Prefecture ■ Installed Product: Simple Lift *For more details, please refer to the external link page or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the external link page or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the external link page or feel free to contact us.
catalog(2)
Download All CatalogsCompany information
Founded in 1954, our company is engaged in the sales and installation of elevators, as well as renovations and maintenance, and the sale of business supplies. We sell and install elevators suitable for various locations such as factories, warehouses, stores, apartments, buildings, and residences, and through designs that prioritize safety, we have maintained a zero-accident record since our establishment in 1954. In the fiscal year 2018, our annual performance for new installations and renewals of elevators reached 190 units. Our staff, with their extensive experience and know-how, will propose elevators tailored to meet our customers' needs.


![[Case of Simple Lift Installation] Installed a simple lift with a vertical shaft compartment / Elevator](https://image.mono.ipros.com/public/product/image/bcc/2000490180/IPROS37560191095031763837.png?w=280&h=280)
![[Case Study of Simple Lift Installation] Installing a simple lift (elevating equipment) to improve operational efficiency.](https://image.mono.ipros.com/public/product/image/130/2000490222/IPROS55636081004786222434.png?w=280&h=280)
![[Renewal and Repair Examples] Renovation and Renewal of Simple Lifts](https://image.mono.ipros.com/public/product/image/631/2000506759/IPROS72774415592072340432.png?w=280&h=280)
![[Case of Simple Lift Installation] Four hyper lifts installed in the factory.](https://image.mono.ipros.com/public/product/image/860/2000544556/IPROS81554739613224478359.png?w=280&h=280)
![[Case Study of Simple Lift Installation] Installation of a hyper lift for transporting printed materials.](https://image.mono.ipros.com/public/product/image/316/2000544609/IPROS20035867134349373979.png?w=280&h=280)





![[Ground Improvement] "High-Pressure Jet Mixing Method" Ground improvement directly beneath the building.](https://image.mono.ipros.com/public/product/image/e9b/2000228729/IPROS48084547774297501064.png?w=280&h=280)

