Video available that explains in 10 minutes! Pipe rust prevention 'NMR Pipe Protector'
Red rust prevention device for piping "NMR Pipe Protector"
Eliminates the need to replace old pipes! Extends the life of pipes for over 40 years! The effectiveness is proven by data.
The NMR Pipe Protector can be installed on the outside of pipes without cutting them, allowing for measures against red rust inside the pipes. It can transform existing red rust into black rust, rejuvenating the interior of the pipes! This means that you can continue to use the same pipes until the lifespan of the building without having to replace the old pipes. 【Features】 - Installed from the outside without cutting the pipes - Improves and prevents red rust inside the pipes - Allows for the continued use of existing pipes - No need to introduce chemicals or scrape the inside of the pipes, ensuring safety - No power supply required, zero running costs! 【TV Broadcast Video Available!】 We are streaming a video of the content that was aired on television. You can watch an overview of the NMR Pipe Protector in about 10 minutes. Customer testimonials from those who have actually implemented it are also featured. Please take a look. *This video was broadcast on February 28, 2019, on TOKYO MX's business program "Kigyo Tamashii." *Please feel free to contact us first.
Inquire About This Product
Related Videos
basic information
We also accept requests for free materials. Please feel free to contact Japan System Planning first. ◆◆◆◆◆ Japan System Planning Co., Ltd. ◆◆◆◆◆ Toll-free number: 0120-320-390 (Weekdays 9:00 AM - 5:30 PM)
Price information
We also accept requests for free materials. Please feel free to contact Japan System Planning first. ◆◆◆◆◆ Japan System Planning Co., Ltd. ◆◆◆◆◆ Toll-Free Number: 0120-320-390 (Weekdays 9:00 AM - 5:30 PM)
Delivery Time
※Please contact us first.
Applications/Examples of results
【Purpose】 - Measures against red rust deterioration in piping for water supply and air conditioning - Improvement of red water and red rust issues you may be facing 【Installation Locations】 Residential buildings such as apartments and housing complexes Accommodation facilities such as hotels and inns Medical facilities such as hospitals and nursing homes Installed in factories, banks, schools, office buildings, and more. Can be installed in four types of piping systems: water supply piping, air conditioning hot and cold water piping, hot water piping, and cooling piping. Installation does not require cutting the pipes; it is simply attached to the outside of the piping. Our specialized technicians will carry out the installation. ~ Domestic Installation Examples ~ Widely installed in apartments, as well as in the Imperial Theatre building, Yaeguchi Hall, major factories, and Kumamoto Red Cross Hospital. ~ International Installation Examples ~ In the UK, installations include Buckingham Palace, London City Hall, the British Museum, and the BBC, among others. Also installed in Vietnam and Taiwan. We also accept requests for free materials. Please feel free to contact Japan System Planning for more information. ◆◆◆◆◆ Japan System Planning Co., Ltd. ◆◆◆◆◆ Toll-Free Number: 0120-320-390 (Weekdays 9:00 AM - 5:30 PM)
Detailed information
-
Katsuyuki Kumano, President and CEO of Japan System Planning Co., Ltd.
-
<NMR Pipe Protector Installation> There is no need to cut the piping; it can be installed simply by attaching it to the outside of the pipes. Therefore, it can be implemented in a short period of about half a day to one day. The installation will be carried out by our specialized technical workers. We also accept requests for free materials. Please feel free to contact Japan System Planning first. ◆◆◆◆◆ Japan System Planning Co., Ltd. ◆◆◆◆◆ Toll-free number: 0120-320-390 (Weekdays 9:00 AM - 5:30 PM)
-
Revitalize the piping by converting red rust into black rust.
-
<Case Study on the Introduction to Serve Hotel Shibuya>
-
<Case Study on Introduction to Care House Shirasagi>
-
<Case Study on the Palace of Westminster (UK Parliament)>
-
<Case Study on Buckingham Palace>
-
<Case Study on the British Museum>
-
<Case Study for BBC>
catalog(5)
Download All CatalogsNews about this product(1)
Company information
~Extending the lifespan of old piping~ "NMR Pipe Protector" Cumulative installation record surpasses 4,400 buildings! (As of July 2025) Among them, over 3,100 buildings are condominiums. = Domestic Achievements = New Chitose Airport Domestic Terminal, JR Sapporo Station (JR Tower Building), Imperial Theatre Building (Tokyo Marunouchi), Yaesu Exit Hall, Famous Bookstore Building (Shinjuku), Hotel Toyokaku (Kyoto), Hotel Serve Shibuya, Shirakagi Care House (Saitama), Kawanishi Private Kushi Elementary School, Food Processing Factory, Major Automobile Manufacturer Factory (Fukuoka Prefecture), Kumamoto Red Cross Hospital, etc. = International Achievements = Buckingham Palace, London City Hall, British Museum, BBC, Christ's College, University of Cambridge, Royal Bank of Scotland, Harrods Department Store, Royal Garden Hotel London, UK Parliament, etc. ★ Featured in the Media "NMR Pipe Protector" ★ Selected as one of the top 10 rust prevention technologies in the world in 2020 and introduced in a U.S. magazine! Case studies and customer testimonials have been featured in many media outlets, including TV Tokyo's "World Business Satellite (WBS)", TOKYO MX's "Corporate Spirit", and specialized newspapers "Condominium Management News" and "Air Conditioning Times".